This document is a detailed roof remodeling plan for the California State Prison, Los Angeles County (LAC), prepared by the California Department of Corrections and Rehabilitation's Facility Planning, Construction and Management Division. The project involves replacing roofs for multiple housing units (Buildings 331-345 and 348-3410) in Phase 1 of a roof replacement initiative. The plan, dated August 31, 2023, with final drawings approved on 10/10/23 by the Office of the State Fire Marshal, includes comprehensive technical specifications for a complete roof system renovation, including installing 80 mil fully-adhered PVC roofing, new metal coping, parapet extensions, walkpads, and reinstallation of existing mechanical equipment.

The project site is located at 44750 60th Street, West, Lancaster, CA 93536, and involves extensive roof infrastructure upgrades across multiple prison housing units. Key technical details include installing new Class A UL 790 rated roofing systems with protection board and rigid insulation, replacing roof penetrations, reinstalling existing mechanical units on new raised curbs, adding guardrails, roof hatches, and walkpads, and extending parapets. The drawings include specific notes about debris removal, utility protection, coordination with plant operations, and compliance with local, state, and federal codes. The plan has received accessibility certification (CASp 491 #1317) and fire safety approval, indicating comprehensive regulatory compliance for this state corrections facility infrastructure project.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12'-0" 13'-0" 13'-0" 13'-0" 13'-0"13'-0"13'-0"13'-0"5'-8" 13'-0"11'-2"

DN

1 61.8 2 3 4 5 7 118 9 10

A

B

C

B.4

F

D

E

H

G

J

K

K.8

L

M

1 111.8 2 3 4 5 6 7 8 9 10 5.7 7.3

A

B

B.7

D

E.7

G.3

J

K.7

L

M

134'-2"

1'-4"

2'-2"

S L O

P E

/2

(E

S L O

P E

/4

(E

S L O

P E

/4

(E

S L O

P E

/4

K

H

E

C

F

G

( E

S L O

P E

/4

RIDGE

SLOPE

1/2":1'-0"

S L O

P E

/2

26'-0"

REMODEL KEYNOTES

(N) METAL COPING AT (E) PARAPET, SEE DETAIL

A902

(N) 36" WIDE WALK PAD, 72" WIDE AROUND MECHANICAL EQUIPMENTS06

A900

(E) EXHAUST FAN, REINSTALLED OVER NEW RAISED CURB, SMD.

(N) BOOT FLASHING AT (E) VENT PIPE

(N) CONDENSATE PIPE ON (N) SUPPORT BLOCK, SMD.

(N) CRICKET

(N) OVERFLOW SCUPPER

A900

A902

A902

12 (N) BOOT FLASHING AT (E) ELECTRICAL CONDUIT PIPE, SED

(RE) ELECTRICAL CONDUIT ON NEW SUPPORT BLOCK, SEE DETAIL14

(N) PRIMARY SCUPPER AT LOWER ROOF

A900

A900

GENERAL NOTES

1. ALL CONSTRUCTION DEBRIS GENERATED IN THE COURSE OF THIS PROJECT SHALL

BE REMOVED AND DISPOSED OF IN COMPLIANCE WITH ALL LOCAL, STATE AND

FEDERAL CODES AND REGULATIONS.

2. REPAIR/REPLACE ANY DAMAGED UTILITIES DURING THE COURSE OF WORK.

3. PROTECT BUILDING FROM DAMAGE WHICH MAY OCCUR FROM DEMOLITION, DUST,

WATER, ADVERSE WEATHER, ETC.

4. CONTRACTOR TO PATCH AND REPAIR ALL AREAS DAMAGED BY, OR INCIDENTAL TO

DEMOLITION AND/OR NEW WORK TO MATCH ADJACENT FINISHES UNLESS

OTHERWISE NOTED.

5. REPLACE ALL (E) CONDUIT & PIPE SUPPORTS ON ROOF W/ (N) HARD PIPE SUPPORT

BLOCK. SED & SMD.

6. REMOVE (E) CONDUIT OR PIPE IN CONFLICT WITH THE INSTALLATION OF (N) WORK.

REINSTALL AFTER COMPLETION OF (N) WORK.

7. REMOVE ALL (E) MECHANICAL UNITS, VENTS, AND FANS AS REQUIRED TO PERFORM

ROOFING AND FLASHING WORK. STORE AND PROTECT UNITS FOR REINSTALL TO

WORKING ORDER. SCHEDULE MEETING WITH HEAD OF MAINTENANCE AND

CONTRACTOR TO VERIFY WORKING ORDER OF HVAC SYSTEM PRIOR TO WORK AND

ONCE WORK IS COMPLETE.

8. PROTECT ELECTRICAL BOXES.

9. ALL INFORMATION SHOWN ON THE DRAWING RELATIVE TO (E) CONDITIONS IS GIVEN

AS THE BEST PRESENT KNOWLEDGE . WHERE ACTUAL CONDITIONS CONFLICT WITH

THE DRAWING, THEY SHALL BE REPORTED TO THE ARCHITECT SO THAT THE

CORRECTIONS/CLARIFICATIONS CAN BE PROVIDED.

10. ALL DIMENSIONS ARE TO BE VERIFIED IN FIELD.

11. COORDINATE WITH PLANT OPS BEFORE AND AFTER SHUTTING OFF ANY UTILITIES.

12. ANY GAS LINES THAT HAVE BEEN DISCONNECTED AND RECONNECTED, SHALL BE

INSPECTED AND TESTED FOR LEAKAGE IN ACCORDANCE WITH CPC 1213, CMC 1303

AND NFPA 54.

