21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf

PDF 391 KB Posted

Attached to
FPCM-LAC-I001104-M035-RS
Solicitation number
0000036277
Issued by
Los Angeles County, California

About this file

This is a plumbing and roof plan drawing for a California State Prison project located in Lancaster, CA, prepared by Turley Mechanical Engineering & Associates Group and Hibser Yamauchi Architects for the California Department of Corrections and Rehabilitation (CDCR). The document specifically covers roof replacement work for Facility A Buildings 334 through 335, focusing on mechanical and plumbing roof plan remodeling for Phase 1 of the project. The drawing is dated August 31, 2023, and includes detailed technical specifications for rainwater drainage systems, roof drain calculations, and compliance with California Plumbing Code (CPC) requirements.

The drawing provides comprehensive technical details about roof areas, including equivalent roof area (EQA) calculations for multiple zones (Areas A1-A15 and C1-C2), with roof areas ranging from 200 to 2,200 square feet. The technical specifications outline precise requirements for roof drains, scuppers, and overflow mechanisms, specifying minimum drain sizes, opening dimensions, and drainage capacities based on 2022 CPC standards. The document includes approval stamps from the Office of the State Fire Marshal, indicating the plans have been reviewed and conditionally approved for fire and panic safety, with a final approval subject to field inspection.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 1 1.8 2 6 4 5 7 8 9 1110

B.4

A

B

D

C

J

E

F

G

H

K

K.8

L

M

1 111.8 2 3 4 5 6 7 8 9 105.7 7.3

A

B

B.7

D

E.7

G.3

J

K.7

L

M

LOW ROOF,

SEE

B/MPB302

11 11 11

11 11 11

10 10 10

(AREA A1)(AREA A2)(AREA A3) (AREA A4)(AREA A5)

(AREA A15)

1150 SQ.FT. EQA

(AREA A14)(AREA A13) (AREA A12)(AREA A11)

650 SQ.FT.

EQA

(AREA A6)

250 SQ.FT.

EQA

(AREA A7)

250 SQ.FT.

EQA

(AREA A8)

200 SQ.FT.

EQA

(AREA A9)

450 SQ.FT.

EQA

(AREA A10)

10 10 10 10

1800 SQ.FT. EQA2200 SQ.FT. EQA 1600 SQ.FT. EQA1500 SQ.FT. EQA

1150 SQ.FT. EQA1800 SQ.FT. EQA 2200 SQ.FT. EQA 1600 SQ.FT. EQA

1500 SQ.FT. EQA

OPEN END OF HIGH

ROOF TO LOW ROOF

G.3

J

K.7

L

M

(AREA C1)

400 SQ.FT. EQA

(AREA C2)

450 SQ.FT. EQA

118 9 10

Project Engineer:

U R L E YT M E C H A N IC A L

E N G I N E E R I N G

G R O U P, I N C.& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capitol Avenue

Sacramento, CA 95816

Project Manager:

GYang

Job Number:

Project Drafter: Login:

Plot Date: Aug 25, 2023 - 4:07pm

22107-PH1JT

JT

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R N

IA

D

E P A R

TM

E N

T O

F C

O R R

E C

TI

O

N S A

N D

R E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N S

TR

U C

TI

O

N A

N D M

A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N

L O

S A

N G

E L E S C

O U N T Y

T H

S T R

E E T , W

E S T

LA

N

C A S T E R

, C A

R E P L A C

E R

O O

F S

P H

A S E

A U G

U S T

W O

R K

IN

G D

R A W

IN

G

S

.1

A rc h it e ct s, I n c.

H

IB

S E R Y

A M

A U C

H I n d S tr e e t, S u it e

D a vi s, C

A

.7

.1 o ff ic e

.7

.4 f a x

REMODEL KEY NOTES

#### EQA

NOTE

EQUIVALENT AREA OF ROOF AREA PLUS AREA OF VERTICAL

WALLS, PER CPC 1103.4, 2019.

PER US WEATHER BUREAU TECHNICAL PAPER NO.40 CHART 14:

100-YEAR 1-HOUR RAINFALL (INCH), LOCAL RAIN WATER FALL RATE

IS BETWEEN 0.5"/HR AND 1.0"/HR. WHILE CONSIDERING A SAFETY

FACTOR, 2"/HR RAINFALL IS USED IN THIS PROJECT.

