About this file
This document is a Structural Special Inspections and Testing specification sheet for the California Department of Corrections and Rehabilitation (CDCR) project located at California State Prison, Los Angeles County in Lancaster, CA. The document details comprehensive requirements for special inspections and testing during construction, specifically for Phase 1 of a roof replacement project. The specifications cover multiple construction types including concrete construction, post-installed anchors, masonry construction at different levels, and provide detailed guidelines for inspection frequencies, tasks, and reporting requirements.
The document outlines precise inspection protocols that must be followed by a testing and inspection agency employed by the owner and approved by the building official. Key requirements include continuous and periodic special inspections for various structural elements, verification of material properties, placement techniques, and compliance with building codes such as the California Building Code (CBC). The specifications mandate that all special inspection records be retained on-site, inspection reports be submitted to relevant parties, and any discrepancies be immediately addressed. The project tracking number is 21-040, with the design services provided by Hibser Yamauchi Architects, and the document was approved by the Office of the State Fire Marshal on 10/10/23 with a final drawing date of August 31, 2023.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS AND TESTING
110SN001
1. SPECIAL INSPECTIONS AND TESTING SHALL BE PROVIDED BY A TESTING AND INSPECTION
AGENCY, EMPLOYED BY THE OWNER (OR OWNER'S AUTHORIZED AGENT), AND APPROVED BY
THE BUILDING OFFICIAL TO PROVIDE SPECIAL INSPECTIONS AND TESTINGFOR THE
PARTICULAR TYPE OF CONSTRUCTION.
2. TABLES OF SPECIAL INSPECTIONS AND TESTING ARE DERIVED FROM THE STRUCTURAL
PROVISIONS OF THE CBC AND REFERENCED STANDARDS AND ARE FOR REFERENCE ONLY.
THE INCLUDED TABLES ARE PROVIDED FOR THE CONVENIENCE OF THE OWNER, TESTING
AGENCY AND CONTRACTOR IN DEVELOPING THE SCOPE OF WORK FOR REQUIRED TESTING
AND INSPECTION OF STRUCTURAL MATERIALS AND COMPONENTS. FINAL DEFINITION OF THIS
SCOPE OF WORK IS TO BE DETERMINED BY THE TESTING AGENCY AND THE OWNER (OR
OWNER'S AUTHORIZED AGENT).
3. FREQUENCY OF SPECIAL INSPECTIONS AND TESTING SHALL BE, AT A MINIMUM, AS NOTED FOR
THE INDIVIDUAL ELEMENTS WITHIN THE TABLES BELOW. THE CONTRACTOR SHALL
COORDINATE TIMING OF SPECIAL INSPECTIONS AND TESTING WITH THE SPECIAL INSPECTION
AND TESTING AGENCY.
4. PRIOR TO THE START OF CONSTRUCTION, THE TESTING AND INSPECTION AGENCY SHALL
PROVIDE DOCUMENTATION TO THE BUILDING OFFICIAL DEMONSTRATING COMPETENCE AND
RELEVANT EXPERIENCE OR TRAINING OF THE SPECIAL INSPECTORS WHO WILL PERFORM THE
SPECIAL INSPECTIONS AND TESTS DURING CONSTRUCTION, IN ACCORDANCE WITH CBC
SECTION 1704.2.1.
5. THE TESTING AND INSPECTION AGENCY SHALL SUBMIT REPORTS OF SPECIAL INSPECTIONS
AND TESTS TO THE BUILDING OFFICIAL, STRUCTURAL ENGINEER OF RECORD AND THE
CONTRACTOR, PER CBC SECTION 1704.2.4. THE REPORTS SHALL INDICATE WHETHER WORK
INSPECTED OR TESTED CONFORMED TO THE APPROVED CONSTRUCTION DOCUMENTS. ANY
DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CONTRACTOR
FOR CORRECTION. IF DISCREPANCIES ARE NOT CORRECTED, THEY SHALL BE BROUGHT TO
THE ATTENTION OF THE BUILDING OFFICIAL AND THE STRUCTURAL ENGINEER OF RECORD.
