21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf

PDF 738 KB Posted

Attached to
FPCM-LAC-I001104-M035-RS
Solicitation number
0000036277
Issued by
Los Angeles County, California

About this file

This document is a set of demolition and roof replacement plans for Facility A 270 Housing Unit Building 334 at California State Prison, Los Angeles County (LAC), prepared by the State of California Department of Corrections and Rehabilitation's Facility Planning, Construction and Management Division. The project involves comprehensive roof demolition and replacement for a housing unit building located at 44750 60th Street in Lancaster, California, with detailed plans showing complete removal of existing roofing systems, mechanical units, walkpads, electrical conduits, and associated infrastructure. The drawings are dated August 31, 2023, with final approval from the Office of the State Fire Marshal received on 10/10/23, and include specific demolition keynotes and equipment legends detailing precise removal and potential reinstallation procedures.

The project scope includes systematic deconstruction of existing roof elements while preserving critical infrastructure, with specific instructions for handling mechanical units, electrical systems, and structural components. Contractors are required to remove construction debris in compliance with local, state, and federal regulations, protect existing building elements, and coordinate closely with facility maintenance. The demolition plan emphasizes careful dismantling and potential reuse of existing equipment, with particular attention to safety, utility protection, and preparing the site for new roofing installation. The drawings provide granular details about slope management, equipment removal, and restoration procedures, indicating a methodical approach to facility infrastructure renewal.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D01

TYP

12'-0" 13'-0" 13'-0" 13'-0" 13'-0"13'-0" 13'-0"13'-0" 5'-8" 13'-0"11'-2"

DN

3 1 1.8 2 6 4 5 7 8 9 1110

B.4

A

B

D

C

J

E

F

G

H

K

K.8

L

M

1 11 1.8 2 3 4 5 6 7 8 9 10 5.7 7.3

A

B

B.7

D

E.7

G.3

J

K.7

L

M

134'-2"

1'-4"

2'-2"

(E

S L O

P E

/4

(E) SLOPE

1/4" : 1'-0"

(E

S L O

P E

/4

(E

S L O

P E

/4

(E

S L O

P E

/4

(E

S L O

P E

/4

(E

S L O

P E

/4

RIDGE

D01

TYP

D01

TYP

D01

TYP

D02

TYP

D01

D15

D14

D20

D01

TYP

D18

D02

TYP

D03

D09

D14

D11

TYP

D19

D04

D07

TYP

D13

TYP

D15

D22

D05

D07

TYP

D05

TYP

D05

D05

D23

D10

TYP

D10

TYP

D11

TYP

D06

TYP

D06

TYP

D21

D14

D13

TYP

D13

TYP

D14

D16

D12

TYP

D12

TYP

D08

TYP

D08

TYP

D08

TYP

D24

TYP

D25

D24

TYP

D27

TYP

D27

TYP

D17

D28

118 9 10

G.3

J

K.7

L

M

S

LO

P E

SLO

PE

7.3

D26

D26

D15

D29

D02

D30

FACILITY A 270 HOUSING UNIT BUILDING 334 - ROOF PLAN DEMOLITION

SCALE: 1/8" = 1'-0"

DEMOLITION KEYNOTES

(E) PARAPET COPING CAP TO BE REMOVED AND RECYCLED. INSPECT FOR WATER

DAMAGE.

REMOVE (E) MECHANICAL UNIT AND CURB. STORE AND PROTECT FOR

REINSTALLATION. SMD.

D01

D02

D04

D05

D06

D07

D08

D09

D10

D11

(E) ROOF VENT PIPE TO REMAIN. REMOVE (E) FLASHING. EXTEND TO 12" AFR

WHERE NECESSARY.

DEMOLISH (E) WALK PADS, TYP.

D12

(E) SCUPPER AT LOWER ROOF TO REMAIN.

D13

REMOVE AND PROTECT (E) EXHAUST FAN FOR REINSTALLATION, SMD.

