This document is a detailed architectural drawing set for a roof replacement project by the California Department of Corrections and Rehabilitation (CDCR) at the California State Prison, Los Angeles County (LAC) located in Lancaster, California. The project, labeled as "Replace Roofs - Phase 1", involves comprehensive roof renovation work including multiple detailed technical specifications for roof transitions, guardrails, roof hatch safety rail guards, plumbing access doors, and catwalk modifications. The drawings are dated August 31, 2023, with final approval from the Office of the State Fire Marshal received on 10/10/23 and 11/20/2023.

The architectural drawings provide precise technical specifications for roof system upgrades, including PVC roofing assemblies, metal flashing, concrete wall interactions, guardrail installations, and safety infrastructure modifications. The project appears to be focused on upgrading and standardizing roof systems and safety features at the correctional facility, with detailed engineering drawings showing precise measurements, material specifications, and installation techniques for various roof and structural elements. The drawings indicate a comprehensive approach to roof replacement that considers existing structural conditions, safety requirements, and technical integration of new roofing systems with existing facility infrastructure.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HIGH - LOW ROOF TRANSITION

SCALE: 3" = 1'-0"

SLOPE DN

1/4":1'-0"

(N) PVC ROOFING

ASSEMBLY, SEE DETAIL

(N) METAL NAILER

A900

(N) 3/8" x 1 7/8" SS CONC. SCREW @ 12" CC TYP.

(E) CAST IN PLACE CONCRETE WALL

(E) PRECAST CONC. ROOF PLANK

SLOPE DN

1/2":1'-0"

8"

(N) TERMINATION BAR & FASTENER BY

ROOFING MFR.

(N) PVC FLASHING

(E) ROOF DECKING

M

IN

22 GA. GALV. S.M. FLASHING

FASTEN APPROX. 3" TO 6" O.C.

STAGGERED WITH CORROSION-RESISTANT, BARBED, ANNULAR RING OR

SCREW . LENGTH TO ACHIEVE APPROX. 1 1/4" PENETRATION INTO NAILER.

1"

1 1/2" MIN.

WELD

(CONT.)

1 1/2" MIN.

WELD

(CONT.)

SINGLE PLY LVOC CAULK, OPTIONAL

(N) PVC DETAIL

STRIP

(N) PVC ROOFING

ASSEMBLY,

SEE DETAIL

A900

3" MIN.

FLANGE

METAL CLEAT W/ FASTENERS AT APPROX. 6"

O.C. W/ CORROSION-RESISTANT, BARBED,

ANNULAR RING OR SCREW . LENGTH TO

ACHIEVE APPROX. 1 1/4" PENETRATION INTO

NAILER.

(E) CONC. ROOF FILL

(N) RIGID INSULATION

2" MIN.

TRACK 4 x 2 x 16GA W/

#10 @ 12" CC EA SIDE

(N) L6x2 1/2x16GA

GUARDRAIL-OUTSIDE PARAPET WALL MOUNTED

SCALE: 1/2" = 1'-0"

1 1/2" Ø (SCH. 40)

GALVANIZED METAL

GUARDRAIL

5'-0"

MAX. SPACING

C L

R

M A

X

TOP OF PARAPET

WALL

ROOF FINISH

SURFACE

E Q

E

Q

ATTACHMENT, SEE

SECTION A

M

IN

GALVANIZED

HSS, SSD

(N) EXPANSION

ANCHORS, SSD

GALVANIZED

HSS 2X2X3/16",

TYP.

12"

PRECAST CONC.

WALL

ROOF

FINISH

SURFACE

SECTION - A

A

M

IN

M

IN

21'-6"

TOP OF (E) PARAPET

TOP OF (E) DECK

22'-2"

TOP OF (N) METAL BOX

1 1/2" Ø (SCH. 40)

GALVANIZED METAL

GUARDRAIL

(N) PARAPET

EXTENSION.

TYP.

1/4

TYP.