6. SPECIAL INSPECTION AND TESTING RECORDS SHALL BE RETAINED BY THE CONTRACTOR ON
SITE UNTIL COMPLETION OF CONSTRUCTION.
7. THE CONTRACTOR SHALL SUBMIT A WRITTEN STATEMENT TO THE BUILDING OFFICIAL
ACKNOWLEDGING RESPONSIBILITY FOR CONSTRUCTION OF THE MAIN LATERAL-FORCE
RESISTING SYSTEM PRIOR TO COMMENCEMENT OF THAT WORK AS REQUIRED BY CBC
SECTION 1704.4.
8. THE OWNER OR THE OWNER'S AUTHORIZED AGENT SHALL SUBMIT TO THE BUILDING OFFICIAL, A FINAL REPORT DOCUMENTING SPECIAL INSPECTIONS AND TESTS PER CBC SECTION 1704.2.4, AND REPORTS AND CERTIFICATES PER CBC SECTION 1704.5.
9. ALL SOILS AND FOUNDATION EXCAVATION INSPECTIONS SHALL BE BY THE GEOTECHNICAL
ENGINEER OF RECORD, OR A GEOTECHNICAL FIRM HIRED BY THE OWNER PER CBC SECTION
1705.6.
10. SPECIAL INSPECTION IS REQUIRED FOR ALL SHOP FABRICATED MEMBERS OR ASSEMBLIES
UNLESS WAIVED PER THE EXCEPTIONS IN CBC SECTION 1704.2.5.
11. DEFINITIONS:
a. CONTINUOUS - SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS CONTINUOUSLY
PRESENT WHEN AND WHERE THE WORK TO BE INSPECTED IS BEING PERFORMED.
b. PERIODIC - SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS INTERMITTENTLY
PRESENT WHERE THE WORK TO BE INSPECTED HAS BEEN OR IS BEING PERFORMED.
c. QUALITY ASSURANCE (QA) - MONITORING AND INSPECTION TASKS PERFORMED BY AN
AGENCY OR FIRM OTHER THAN THE FABRICATOR OR ERECTOR TO ENSURE THAT THE
MATERIAL PROVIDED AND WORK PERFORMED BY THE FABRICATOR AND ERECTOR MEET
THE REQUIREMENTS OF THE APPROVED CONSTRUCTION DOCUMENTS AND REFERENCED
STANDARDS. QUALITY ASSURANCE INCLUDES THOSE TASKS DESIGNATED 'SPECIAL
INSPECTION' BY THE APPLICABLE CODE.
d. QUALITY CONTROL (QC) - CONTROLS AND INSPECTIONS IMPLEMENTED BY THE
FABRICATOR OR ERECTOR, AS APPLICABLE, TO ENSURE THAT THE MATERIAL PROVIDED
AND WORK PERFORMED MEET THE REQUIREMENTS OF THE APPROVED CONSTRUCTION
DOCUMENTS AND REFERENCED STANDARDS.
e. OBSERVE (O) - OBSERVE THESE ITEMS ON A RANDOM BASIS (DAILY FOR LFRS).
OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS.
f. PERFORM (P) - PERFORM THOSE TASKS PRIOR TO FINAL ACCEPTANCE FOR EACH ITEM OR
ELEMENT.
g. DOCUMENT (D) - THE INSPECTOR SHALL PREPARE REPORTS INDICATING THAT THE WORK
HAS BEEN PERFORMED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE REPORT
NEED NOT PROVIDE DETAILED MEASUREMENTS FOR JOINT FIT-UP, WPS SETTINGS,
COMPLETED WELDS, OR OTHER INDIVIDUAL ITEMS LISTED IN THE TABLES. FOR SHOP
FABRICATION, THE REPORT SHALL INDICATE THE PIECE MARK OF THE PIECE INSPECTED.
