21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf

PDF 1 MB Posted

Attached to
FPCM-LAC-I001104-M035-RS
Solicitation number
0000036277
Issued by
Los Angeles County, California

About this file

The document is a detailed architectural drawing set (Sheet A902) for roof replacement at California State Prison, Los Angeles County (LAC), prepared by the California Department of Corrections and Rehabilitation's Facility Planning, Construction and Management Division. The project, identified as "Replace Roofs - Phase 1", is located at 44750 60th Street West in Lancaster, California, and involves comprehensive roofing system modifications including roof hatch installations, parapet extensions, metal coping details, penetration flashings, scupper installations, and crossover bridge specifications. The drawings are dated August 31, 2023, with final approval from the Office of the State Fire Marshal received on 10/10/23 and 11/20/2023.

The technical drawings provide extensive engineering details for roof system upgrades, featuring PVC roofing assemblies, metal coping caps, flashing techniques, ladder extensions, and specific installation requirements for various roof components. The drawings include precise measurements, material specifications (such as 22 GA galvanized steel, PVC membranes, and stainless steel fasteners), and technical notes on installation methods, with particular attention to waterproofing, thermal performance, and structural integrity. The project appears to be a state-funded infrastructure improvement initiative targeting specific roof rehabilitation needs at the correctional facility, with meticulous engineering standards to ensure long-term performance and compliance with building and safety regulations.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(N) 1" INSULATED

MECHANICAL CURB

ROOF HATCH SECTION

SCALE� 1 1/2" 1 -0"

A900

(N) REGLET FLASHING

(N) SELF-ADHERED,

FLEX-FLASHING AND

UNDERLAYMENT, TYP.

(N) HOLD OPEN ARM W/

NYLON ROLLER PER MFG

(N) LIFTING MECHANISM

PER MFG.

(N) PVC ROOFING

ASSEMBLY, SEE DETAIL

(E) FIXED ACCESS

LADDER. EXTEND AS

NECESSARY.

(E) METAL DECK W/

CONCRETE FILL

(E) ROOF HATCH

(N) METAL STUD

3-5/8" X 18 GA

@ 16" O.C.

(N) 3/8" Ø HILTI KH-EZ SCREW

ANCHORS, 2" EMBED AT 16" CC

(MIN 3 PER SIDE); MIN 1-1/2" EDGE

DISTANCE.

(N) METAL TRACK

3-5/8" X 18 GA

#10 SCREW S, TYP.

18 GA GALVANIZED SHEET

STEEL AT PERIMETER TYP.

FASTEN WITH #10 SCREW S,

@ 6" CC EACH CONTACT

LADDER

EXTENSION

SEE DETAIL

(N) FRAME W/

CAPFLASHING

CORNERS FULL

WELDED

(N) LOCK STRIKE

PADLOCK HASP

MET. STUD NAILER

M

IN

ROOF HATCH CURB

SCALE� 3" 1 -0" ROOF HATCH CURB

(N) 1" INSULATED

MECHANICAL CURB

(N) SELF-ADHERED

FLEX-FLASHING

UNDERLAYMENT,

TYP.

(N) METAL FRAMING

SLOPE DN

1/2" 1 -0"

8"

PENETRATION FLASHING

SCALE� 3" 1 -0"

4"

TYP.

4"

TYP. 2

T

Y P

M

IN

(N) S.S. DRAWBAND, TYP.

(N) SEALANT, TYP.

(N) SM. RAIN COLLAR, TYP.

CONDUIT, VENT PIPE OR POST PENETRATION

(N) PVC 60MIL FLASHING

(N) LAP OR LIQUID SEALANT PER MFR. REQ S.

(N) PVC ROOFING ASSEMBLY, SEE

A900

EXTEND (E) PIPE TO MIN 12" ABOVE ROOF FINISH MEMBRANE.

ONE-PIECE BOOT FLASHING

SCALE� 3" 1 -0"

M

IN

(N) EXTENSION CONDUIT OR VENT PIPE, SIZE TO

MATCH (E)

(N) CONTINUOUS BEAD OF SEALANT, SEE SPEC 07 90 00

(N) STAINLESS STEEL CLAMPING RING

(N) PVC, ONE-PIECE BOOT, HEAT

WELDED PER MFR. REQUIREMENTS

(N) PVC ROOFING ASSEMBLY, SEE DETAIL

(E) CONCRETE DECK

A900

NOTES�

1. DO NOT CUT PREFABRICATED BOOT. IT MUST BE PULLED OVER

CONDUIT / VENT PIPE / POST.