PER 2022 CPC TABLE 1103.1 AND TABLE 1103.2, MAX PROTECTED

ROOF AREA OF PIPES ARE SHOWING BELOW:

PIPING MAX PROTECTED ROOF AREA (SQ.FT.)

SIZE HORIZONTAL SLOPE VERTICAL PIPING

(INCH) 1

8"/LF 1

4"/LF 1

2"/LF ROOF DRAIN, LEADER

2" - - - 1440 3" 1,644 2,320 3,288 4,400 4" 3,760 5,300 7,520 9,200 5" 6,680 9,440 13,360 17,300 6" 10,700 15,100 21,400 27,000

PER 2022 CPC 1101.12.2.1, WHEN SCUPPER OR SIDE OPENING IS

USED FOR OVERFLOW, HEIGHT OF OPENING SHALL BE NO LESS

THAN 4", AND WIDTH SHALL BE NO LESS THAN CIRCUMFERENCE OF

THE ROOF DRAIN REQUIRED FOR THE AREA SERVED.

AN ALTERNATIVE MEANS IS USING SCUPPER INSTEAD OF THE ROOF

DRAIN FOR THE PRIMARY RAINWATER DRAINAGE. ALTERNATIVE

MEANS IS UNDER THE AGREEMENT WITH OF CDCR PROJECT

MANAGER. IN THIS CASE, HEIGHT OF OPENING SHALL BE NO LESS

THAN 4", AND WIDTH SHALL BE NO LESS THAN CIRCUMFERENCE OF

THE ROOF DRAIN REQUIRED FOR THE AREA SERVED. WHERE ROOF

DRAIN AND SCUPPER ARE COMBINED, THE HEIGHT OF OPENING

MUST BE A MINIMUM OF TWICE THE REQUIRED HEIGHT (MIN OF 8").

THE ABOVE DATA ARE ONLY MINIMUM REQUIREMENT OF DRAINS

AND PIPES. THEY CAN BE OVERSIZED IN THE PROJECT.

RAIN WATER CALCULATION

FOR AREA A1 THRU A15, MAX TOTAL EQUIVALENT ROOF AREA IS

2,200 SQ.FT. A MIN 3" ROOF DRAIN OR MIN 10"Wx4"H SCUPPER

OPENING IS SUFFICIENT TO SUPPORT EACH AREA. MIN OVERFLOW

SIDE WALL OPENING IS 10"Wx4"H. THE NEW PRIMARY AND

SECONDARY SIDE WALL OPENING ARE MEET THE CODE

REQUIREMENT.

FOR AREA C1 AND C2, MAX TOTAL EQUIVALENT ROOF AREA IS 450

SQ.FT. MIN 3" ROOF DRAIN AND 3" OVERFLOW DRAIN ARE

SUFFICIENT TO SERVE THE AREA.

MPB302

P L U

M B

IN

G

F A

C

IL

IT

Y A

B U

IL

D

IN

G

S

T

H R

U

A D

S E G

H U

R O

O F P

L A

N R

A

IN

W A

T E R

N NN N

01 (N) ROOF DRAIN RD-1 AND OVERFLOW DRAIN OFL-1. (N)DRAIN SIZE MATCH

(E) AND MIN 3". REFER TO ARCHITECTURAL DETAIL 12/A905.

11 (E) SCUPPER CONDUCTOR HEAD, MODIFY AS NEEDED FOR NEW SCUPPER

OPENING LOCATION

12 (N) SCUPPER CONDUCTOR HEAD, SIZE MATCH OTHER (E) CONDUCTOR HEAD

ON THE SAME WALL. INSTALLATION DETAILS SEE 4/S501.

10 (E) OR (N) PRIMARY SCUPPER AND (N)OVERFLOW SCUPPER FOR LOW ROOF.

EACH SCUPPER OPENING SHALL BE MIN 10"WIDE x 4"HIGH. THE LOCATION

OF (N) PRIMARY SCUPPER SHALL MATCH (E) OR (N)SCUPPER CONDUCTORS.

SEE ARCHITECTURAL DETAIL 28/A905.

V1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317

File details come from the government source that posted it. Updated .