FOR FIELD WORK, THE REPORT SHALL INDICATE THE REFERENCE GRID LINES AND FLOOR
OR ELEVATION INSPECTED. WORK NOT IN COMPLIANCE WITH THE CONTRACT DOCUMENTS
AND WHETHER THE NONCOMPLIANCE HAS BEEN SATISFACTORILY REPAIRED SHALL BE
NOTED IN THE INSPECTION REPORT.
12. SPECIAL INSPECTIONS AND TESTING SHALL BE PERFORMED DURING CONSTRUCTION ON THE
WORK SHOWN IN THE CONSTRUCTION DOCUMENTS AS REQUIRED BY CBC CHAPTER 17, THE
TABLES LISTED BELOW, AND THE JURISDICTION'S SPECIAL INSPECTION AND TESTING FORM.
IF DISCREPANCIES ARE NOTED, CONTACT THE SEOR. ALL EXCEPTIONS INCLUDED IN CBC
CHAPTER 17 ARE PERMITTED TO BE USED.
� CONCRETE CONSTRUCTION (POST-INSTALLED ANCHORS)
� MASONRY CONSTRUCTION - LEVEL 2
� MASONRY CONSTRUCTION - LEVEL 3
� MASONRY CONSTRUCTION - LEVEL 2 (POST-INSTALLED ANCHORS)
� MASONRY CONSTRUCTION - LEVEL 3 (POST-INSTALLED ANCHORS)
TYPE
CONCRETE CONSTRUCTION - REQUIRED SPECIAL INSPECTIONS AND TESTS
CBC TABLE 1705.3
110SN301
CONTINUOUS REFERENCED STANDARD aPERIODIC
1. INSPECT REINFORCEMENT,
INCLUDING PRESTRESSING
TENDONS, AND VERIFY PLACEMENT.
ACI 318 CH. 20, 25.2, 25.3,
26.6.1-26.6.3
- X
2. REINFORCING BAR WELDING: AWS D1.4
ACI 318: 26.6.4
A. VERIFY WELDABILITY OF
REINFORCING BARS OTHER
THAN ASTM A706
B. INSPECT SINGLE-PASS FILLET
WELDS, MAXIMUM 5/16"
C. INSPECT ALL OTHER WELDS
- X
- X
X -
3. INSPECT ANCHORS CAST IN
CONCRETE.
ACI 318: 17.8.2
4. INSPECT ANCHORS POST-INSTALLED
IN HARDENED CONCRETE
MEMBERS. b
ACI 318: 17.8.2.4, 17.8.2
A. ADHESIVE ANCHORS INSTALLED
IN HORIZONTALLY OR UPWARDLY
INCLINED ORIENTATIONS TO
RESIST SUSTAINED TENSION
LOADS.
x -
B. MECHANICAL ANCHORS AND
ADHESIVE ANCHORS NOT
DEFINED IN 4.A.
- X
5. VERIFY USE OF REQUIRED DESIGN
MIX.
ACI 318: CH. 19, 26.4.3,
26.4.4
- X
6. PRIOR TO CONCRETE PLACEMENT,
FABRICATE SPECIMENS FOR
STRENGTH TESTS, PERFORM SLUMP
AND AIR CONTENT TESTS, AND
DETERMINE THE TEMPERATURE OF
THE CONCRETE.
ASTM C172
ASTM C31
ACI 318: 26.5, 26.12
X -
7. INSPECT CONCRETE AND
SHOTCRETE PLACEMENT FOR
PROPER APPLICATION TECHNIQUES.
ACI 318: 26.5
8. VERIFY MAINTENANCE OF SPECIFIED
CURING TEMPERATURE AND
TECHNIQUES.
ACI 318: 26.5.3-26.5.5- X
9. INSPECT PRESTRESSED CONCRETE
FOR:
ACI 318: 26.10
A. APPLICATION OF PRESTRESSING
FORCES
B. GROUTING OF BONDED
PRESTRESSING TENDONS.