2. PREFABRICATED BOOTS, AND MUST BE USED WHENEVER

POSSIBLE TO FLASH PENETRATIONS 1" TO 8" IN DIAMETER

3. IF PENETRATION DOESN T ALLOW FOR PIPE BOOT

INSTALLATION, USE ALTERNATE FLASHING METHOD. SEE DETAIL

EXTEND (E) PIPE TO MIN 12" ABOVE

ROOF FINISH MEMBRANE

(N) PIPE CLAMP

(E) PIPE TO REMAIN

PROVIDE (N) HILTI

FS-ONE MAX (OR OF

EQUAL) FIRESTOP

SEALANT AS NEEDED,

VIF, INSTALL PER MFR

REQUIREMENTS.

(N) LAP OR LIQUID SEALANT PER MFR. REQ S.

4"

LAP -OINT

(N) 22 GA. G.S.M. COPING CAP.

(N) METAL TRACK

(N) 3/8" Ø HILTI KWIK BOLT 3 SS

(COUNTERSUNK) EXPANSION ANCHOR

W/ 2" MIN. EMBED @ 4 -0" O.C. TYP.

(N) CMU PARAPET WALL

EXTENSION

S

LO

P E D

N

(N) PVC FLASHING TO WRAP

OVER PARAPET.

10 -0" MAX.

TO NEXT LAP -OINT

METAL COPING LAP -OINT DETAIL

SCALE� 3 -0" 1 -0"

NOTES�

1. (N) 22 GA. S.M. COPING REGLETS

TO BE PRE-FINISHED W/ KYNAR.

2. COLORS TO MATCH EXISTING.

3. SOLDER ALL -OINTS.

SLOPE DN

(N) 22 GA G.S.M. COPING CAP.

(N) 8" [ 18GA DBL STUD

(800S162-43) W/ #10 SMS @ 12" CC

EA FLANGE� 4" DIA HOLE AS

REQUIRED FOR BOLT ACCESS

(N) ADHESIVE COLD APPLIED

MEMBRANE LAPPED OVER TOP

PLATE AND 2" DOWN VERTICAL

SURFACES, TYP.

(N) 3/8" Ø HILTI KB-TZ2 SS

(COUNTERSUNK) EXPANSION

ANCHOR W/ 2" MIN. EMBED

@ 4 -0" O.C. TYP.

(N) CONT. CAULKING TYP.

(N) PVC FLASHING TO WRAP

OVER PARAPET.

NOTE�

1. FOR METAL COPING

LAP -OINT, SEE DETAIL

METAL CLEAT, 24 GA MIN

METAL CLEAT, 24 GA MIN

1/8 2" @ 36" CC

CONDITION 1 -

METAL COPING ON (N) CMU EXTENSION

SLOPE DN

(N) 22 GA G.S.M. COPING CAP.

(N) 8" [ 18GA DBL STUD

(800S162-43) W/ #10 SMS @ 12" CC

EA FLANGE� 4" DIA HOLE AS

REQUIRED FOR BOLT ACCESS

(N) ADHESIVE COLD APPLIED

MEMBRANE LAPPED OVER TOP

PLATE AND 2" DOWN VERTICAL

SURFACES, TYP.

(N) 3/8" Ø HILTI KB-TZ2 SS

(COUNTERSUNK) EXPANSION

ANCHOR W/ 2" MIN. EMBED

@ 4 -0" O.C. TYP.

(N) CONT. CAULKING TYP.

(N) PVC FLASHING TO WRAP

OVER PARAPET.

METAL COPING AT PARAPET EXTENSION

SCALE� 3 -0" 1 -0"

NOTE�

1. FOR METAL COPING

LAP -OINT, SEE DETAIL

(N) CMU PARAPET EXTENSION.

METAL CLEAT, 24 GA MIN

METAL CLEAT, 24 GA MIN

(N) CEMENT

PLASTER.

FINISH

AND

COLOR

TO MATCH

(E) WALL.

1/8 2" @ 36" CC

CONDITION 2 -

METAL COPING ON (E) CONCRETE PANEL

METAL COPING AT (E) PARAPET

SCALE� 3 -0" 1 -0"

NOTES�

1. (N) 22 GA. GALV. S.M. COPING REGLETS TO

BE PAINTED. COLORS TO MATCH EXISTING.

3. SOLDER ALL -OINTS.

OVERFLOW SCUPPER AT LOWER ROOF

SCALE� 3" 1 -0"

SLOPE DN

1/2"�1 -0"

(N) HEAT WELDED LAPS

PER MANUFACTURER

REQUIREMENTS

(N) PVC ROOFING

ASSEMBLY, SEE DETAIL

A900

(N) HEXAGON HEAD,

SLOTTED DRIVE, SELF-TAPPING

CONCRETE SCREW

W/ 1-1/2" MIN EMBED.,

@ 24" O.C., TYP.