(E) GUARD TOWER TO REMAIN. REMOVE PORTIONS OF SURROUNDING CATWALK

REQUIRED TO DEMO/INSTALL (N) ROOFING BELOW.

REMOVE (E) CRICKET.

(E) SCUPPER TO REMAIN.

D14 (E) GUARDRAIL TO BE REMOVED.

D15

D16 (E) MECHANICAL UNIT BIRD PROTECTION TO BE REMOVED AND REINSTALLED.

SHEET NUMBER

S T

A T

E O

F C

A

LI

F O

R N

IA

D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S A

N D

R E

H A

B

IL

IT

A

T

IO

N F

A C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S T

R U

C T

IO

N

A N

D M

A N

A G

E M

E N

T D

IV

IS

IO

N

D

ES

IG

N

S

ER

VI

C

ES

A

N D

S

TA

N D

AR

D

S

BR

AN

C

H D

ES

IG

N S

ER

VI

C

ES

S

EC

TI

O

N

APPROVAL

L A C

V1

C A

L

IF

O R

N

IA

S T

A T

E P

R

IS

O N

L O

S A

N G

E L E

S C

O U

N T

Y

T

H S

T R

E E

T

W E

S T

LA

N

C A

S T

E R

C

A

R E

P L

A C

E R

O O

F S

P H

A S

E

A U

G U

S T

F

IN

A L

D R

A W

IN

G

S

.1

AB201

F A

C

IL

IT

Y

A

H

O U

S

IN

G U

N

IT

B U

IL

D

IN

G

R O

O F

P L

A N

D E

M O

L

IT

IO

N

GENERAL NOTES

1. ALL CONSTRUCTION DEBRIS GENERATED IN THE COURSE OF THIS PROJECT SHALL

BE REMOVED AND DISPOSED OF IN COMPLIANCE WITH ALL LOCAL, STATE AND

FEDERAL CODES AND REGULATIONS.

2. REPAIR/REPLACE ANY DAMAGED UTILITIES DURING THE COURSE OF WORK.

3. PROTECT BUILDING FROM DAMAGE WHICH MAY OCCUR FROM DEMOLITION, DUST,

WATER, ADVERSE WEATHER, ETC.

4. CONTRACTOR TO PATCH AND REPAIR ALL AREAS DAMAGED BY, OR INCIDENTAL TO

DEMOLITION AND/OR NEW WORK TO MATCH ADJACENT FINISHES UNLESS

OTHERWISE NOTED.

5. REPLACE ALL (E) CONDUIT & PIPE SUPPORTS ON ROOF W/ (N) HARD PIPE SUPPORT

BLOCK. SED & SMD.

6. REMOVE (E) CONDUIT OR PIPE IN CONFLICT WITH THE INSTALLATION OF (N) WORK.

REINSTALL AFTER COMPLETION OF (N) WORK.

7. REMOVE ALL (E) MECHANICAL UNITS, VENTS, AND FANS AS REQUIRED TO PERFORM

ROOFING AND FLASHING WORK. STORE AND PROTECT UNITS FOR REINSTALL TO

WORKING ORDER. SCHEDULE MEETING WITH HEAD OF MAINTENANCE AND

CONTRACTOR TO VERIFY WORKING ORDER OF HVAC SYSTEM PRIOR TO WORK AND

ONCE WORK IS COMPLETE.

8. PROTECT ELECTRICAL BOXES.

9. ALL INFORMATION SHOWN ON THE DRAWING RELATIVE TO (E) CONDITIONS IS GIVEN

AS THE BEST PRESENT KNOWLEDGE . WHERE ACTUAL CONDITIONS CONFLICT WITH

THE DRAWING, THEY SHALL BE REPORTED TO THE ARCHITECT SO THAT THE

CORRECTIONS/CLARIFICATIONS CAN BE PROVIDED.