10. INSPECT ERECTION OF PRECAST
CONCRETE MEMBERS.
ACI 318: CH. 26.9- X
13. VERIFY IN-SITU CONCRETE
STRENGTH, PRIOR TO STRESSING
OF TENDONS IN POST-TENSIONED
CONCRETE AND PRIOR TO REMOVAL
OF SHORES AND FORMS FROM
BEAMS AND STRUCTURAL SLABS.
ACI 318: 26.11.2- X
14. INSPECT FORMWORK FOR SHAPE,
LOCATION AND DIMENSIONS OF THE
CONCRETE MEMBER BEING FORMED.
ACI 318: 26.11.1.2(b)- X
A. WHERE APPLICABLE, SEE SECTION 1705.13.
B. SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH
REPORT FOR THE ANCHOR ISSUED BY AN APPROVED SOURCE IN ACCORDANCE WITH 17.8.2
IN ACI 318, OR OTHER QUALIFICATION PROCEDURES. WHERE SPECIFIC REQUIREMENTS ARE
NOT PROVIDED, SPECIAL INSPECTION REQUIREMENTS SHALL BE SPECIFIED BY THE
REGISTERED DESIGN PROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING OFFICIAL
PRIOR TO COMMENCEMENT OF THE WORK.
- X
X -
X -
X -
11. FOR PRECAST CONCRETE
DIAPHRAGM CONNECTIONS OR
REINFORCEMENT AT JOINTS
CLASSIFIED AS MODERATE OR HIGH
DEFORMABILITY ELEMENTS (MDE OR
HDE) IN STRUCTURES ASSIGNED TO
SEISMIC DESIGN CATEGORY C, D, E
OR F, INSPECT SUCH CONNECTIONS
AND REINFORCEMENT IN THE FIELD
FOR:
ACI 318: 26.13.1.3
A. INSTALLATION OF THE
EMBEDDED PARTS.
B. COMPLETION OF THE CONTINUITY
OF REINFORCEMENT ACROSS
JOINTS.
X -
X -
X -
ACI 550.5
C. COMPLETION OF CONNECTIONS
IN THE FIELD.
12. INSPECT INSTALLATION
TOLERANCES OF PRECAST
CONCRETE DIAPHRAGM
CONNECTIONS FOR COMPLIANCE
WITH ACI 550.5.
ACI 318: 26.13.1.3- X
TYPE
CONCRETE CONSTRUCTION - POST-INSTALLED ANCHORS
REQUIRED SPECIAL INSPECTIONS AND TESTS
CBC TABLE 1705.3
110SN302
CONTINUOUS REFERENCED STANDARDPERIODIC
1. INSPECT ANCHORS POST-
INSTALLED IN HARDENED
CONCRETE MEMBERS. a,b
ACI 318: 17.8.2.4, 17.8.2
A. ADHESIVE ANCHORS INSTALLED
IN HORIZONTALLY OR UPWARDLY
INCLINED ORIENTATIONS TO
RESIST SUSTAINED TENSION
LOADS.
X -
B. MECHANICAL ANCHORS AND
ADHESIVE ANCHORS NOT
DEFINED IN 1.A.
- X
A. SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH
REPORT FOR THE ANCHOR ISSUED BY AN APPROVED SOURCE IN ACCORDANCE WITH 17.8.2 IN
ACI 318, OR OTHER QUALIFICATION PROCEDURES. WHERE SPECIFIC REQUIREMENTS ARE
NOT PROVIDED, SPECIAL INSPECTION REQUIREMENTS SHALL BE SPECIFIED BY THE
REGISTERED DESIGN PROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING OFFICIAL
PRIOR TO COMMENCEMENT OF THE WORK.