13.PAINT ALL (N) TRIMS AND FLASHING TO MATCH (E) COLOR.

14.ALL FIRE RETARDANT TREATED WOOD SHALL BE INSPECTED PRIOR TO COVERING.

MATERIAL SHALL BEAR A LABEL THAT INDICATES ITS LISTING.

EQUIPMENT LEGEND

* NOTE: QUANTITY IS APPROXIMATE, VIF

(E) VENT PIPES TO RECEIVE BOOT FLASHING

SEE DETAIL

(E) EXHAUST FAN OVER (N) CURB ADAPTER,

SEE DETAIL

QTY.SYMBOL DESCRIPTION

32 PER ROOF

32 PER ROOF

TYP

TYP

(N) 38"x42" ROOF HATCH WITH RAIL GUARD, SEE DETAILS

(RE) TRANSITION LADDER, SEE DETAIL

(N) GUARDRAIL, SEE DETAIL

A902

A904

A901

TYP

TYP

TYP

REMODEL LEGEND

(N) 80 MIL, FULLY-ADHERED (CLASS A, UL 790) PVC

ROOFING SYSTEM OVER 1/2" PROTECTION BOARD

OVER 6" MIN RIGID INSULATION. PROVIDE NEW

FLASHING FOR ALL (E) ROOF PENETRATIONS.

COORDINATE RE-ROOFING WITH (E) UTILITIES AND

ELECTRICAL CONDUITS.

(N) PVC WALKPAD COMPATIBLE W/ (N) MEMBRANE.

SURFACE MUST BE 36" MIN. WIDE, AND INCREASED TO 72"

MIN. WIDE WHERE INDICATED AT MECHANICAL

EQUIPMENT.

(E) BUILDING FOOTPRINT BELOW.

(N) CMU PARAPET EXTENSION.

(E) FUEL GAS PIPING, SMD.

(E) CONDENSATE LINE, SMD.

(E) ELECTRICAL CONDUIT, SED.

(N) METAL STUD PARAPET EXTENSION.

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

05 05

TYP

TYP

TYP

TYP

TYP

(N) EDGE TRANSITION CONDITION AT HIGH ROOF

(E)STAIR CAGE TO BE REINSTALLED.

EXTENDED CURB.

A901

05 (E) MECHANICAL UNIT RE-INSTALLED OVER (N) RAISED CURB. SMD.

TYP

21 (N) PLUMBING ACCESS DOOR, SEE DETAIL

A901

22 (E) MECHANICAL DUCT TO BE RE-INSTALLED. SMD.

AA501

AA601

AA601

TYP

TYP

TYP

TYP

TYP

TYP

REINSTALL (E) WATER HEATER ON CURB, SMD.23

24 AHU DUCT SUPPORT AND BRACE, SMD

25 PITCH POCKET, SMD

TYP

TYP

TYP

AA501

AA501

AA501

A903

(N) CROSS OVER BRIDGE, SEE DETAIL

A902

TYP

TYP

REINSTALL (E) METAL GRATING

A900 SIM.

(N) PARAPET EXTENSION. SSD &

A900

A901

(V

IF

26 (E) PRIMARY SCUPPER TO REMAIN.

A905

A903

T Y P

6'-0"

TYP

3' -0

TY

P

TYP

TYP

TYP

TYP

TYP

TYP

A900

27 TRANSITION STRIP AT PARAPET WALL. SEE DETAIL

A905

28 ROOF RAKE. SEE DETAIL

A901

8'-8"

±5'-6"

±5'-1"

±5'-1" ±5

'-4

6'-0"

TYP

T Y P

A902

TYPICAL 270 HOUSING UNIT ROOF PLAN REMODEL

SCALE: 1/8" = 1'-0"

SHEET NUMBER

S T

A T

E O

F C

A

LI

F O

R N

IA

D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S A

N D

R E

H A

B

IL

IT

A

T

IO

N F

A C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S T

R U

C T

IO

N

A N

D M

A N

A G

E M

E N

T D

IV

IS

IO

N

D

ES

IG

N

S

ER

VI

C

ES

A

N D

S

TA

N D

AR

D

S

BR

AN

C

H D

ES

IG

N S

ER

VI

C

ES

S

EC

TI

O

N

APPROVAL

L A C

V1

C A

L

IF

O R

N

IA

S T

A T

E P

R

IS

O N

L O

S A

N G

E L E

S C

O U

N T

Y

0T H

S T

R E

E T

W

E S

T

LA

N C

A S

T E

R

C A

R E

P L

A C

E R

O O

F S

P H

A S

E

A U

G U

S T

F

IN

A L

D R

A W

IN

G

S

.1

AA301

T Y

P

IC

A L

H

O U

S

IN

G U

N

IT

R O

O F

P L

A N

R E

M O

D E

L

BUILDING 332 BUILDING 331

N

N N

BUILDING 333 BUILDING 335

N

BUILDING 336 BUILDING 337 BUILDING 338 BUILDING 339 BUILDING 3310 BUILDING 341 BUILDING 342 BUILDING 343 BUILDING 344

N

N N N

N

N

BUILDING 345

N N

N

N

BUILDING 348 BUILDING 349 BUILDING 3410

N N

N

V1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp 491 #1317

./5080-CCC Chapel Admin-A3.0.dwg ./5080-CCC Chapel Admin-A3.0.dwg ./5080-CCC Chapel Admin-A3.0.dwg ./5080-CCC Chapel Admin-A3.0.dwg ./5080-CCC Chapel Admin-A3.0.dwg ./5080-CCC Chapel Admin-A3.0.dwg

File details come from the government source that posted it. Updated .