21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_1.pdf

PDF 1 MB Posted

Attached to
FPCM-LAC-I001104-M035-RS
Solicitation number
0000036277
Issued by
Los Angeles County, California

About this file

This document is a set of final construction drawings for a roof replacement project at the California State Prison, Los Angeles County (LAC) in Lancaster, California, prepared by the California Department of Corrections and Rehabilitation (CDCR). Phase 1 of the project involves replacing roofs on 20 270 Housing Units, specifically targeting Buildings 331-3410. The scope of work includes removing existing roofing systems down to the roof deck, inspecting for water damage, installing a new single-ply PVC membrane assembly with rigid insulation, raising roof curbs and equipment, replacing sheet metal flashing and associated components, and ensuring a new Class A roof with a minimum R-30 insulation factor.

The project is designed to comply with multiple 2022 California building codes, including the California Building Code, Electrical Code, Mechanical Code, Plumbing Code, Energy Code, Fire Code, and Green Building Standards Code. The drawings were finalized on August 31, 2023, with approval from the Office of the State Fire Marshal received on October 10, 2023. The project number is 21-040, and the total scope covers roof replacements across multiple housing unit buildings, with an emphasis on maintaining structural integrity, safety, and accessibility while upgrading the facility's roofing infrastructure.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE ROOFS - PHASE 1

CALIFORNIA STATE PRISON, LOS ANGELES COUNTY (LAC)

LANCASTER, CALIFORNIA

LOCATION MAP

NO SCALE

N

1. THE BUILDER SHALL VERIFY THAT THE EXISTING SYSTEM OR

COMPONENTS IMPACTING THIS NEW WORK ARE ENABLED, OPERATIONAL

AND FUNCTIONING PROPERLY BEFORE COMMENCING WITH NEW WORK.

THE INSTITUTION IS RESPONSIBLE FOR MAINTAINING THE SYSTEM IN

ORIGINAL WORKING CONDITION TO ACCOMMODATE THIS NEW WORK.

2. DETAILS MARKED TYPICAL SHALL APPLY IN ALL CASES UNLESS

SPECIFICALLY DETAILED OTHERWISE. WHERE NO DETAIL IS SHOWN

CONSTRUCTION SHALL BE AS SHOWN FOR OTHER SIMILAR WORK OR AS

PRESCRIBED BY MANUFACTURER.

3. THE DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED

STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION.

THE BUILDER SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT

THE STRUCTURE AND SAFETY OF THE WORKERS DURING CONSTRUCTION.

SUCH MEASURES SHALL INCLUDE BUT NOT BE LIMITED TO, BRACING,

SHORING, FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC.

4. PROVIDE CONSTRUCTION BARRIERS. REMOVE TEMPORARY/REINSTALL

ANCHORED EQUIPMENT AS DIRECTED BY CDCR MANAGEMENT.

5. COORDINATE CONSTRUCTION PHASING WITH CDCR MANAGEMENT.

6. A BULK ASBESTOS AND LEAD-BASED PAINT SURVEY HAS BEEN

PERFORMED. SEE REPORT AS PART OF THE CONSTRUCTION DOCUMENTS.

7. DURING CONSTRUCTION, PORTABLE FIRE EXTINGUISHERS SHALL BE

PROVIDED IN ANY STORAGE AND CONSTRUCTION SHED AND SHALL BE

PROVIDED WHERE REFUELING OF EQUIPMENT OCCURS. PORTABLE FIRE

EXTINGUISHERS SHALL BEAR THE SFM LABEL OF CURRENCY WITH

REQUIRED INSPECTION AND MAINTENANCE.

8. ALL MOTORIZED CONSTRUCTION EQUIPMENT AND REFUELING OF

EQUIPMENT SHALL BE IN AN AREA NOT TO IMPACT BUILDING INTAKES,

SHALL NOT BE REFUELED WHEN VEHICLE IS RUNNING, AND SHALL BE

REFUELED IN AN APPROVED AREA. ALL FUEL THAT IS STORED ON SITE

FOR SUPPORT OF CONSTRUCTION VEHICLES SHALL BE STORED IN AN

APPROVED AREA OUTSIDE OF A BUILDING.

9. ALL NEW MATERIALS SHALL BE INSPECTED BEFORE USE. VERIFY LABEL

THAT INDICATES ITS LISTING.

10. COMBUSTIBLE WASTE SHALL BE REMOVED FROM THE SITE DAILY AND AT

THE END OF EACH SHIFT.

11.REPAIR ALL EXISTING SURFACES DAMAGED DURING CONSTRUCTION.

12.DO NOT SCALE DRAWINGS.

13. ARCHITECT IS NOT RESPONSIBLE FOR THE DISCOVERY, PRESENCE,

HANDLING, REMOVAL OR DISPOSAL OF, OR EXPOSURE OF PERSONS TO,

HAZARDOUS MATERIALS OR TOXIC SUBSTANCES IN ANY FORM AT THE

PROJECT SITE. TO THE EXTENT THESE DOCUMENTS RELATE TO SUCH

ISSUES, ARCHITECT'S PARTICIPATION IS SOLELY ADMINISTRATIVE

WITHOUT ANY RESPONSIBILITY FOR THE CONTENT OR EXECUTION OF

SUCH DOCUMENTS.