B. SEE THE POST-INSTALLED ANCHOR NOTES FOR ADDITIONAL INFO.
INSPECTION TASK
MASONRY CONSTRUCTION - LEVEL 2 REQUIRED SPECIAL INSPECTIONS AND TESTS
TMS 602 TABLE 3 AND 4
110SN402
CONTINUOUS TMS 402PERIODIC
1. AS MASONRY CONSTRUCTION
BEGINS, VERIFY THAT THE
FOLLOWING ARE IN COMPLIANCE
A. PROPORTIONS OF SITE-
PREPARED MORTAR
B. GRADE AND SIZE OF
PRESTRESSING TENDONS AND
ANCHORAGES
- X
2. PRIOR TO GROUTING, VERIFY THAT
THE FOLLOWING ARE IN
COMPLIANCE:
4. OBSERVE PREPARATION OF GROUT
SPECIMENS, MORTAR SPECIMENS,
AND/OR PRISMS
- X
A. REQUIRED FOR THE FIRST 5000 SQUARE FEET (465 SQUARE METERS) OF AAC MASONRY.
B. REQUIRED AFTER THE FIRST 5000 SQUARE FEET (465 SQUARE METERS) OF AAC MASONRY.
MINIMUM VERIFICATION REQUIREMENTS
MINIMUM SPECIAL INSPECTION
FREQUENCY REFERENCE FOR CRITERIA
TMS 602
C. GRADE, TYPE AND SIZE OF
REINFORCEMENT, CONNECTORS,
ANCHOR BOLTS, AND
PRESTRESSING TENDONS AND
ANCHORAGES
D. PRESTRESSING TECHNIQUE
E. PROPERTIES OF THIN-BED
MORTAR FOR AAC MASONRY
- X
- X
- X
X(b)
A. GROUT SPACE
B. PLACEMENT OF PRESTRESSING
TENDONS AND ANCHORAGES
C. PLACEMENT OF
REINFORCEMENT, CONNECTORS,
AND ANCHOR BOLTS
- X
- X
D. PROPORTIONS OF SITE-
PREPARED GROUT AND
PRESTRESSING GROUT FOR
BONDED TENDONS
- X
- X
3. VERIFY COMPLIANCE OF THE
FOLLOWING DURING
CONSTRUCTION:
C. SIZE & LOCATION OF
STRUCTURAL MEMBERS
D. TYPE, SIZE, AND LOCATION OF
ANCHORS, INCLUDING OTHER
DETAILS OF ANCHORAGE OF
MASONRY TO STRUCTURAL
MEMBERS, FRAMES, OR OTHER
CONSTRUCTION (INCLUDES
POST-INSTALLED ANCHORS)
E. WELDING OF REINFORCEMENT
- X
- X
F. PREPARATION, CONSTRUCTION,
AND PROTECTION OF MASONRY
DURING COLD WEATHER
(TEMPERATURE BELOW 40°F
(4.4°C)) OR HOT WEATHER
(TEMPERATURE ABOVE 90°F
(32.2°C))
G. APPLICATION AND
MEASUREMENT OF
PRESTRESSING FORCE
X -
- X
X -
H. PLACEMENT OF GROUT AND
PRESTRESSING GROUT FOR
BONDED TENDONS IS IN
COMPLIANCE
X -
I. PLACEMENT OF AAC MASONRY
UNITS AND CONSTRUCTION OF
THIN-BED MORTAR JOINTS
X(a) X(b)
ART. 2.1,
2.6A & 2.6C
ART. 2.4 B,
2.4 H
ART. 3.4 , 3.6 A
ART. 3.6 B
ART. 2.1 C
ART. 3.2 D,
3.2 F
SEC. 10.8 &
10.9
ART. 2.4, 3.6
SEC. 6.1, 6.3.1,
6.3.6, 6.3.7
ART. 3.2 E,
3.4
ART. 2.6 B, 2.4
G.1.b
ART. 3.3 F
SEC. 1.2.1(e), 6.2.1, 6.3.1
SEC. 6.1.6.1.2
ART. 1.8 C,
1.8D
ART. 3.6 B
ART. 3.5, 3.6 C
ART. 3.3 B.9,
3.3 F.1.b
ART. 1.4 B.2.a.3,
1.4 B.2.b.3,
1.4 B.2.c.3, 1.4B.3,
1.4 B.4
X(a)
ICC/IAPMO REPORT (POST-
INSTALLED ANCHORS)
MINIMUM VERIFICATION REFERENCE FOR CRITERIA
TMS 602 ART. 1.5
PRIOR TO CONSTRUCTION, VERIFICATION OF COMPLIANCE
SUBMITTALS
PRIOR TO CONSTRUCTION, VERIFICATION OF F'M AND F'AAC,
EXCEPT WHERE SPECIFICALLY EXEMPTED BY CODE.