1/4

1/8 6

S501

S501

HINGE SIDE

ALUMINUM SINGLE POST

CORNER BRACKET

ALUMINUM

SINGLE POST

CORNER BRACKET

ALUMINUM SINGLE POST

CORNER BRACKET

ALUMINUM

SINGLE POST

CORNER BRACKET

CAST ALUMINUM GATE

LATCH W/ STAINLESS

STEEL PIN

STAINLESS STEEL

SPRING HINGES

42"

ABOVE THE

ROOF SURFACE

OR DECK ALUMINUM POST

SUPPORTS

1 1/4" SCHEDULE 40 PIPE

IN 6061 T6 ALUMINUM ALLOY

SELF CLOSING GATE

ROOF HATCH SAFETY RAIL GUARD

SCALE: 3/4" = 1'-0"

1 1/4" SCHEDULE 40 PIPE

IN 6061 T6 ALUMINUM ALLOY

RAILS

PLAN

ELEVATIONELEVATION

ROOF HATCH

38"

MATCH AND VERIFY (E)

M

A T

C H

A N

D V

E R

IF

Y

E

A902

PLUMBING ACCESS DOOR (in development)

SCALE: 1 1/2" = 1'-0"

PLUMBING

ACCESS DOOR

SILL FINISH

10 GA. 1 HOUR FIRE RATED

METAL ACCESS DOOR

HINGES, TOP AND BOTTOM, TYP.

2'-0"

2"x2"x3/16" ANGLE

STEEL FRAME

ELEVATION

SECTION - 1

DETENTION LOCK AND

PARACENTRIC KEY

PLAN

WALL OPENING

BUTT HINGE, TOP AND BOTTOM ANCHOR STRAP, 2 EACH SIDE

DETENTION LOCK AND

PARACENTRIC KEY

(N) PVC ROOFING

ASSEMBLY, SEE

DETAIL

A900

(E) CONCRETE WALL

(E) CONC. SLAB

(N) PVC FLASHING

(E) ROOF

DECKING

22 GA. GALV.

S.M. FLASHING

(N) PVC ROOFING

ASSEMBLY, SEE

DETAIL

A900 4

2'

1-1/2" = 1'-0"

SLOPE DN

1/2":1'-0"

(N) PVC ROOFING

ASSEMBLY, SEE DETAIL

A900

(E) PRECAST CONCRETE

WALL TO REMAIN

(E) CONCRETE PLANK W/

CONCRETE TOPPING

18'-6"

T.O. (E) PRECAST

CONCRETE WALL (N) TOP OF CRICKET

BEYOND

SECTION - 1

SLOPE DN

1/4":1'-0"

(N) PVC ROOFING

ASSEMBLY, SEE

DETAIL

A900

(E) CAST IN PLACE

CONCRETE WALL

T.O.(E) CONC. DECK

AT LOWER ROOF

(N) PVC FLASHING

(E) METAL ROOF DECK

22 GA. GALV.

S.M. FLASHING

(E)GUN POST

1 1/2" Ø (SCH. 40)

GALVANIZED PIPE

GUARDRAIL

(N) GALV. STEEL GRATING

ON STRUCTURAL STEEL

CATWALK WITH GUARDRAIL-MATCH EXISTING AT AD SEG

SCALE: 1-1/2" = 1'-0"

(E) CATWALK

(E) STRUCTURAL STEEL FRAME

(E) STRUCTURAL STEEL FRAME 1

M

IN

(N) TERMINATION

STRIP,

SEE DETAIL

A902

#10 SMS @ 10" OC

22 GA GSM COUNTER FLASHING

CONT. CAULKING, TYP

(E) GSM CAP FLASHING

1.8

/8

(N) CONT.

CAULKING,

TYP.

(N) PVC

FLASHING

TO WRAP

OVER

(E) WALL

ROOF RAKE

SCALE: 3'-0" = 1'-0"

CONT. GALV.

METAL CLEAT,

24 GA MIN

(E) ROOF DECKING

(N) PVC ROOFING

ASSEMBLY,

SEE DETAIL

(E) CAST IN PLACE CONC. WALL

(N) PVC FLASHING

STRIP, HOT AIR WELD.

(N) GSM. EDGE

A901

D E T A

IL

S

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R

N

IA

D E

P A

R

TM

E N

T O

F C

O R

R E

C

TI

O N

S A

N D

R E

H A

B

IL

IT

A

TI

O

N

FA

C

IL

IT

Y

P

LA

N N

IN

G

, C O

N S

TR

U

C

TI

O N

A N

D M

A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A

L

IF

O R

N

IA

S T

A T

E P

R

IS

O N

L

O S

A N

G E

L E

S C

O U

N T

Y

T

H S

T R

E E

T , W

E S

T

LA

N C

A S

T E

R , C

A

R E

P L

A C

E R

O O

F S

P H

A S

E

A U

G U

S T

F

IN

A L

D R

A W

IN

G

S

.1

V1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317

File details come from the government source that posted it. Updated .