10. ALL DIMENSIONS ARE TO BE VERIFIED IN FIELD.

11. COORDINATE WITH PLANT OPS BEFORE AND AFTER SHUTTING OFF ANY UTILITIES.

12. ANY GAS LINES THAT HAVE BEEN DISCONNECTED AND RECONNECTED, SHALL BE

INSPECTED AND TESTED FOR LEAKAGE IN ACCORDANCE WITH CPC 1213, CMC 1303

AND NFPA 54.

13.PAINT ALL (N) TRIMS AND FLASHING TO MATCH (E) COLOR.

14.ALL FIRE RETARDANT TREATED WOOD SHALL BE INSPECTED PRIOR TO COVERING.

MATERIAL SHALL BEAR A LABEL THAT INDICATES ITS LISTING.

EQUIPMENT LEGEND

* NOTE: QUANTITY IS APPROXIMATE, VIF

(E) VENT PIPES TO RECEIVE BOOT FLASHING

SEE DETAIL

(E) EXHAUST FAN OVER (N) CURB ADAPTER,

SEE DETAIL

QTY.SYMBOL DESCRIPTION

DEMOLITION LEGEND

AREA OF (E) BUILT-UP ROOFING SYSTEM TO BE REMOVED,

INCLUDING RIGID INSULATION, COUNTER FLASHING,

FLASHING AROUND PENETRATIONS, ETC. (E) METAL DECK

WITH LIGHT WEIGHT CONCRETE TOPPING TO BE PATCHED

AND REPAIRED AS REQUIRED TO PREPARE STRUCTURE

FOR NEW ROOF SYSTEM.

(E) FUEL GAS PIPING, SMD.

(E) WALKPAD TO BE REMOVED

(E) BUILDING FOOTPRINT BELOW.

32 PER ROOF

32 PER ROOF

(E) CONDENSATE LINE, SMD.

(E) ELECTRICAL CONDUIT, SED.

(E) CAT WALK

D03 (E) STAIRCASE TO REMAIN.

REMOVE AND REINSTALL (E) STAIR CAGE

D17 REMOVE PORTIONS OF (E) CATWALK REQUIRED TO DEMO/INSTALL (N)

ROOFING BELOW. BIRDCAGE STRUCTURE IN PLACE.

D18 (E) CATWALK TO BE REMOVED AND REINSTALLED.

D19 (E) METAL STAIR TO BE REMOVED AND REINSTALLED.

D20 (E) CURB TO REMAIN, EXTEND AS REQUIRED.

D21 (E) ROOF HATCH TO BE REMOVED.

D22 (E) MECHANICAL UNIT AND PLATFORM TO REMAIN AND PROTECT.

REMOVE (E) WATER HEATER ON CURB. STORE AND PROTECT FOR

REINSTALLATION. SMD.

D23

D24 (E) AHU DUCT SUPPORT AND BRACE TO BE REMOVED AND REPLACED, SMD

D25 (E) PITCH POCKET TO BE REMOVED AND REPLACED, SMD

(E) ROOF DRAIN AND OVERFLOW DRAIN COVER TO BE REMOVED AND

RE-INSTALL AND OR REPLACED.

D26

PARTIAL SECOND LEVEL AND ROOF PLAN DEMOLITION

SCALE: 1/8" = 1'-0"

FACILITY A 270 HOUSING UNIT BUILDING 334

(E) SCUPPER AND PARAPET AT HIGHER ROOF TO BE REMOVED.D27

(E) ELECTRICAL CONDUIT TO BE REMOVED AND RE-INSTALLED, SED.

(E) ROOF MOUNTED CONDENSATE PIPE ON SUPPORT BLOCK TO BE REMOVED

AND REPLACED. SMD.

REMOVE AND PROTECT (E) TRANSITION LADDER

N N

REMOVE (E) GRAB BARD28

REMOVE (E) ABANDONED MECHANICAL CURB.D29

DEMO CONCRETE PADD30

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp 491 #1317

File details come from the government source that posted it. Updated .