14. REPAIR, REPLACEMENT OR MAINTENANCE OF EXISTING MECHANICAL EQUIPMENT,

TO INCLUDE EVAPORATIVE COOLERS, EXHAUST FANS, SMOKE EVACUATION FANS,

ETC., ARE NOT PART OF THE SCOPE OF WORK FOR THIS PROJECT. THE

BUILDER/CONTRACTOR SHALL TEST AND DOCUMENT THE OPERATION AND

CONDITION OF EACH PIECE OF EQUIPMENT TO BE REMOVED AND REINSTALLED

AS PART OF THE PROJECT PRIOR TO COMMENCING THE WORK. THE

BUILDER/CONTRACTOR SHALL ENSURE REINSTALLED EQUIPMENT OPERATES THE

SAME AS DOCUMENTED PRIOR TO THE START OF THE PROJECT.

15. THE CONTRACTOR SHALL OBSERVE THE 2022 CALIFORNIA FIRE CODE CHAPTER

33 - SAFETY DURING CONSTRUCTION WHILE CONSTRUCTION IS IN PROCESS.

DEFERRED SUBMITTAL

SCOPE OF WORK

GENERAL NOTES

CALIFORNIA STATE FIRE MARSHAL FIELD INSPECTION

THE CONTRACTOR SHALL FURNISH TO THE STATE FIRE

MARSHAL FIELD DEPUTY A COPY OF THESE APPROVED

DRAWINGS AND SPECIFICATIONS FOR THEIR USE

DURING CONSTRUCTION OF THIS PROJECT. AFTER

CONSTRUCTION, THE STATE FIRE MARSHAL FIELD

DEPUTY SHALL RETURN THE DRAWINGS TO THE CDCR

FIELD REPRESENTATIVE FOR DISPOSAL

FOR FIELD INSPECTIONS AND FIRE PROTECTION

SYSTEMS ACCEPTANCE TESTING, CONTACT:

DEPUTY:____________________AT:_______________

TO SCHEDULE APPOINTMENTS

CALIFORNIA STATE FIRE MARSHAL APPROVED

CSFM FILE NO: SEE TABLE BELOW

VICINITY MAP

NO SCALE

CONSULTANTS

ARCHITECT

MECHANICAL / PLUMBING

ELECTRICAL / COMMUNICATIONS

HY ARCHITECTS

4602 2ND STREET, SUITE #3

DAVIS, CA 95618

CONTACT: MICHAEL FENECH

ARCH. OF RECORD: KEN YAMAUCHI

TEL. (530) 758-1270

BUEHLER ENGINEERING

600 Q ST. SUITE 200

SACRAMENTO, CA 95814

CONTACT: TODD THORP

TEL. (916) 443-0303

TEL. (916) 325-1065

TURLEY MECHANICAL ENGINEERS

1914 S STREET

SACRAMENTO, CA 95811

CONTACT: JOHN THOMPSON

TEL. (916) 923-4400

M. NEILS ENGINEERING. INC

100 HOWE AVE, SUITE 235N

SACRAMENTO, CA 95825

CONTACT: STUART LINDSAY

STRUCTURAL

N

DRAWING INDEX

PROJECT SITE

LAC ROOF REPLACEMENT

NONE

FINAL REVIEW-COMPLIES

FINAL REVIEW-EXEMPT

THIS ALTERATION PROJECT, IN CONJUNCTION WITH PROGRAM

ACCOMMODATIONS/MODIFICATIONS, IS UNDERTAKEN SOLELY TO

PROVIDE PROGRAM ACCESSIBILITY. PURSUANT TO 28 CFR

35.151(b)(2), PATH OF TRAVEL ALTERATIONS ARE NOT REQUIRED.

FINAL REVIEW-IMPROVEMENT AREA ONLY COMPLIES.

PATH OF TRAVEL TO THE IMPROVEMENT AREA, ALONG WITH

OTHER ADA REQUIRED IMPROVEMENTS, INCLUDING ACCESS TO

SUPPORT SPACES, PROGRAM SPACES, ETC. WILL NEED TO BE

COMPLETED UNDER A SEPARATELY FUNDED PROJECT PRIOR

TO DPW INMATES USING THE IMPROVED AREA.

CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION

ACCESS COMPLIANCE REVIEW

APPROVAL OF THIS PLAN DOES NOT AUTHORIZE OR APPROVE ANY

OMISSION OR DEVIATION FROM THE APPLICABLE CODES AND

REGULATIONS.

TRACKING NUMBER: DATE:

REVIEWER:

PHASE 1 CONSISTS OF 20 270 HOUSING UNITS.