DURING CONSTRUCTION, VERIFICATION OF SLUMP FLOW AND
VISUAL STABILITY INDEX (VSI) WHEN SELF-CONSOLIDATING GROUT
IS DELIVERED TO THE PROJECT SITE
TMS 602 ART. 1.4B
TMS 602 ART. 1.5 & 1.6.3
F. SAMPLE PANEL CONSTRUCTION - X ART. 1.6D
B. PLACEMENT OF MASONRY UNITS
AND MORTAR JOINT
CONSTRUCTION
- X ART. 3.3 B
A. MATERIALS AND PROCEDURES
WITH THE APPROVED
SUBMITTALS
- X ART. 1.5
INSPECTION TASK
CONTINUOUS TMS 402 PERIODIC
1. AS MASONRY CONSTRUCTION
BEGINS, VERIFY THAT THE
FOLLOWING ARE IN COMPLIANCE
A. PROPORTIONS OF SITE-
PREPARED MORTAR
B. GRADE AND SIZE OF
PRESTRESSING TENDONS AND
ANCHORAGES
- X
2. PRIOR TO GROUTING, VERIFY THAT
THE FOLLOWING ARE IN
COMPLIANCE:
4. OBSERVE PREPARATION OF GROUT
SPECIMENS, MORTAR SPECIMENS,
AND/OR PRISMS
- X
MINIMUM VERIFICATION REQUIREMENTS
MINIMUM SPECIAL INSPECTION
FREQUENCY REFERENCE FOR CRITERIA
TMS 602
C. GRADE, TYPE AND SIZE OF
REINFORCEMENT,
CONNECTORS, ANCHOR BOLTS,
AND PRESTRESSING TENDONS
AND ANCHORAGES
D. PRESTRESSING TECHNIQUE
E. PROPERTIES OF THIN-BED
MORTAR FOR AAC MASONRY
- X
- X
- X
A. GROUT SPACE
B. PLACEMENT OF PRESTRESSING
TENDONS AND ANCHORAGES
C. PLACEMENT OF
REINFORCEMENT, CONNECTORS,
AND ANCHOR BOLTS
- X
D. PROPORTIONS OF SITE-
PREPARED GROUT AND
PRESTRESSING GROUT FOR
BONDED TENDONS
- X
3. VERIFY COMPLIANCE OF THE
FOLLOWING DURING
CONSTRUCTION:
C. SIZE & LOCATION OF
STRUCTURAL MEMBERS
D. TYPE, SIZE, AND LOCATION OF
ANCHORS, INCLUDING OTHER
DETAILS OF ANCHORAGE OF
MASONRY TO STRUCTURAL
MEMBERS, FRAMES, OR OTHER
CONSTRUCTION (INCLUDES
POST-INSTALLED ANCHORS)
E. WELDING OF REINFORCEMENT
- X
F. PREPARATION, CONSTRUCTION,
AND PROTECTION OF MASONRY
DURING COLD WEATHER
(TEMPERATURE BELOW 40°F (4.4°
C)) OR HOT WEATHER