(N) BACKER ROD AIR SEAL

ON ALL FOUR FLANGES

(N) ADHESIVE COLD APPLIED MEMBRANE

(N) 22 GA GALV. S.M. COPING CAP, SEE DETAIL

A902

(E) PRECAST CONCRETE

WALL TO REMAIN

(E) CONCRETE PLANK

18 -6"

T.O. (E) PRECAST

CONCRETE WALL

8"

(E) CONC.

TOPPING SLAB

/4

(N) PVC COATED 22 GA.

OVERFLOW SCUPPER.

CROSS OVER BRIDGE

SCALE� 1" 1 -0"

A900

(N) PVC ROOFING ASSEMBLY, SEE DETAIL

M

IN

M

A X

(N) FLASHING

(N) STEEL PLATE, SSD

PIPE SIZE, DUTY, MOUNTING HEIGHTS

AND SUPPORTS PER PLAN, SMD AND SED.

1 -8" MIN

18-GA, 12" X 2.5" GALVANIZED STEEL SKID RESISTANT

SURFACE STAIR LANDING, BAR GRATING TYPE WB-4, W/ 1"

HEIGHT BAR GRATING.

V A

R

IE

S V

IF

(E) STRUCTURAL METAL ROOF DECK WITH CONCRETE FILL

A902

1 1/4" DIA. SCHEDULE 40 GALVANIZED STEEL PIPE RAIL.

TUBULAR STEEL PIPE SUPPORT, TYP, SSD

M A

X

WELDED TO POST, TYP, SSD

M

IN

1 -0"

1 -0" 1 -8" 1 -0"

-0

C

L E

A R

1 1/4" DIA. SCHEDULE 40

GALVANIZED STEEL PIPE OR

APPROVED EQUAL HANDRAIL

18-GA, 12" X 2.5" GALVANIZED STEEL

SKID RESISTANT SURFACE STAIR

LANDING, BAR GRATING TYPE WB-4,

W/ 1" HEIGHT BAR GRATING.

18-GA, 12" X 2.5" GALVANIZED

STEEL SKID RESISTANT

SURFACE STAIR TREAD, W/ 1"

HEIGHT GRIP STRUT GRATING.

TUBULAR STEEL PIPE

SUPPORT, TYP, SSD

PLAN

S501

S501

S501

1 1/2" DIA. SCHEDULE 40 GALVANIZED STEEL PIPE POST.

S501

M A

X

LADDER EXTENSION DETAIL

SCALE� 3" 1 -0"

(N) PVC

ROOFING

ASSEMBLY,

SEE DETAIL

(E) FIXED ACCESS

LADDER TO REMAIN.

EXTEND AS REQUIRED.

(E) METAL DECK W/

CONCRETE FILL

ROOF HATCH

(N) LADDER EXTENSION

TO MATCH EXISTING

2" MIN

5/16

12 -0" ELEVATION MARK

GRIND SMOOTH ALL

CORNERS AND EDGES

AND ALL WELDS

(N) LADDER RUNG TO

MATCH EXISTING

M

A X

(E) LADDER RUNG

TERMINATION STRIP

SCALE� 3" 1 -0"

(N) CONTINUOUS BEAD OF AP OR HIGH GRADE SEALANT

(N) MULTI-PURPOSE PVC TAPE

(N) REGLET FASTENED AT 8" O.C. W/ GROMETTED

FASTENERS

(N) PVC FLASHING,

ADHERED TO (E) PARAPET.

HEAT WELD TO

ROOFING MEMBRANE.

(N) PVC ROOFING

ASSEMBLY,

SEE DETAIL 4

A900

M

IN

8" MIN.

(N) REGLET FASTENED

AT 8" O.C.W/ GROMETTED

FASTENERS

M

IN

(E) PRECAST CONCRETE WALL PVC FLASHING STRIP,

HOT-AIR WELDED IN PLACE

4"

COPING CAP TERMINATION ISOMETRIC

SCALE� NTS

METAL COPING CAP

END CAP

(E) PRECAST WALL,

WITHOUT COPING CAP,

WHERE OCCUR.

4"

TERMINATION

STRIP

APPROVED

SEALANT (TOOLED)

A902

D E

T A

IL

S

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R

N

IA

D E

P A

R

TM

E N

T O

F C

O R

R E

C

TI

O N

S A

N D

R E

H A

B

IL

IT

A

TI

O

N

FA

C

IL

IT

Y

P

LA

N N

IN

G

, C O

N S

TR

U

C

TI

O N

A N

D M

A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A

L

IF

O R

N

IA

S T

A T

E P

R

IS

O N

L

O S

A N

G E

L E

S C

O U

N T

Y

T

H S

T R

E E

T , W

E S

T

LA

N C

A S

T E

R , C

A

R E

P L

A C

E R

O O

F S

P H

A S

E

A U

G U

S T

F

IN

A L

D R

A W

IN

G

S

.1

V1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317

File details come from the government source that posted it. Updated .