(TEMPERATURE ABOVE 90°F
(32.2°C))
G. APPLICATION AND
MEASUREMENT OF
PRESTRESSING FORCE
X -
- X
X -
H. PLACEMENT OF GROUT AND
PRESTRESSING GROUT FOR
BONDED TENDONS IS IN
COMPLIANCE
X -
I. PLACEMENT OF AAC MASONRY
UNITS AND CONSTRUCTION OF
THIN-BED MORTAR JOINTS
X -
ART. 2.1,
2.6A & 2.6C
ART. 2.4 B,
2.4 H
ART. 3.4 , 3.6 A
ART. 3.6 B
ART. 2.1 C
ART. 3.2 D,
3.2 F
SEC. 10.8 &
10.9
ART. 2.4, 3.6
SEC. 6.1, 6.3.1,
6.3.6, 6.3.7
ART. 3.2 E,
3.4
ART. 2.6 B, 2.4
G.1.b
ART. 3.3 F
SEC. 1.2.1(e), 6.2.1, 6.3.1
SEC. 6.1.6.1.2
ART. 1.8 C,
1.8D
ART. 3.6 B
ART. 3.5, 3.6 C
ART. 3.3 B.9,
3.3 F.1.b
ART. 1.4 B.2.a.3,
1.4 B.2.b.3,
1.4 B.2.c.3, 1.4B.3,
1.4 B.4
X
ICC/IAPMO REPORT (POST-
INSTALLED ANCHORS)
MINIMUM VERIFICATION REFERENCE FOR CRITERIA
TMS 602 ART. 1.5
PRIOR TO CONSTRUCTION, VERIFICATION OF COMPLIANCE
SUBMITTALS
PRIOR TO CONSTRUCTION, VERIFICATION OF F'M AND F'AAC,
EXCEPT WHERE SPECIFICALLY EXEMPTED BY CODE.
DURING CONSTRUCTION, VERIFICATION OF SLUMP FLOW AND
VISUAL STABILITY INDEX (VSI) WHEN SELF-CONSOLIDATING GROUT
IS DELIVERED TO THE PROJECT SITE
TMS 602 ART. 1.4B
TMS 602 ART. 1.5 & 1.6.3
F. SAMPLE PANEL CONSTRUCTION X - ART. 1.6D
B. PLACEMENT OF MASONRY UNITS
AND MORTAR JOINT
CONSTRUCTION
- X ART. 3.3 B
A. MATERIALS AND PROCEDURES
WITH THE APPROVED
SUBMITTALS
- X ART. 1.5
MASONRY CONSTRUCTION - LEVEL 3 - REQUIRED SPECIAL INSPECTIONS AND TESTS
TMS602 TABLE 3 AND 4
110SN403
X -
X -
X -
X -
DURING CONSTRUCTION, VERIFICATION OF F'M AND F'AAC FOR
EVERY 5,000 SQ. FT. (465 SQ. M)
TMS 602 ART. 1.4B
DURING CONSTRUCTION, VERIFICATION OF PROPORTIONS OF
MATERIALS AS DELIVERED TO THE PROJECT SITE FOR PREMIXED
OR PREBLENDED MORTAR, PRESTRESSING GROUT, AND GROUT
OTHER THAN SELF-CONSOLIDATING GROUT.
TMS 602 ART. 1.4B
INSPECTION TASK
MASONRY CONSTRUCTION - POST-INSTALLED ANCHORS - LEVEL 2 REQUIRED SPECIAL
INSPECTIONS AND TESTS
TMS 602 TABLE 3 AND 4
110SN404
CONTINUOUS PERIODIC
FREQUENCY
REFERENCE FOR CRITERIA
1. VERIFY COMPLIANCE OF THE
FOLLOWING DURING
CONSTRUCTION:
A. TYPE, SIZE, AND LOCATION OF
POST-INSTALLED ANCHORS,
INCLUDING OTHER DETAILS OF
ANCHORAGE OF MASONRY TO
STRUCTURAL MEMBERS,
FRAMES, OR OTHER
CONSTRUCTION
- X ICC/IAPMO REPORT
INSPECTION TASK
MASONRY CONSTRUCTION - POST-INSTALLED ANCHORS - LEVEL 3 REQUIRED SPECIAL
INSPECTIONS AND TESTS
TMS 602 TABLE 3 AND 4
110SN405
CONTINUOUS PERIODIC
FREQUENCY
REFERENCE FOR CRITERIA
1. VERIFY COMPLIANCE OF THE
FOLLOWING DURING
CONSTRUCTION:
A. TYPE, SIZE, AND LOCATION OF
POST-INSTALLED ANCHORS,
INCLUDING OTHER DETAILS OF
ANCHORAGE OF MASONRY TO
STRUCTURAL MEMBERS,
FRAMES, OR OTHER
CONSTRUCTION
X - ICC/IAPMO REPORT
S
S TA TE OF CAL I FOR N I A
STRUCTURAL
R
EFORP
DERETSIGE
SI N
ENGINEER
O AL
DE
PA
R
TM
EN
T
OF
CO
RRE
CT IONS AND
REHAB
IL
ITA
T
IO
N
S T
A
TE
OF CAL I FORN
I A
A rc h ite ct s, I n c.
H
IB
SE
R Y
A M
A U C
H I n d S tr ee t, S u ite
D a vi s, C
A
.7
.1 o ff ic e
.7
.4 fa x
600 Q STREET, SUITE 200
SACRAMENTO, CA 95811
916 443 0303
CALIFORNIA DEPARTMENT OF
CORRECTIONS AND REHABILITATION
ACCESS COMPLIANCE REVIEW
APPROVAL OF THIS PLAN DOES NOT
AUTHORIZE OR APPROVE ANY OMISSION OR
DEVIATION FROM THE APPLICABLE REGULATIONS.
TRACKING NUMBER:___________________
DATE:____________________________
REVIEWER:_________________________
APPROVAL
F
IN
A L
D R
A W
IN
G
S
SHEET NUMBER
ST
AT
E O
F C
AL
IF
O R
NI
A
D
EP
AR
TM
EN
T
O F
C O
R
RE
C
TI
O
NS
A
ND
R
EH
AB
IL
IT
AT
IO
N
FA
CI
LI
TY
P
LA
NN
IN
G , C
O N
ST
R
U
CT
IO
N
AN
D
M
AN
AG
EM
EN
T
DI
VI
SI
O
N
DE
SI
GN
S
ER
VI
CE
S
AN
D
ST
AN
DA
RD
S
BR
AN
CH
DE
SI
GN
S
ER
VI
CE
S
SE
CT
IO
N
R E V
D A T E
D
S C R
IP
T
IO
N
L A C
V1
C A
LI
F O
R N
IA
S T A T E P
R
IS
O N , L
O S A
N G
E
LE
S C
O U N T Y
TH
S
TR
EE
T, W
ES
T
LA
N C
AS
TE
R , C
A
R E P
LA
C E R
O O
F
P H A S
C
C R
P H A S E
J O B
N U M B E R
A T E A
U G
U S T
1, P ro je c t N o
.1
P ro je c t
P h a s e
S H E E T
T
IT
L
M. TODD
THORP
No. 2990
/9
/2
:3
:1
P
M c re v it \2
-0
.0
C D
C R
L A P
H R C
E N
T R A L d d ir e .r v t
S T R
U C T U
R A L S
P E C
IA
L
IN
S P E C
T
IO
N S
T E S T
IN
G
SSSS111100002 222
APPLICABLE TO ALL DRAWINGS UNLESS NOTED OR SHOWN OTHERWISE
STRUCTURAL SPECIAL INSPECTIONS AND TESTING
08/24/2023
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/10/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
23-0002
11/20/2023 CASp 491 #1317
File details come from the government source that posted it. Updated .