THE SCOPE OF THIS PROJECT INCLUDES:

1. REMOVAL OF (E) ROOFING SYSTEM TO (E) ROOF DECK.

2. INSPECTION OF (E) ROOF DECK TO DETERMINE THE EXTENT OF ANY WATER DAMAGE.

3. INSTALL (N) SINGLE PLY PVC MEMBRANE ASSEMBLY WITH NEW RIGID INSULATION.

4. RAISE ROOF CURBS, EQUIPMENT, AND PARAPETS AS REQUIRED FOR NEW ROOF SLOPE.

REPLACE SHEET METAL FLASHING, COUNTER-FLASHING, SCUPPERS, DRAINS AND COPING

CAP, ETC.

5. THE ASSEMBLY SHALL BE A NEW CLASS A ROOF WITH MIN. R-30 INSULATION FACTOR, TYP.

CSFM PERMIT NUMBERS

CDCR PROJECT EMAIL: m_LAC_21-040@cdcr.co.gov

CDCR PROJECT PASSWORD: LAC,qp@21-040

CDCR BLDG. NO. PERMIT APPLICATION NO.

PROJECT MANUAL

OWNER AND OCCUPANT: CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION

PROJECT #21-040 REPLACE ROOF, 270 HOUSING UNITS

G0.1 TITLE SHEET

G0.2 BUILDING CODE ANALYSIS

G0.3 TITLE 24 REPORTS

A101 OVERALL SITE PLAN

S101 GENERAL NOTES

S102 STRUCTURAL SPECIAL INSPECTION & TESTING

MP001 MECHANICAL / PLUMBING LEGEND, NOTES AND SCHEDULES

EA01 ELECTRICAL SHEET INDEX, SYMBOL LIST AND ABBREVIATIONS,

AND DEMOLITION GENERAL NOTES

TYPICAL HOUSING UNIT

AA201 TYPICAL 270 HOUSING UNIT ROOF PLAN DEMOLITION

AA301 TYPICAL 270 HOUSING UNIT ROOF PLAN REMODEL

AA501 270 HOUSING UNIT TYPICAL BUILDING EXTERIOR ELEVATIONS

AA601 270 HOUSING UNIT TYPICAL BUILDING SECTIONS

SA201 ROOF FRAMING PLAN - TYP 270 HOUSING UNIT

MPA201 MECHANICAL / PLUMBING TYPICAL 270 HOUSING UNIT ROOF PLAN DEMOLITION

MPA301 MECHANICAL / PLUMBING TYPICAL HOUSING UNIT ROOF PLAN REMODEL

MPA302 PLUMBING TYPICAL 270 HOUSING UNIT ROOF PLAN RAINWATER

EA201 TYPICAL 270 HOUSING UNIT ROOF PLAN - DEMOLITION - ELECTRICAL

EA301 TYPICAL 270 HOUSING UNIT ROOF PLAN - REMODEL - ELECTRICAL

FACILITY A 270 HOUSING UNIT BUILDING 334

AB201 FACILITY A 270 HOUSING UNIT BUILDING 334 ROOF PLAN DEMOLITION

AB301 FACILITY A 270 HOUSING UNIT BUILDING 334 ROOF PLAN REMODEL

AB501 FACILITY A 270 HOUSING UNIT BUILDING 334 BUILDING EXTERIOR ELEVATIONS

AB601 FACILITY A 270 HOUSING UNIT BUILDING 334 BUILDING SECTIONS

SB201 ROOF FRAMING PLAN - BLDG 334 AD SEG 270 HOUSING UNIT

MPB201 MECHANICAL / PLUMBING FACILITY A 270 HU BUILDING 334 ROOF PLAN DEMOLITION

MPB301 MECHANICAL / PLUMBING FACILITY A 270 HU BUILDING 334 ROOF PLAN REMODEL

MPB302 PLUMBING FACILITY A 270 HU BUILDING 334 ROOF PLAN RAINWATER

EB201 FACILITY A 270 HU BUILDING 334 ROOF PLAN - DEMOLITION - ELECTRICAL

EB301 FACILITY A 270 HU BUILDING 334 ROOF PLAN - REMODEL - ELECTRICAL

270 HOUSING UNIT - BUILDINGS 346-347

AC201 270 HOUSING UNIT BUILDINGS 346 - 347 ROOF PLAN DEMOLITION

AC301 270 HOUSING UNIT BUILDINGS 346 - 347 ROOF PLAN REMODEL

AC501 270 HOUSING UNIT BUILDINGS 346 - 347 BUILDING EXTERIOR ELEVATIONS

AC601 270 HOUSING UNIT BUILDINGS 346 - 347 BUILDING SECTIONS

SC201 ROOF FRAMING PLAN - BLDG 346 & BLDG 347

MPC201 MECHANICAL / PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN DEMOLITION

MPC301 MECHANICAL / PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN REMODEL

MPC302 PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN RAINWATER

EC201 270 HU BUILDINGS 346 THRU 347 ROOF PLAN - DEMOLITION - ELECTRICAL

EC301 270 HU BUILDINGS 346 THRU 347 ROOF PLAN - REMODEL - ELECTRICAL

NONSTRUCTURAL PROVISIONS / BUILDING CODE ANALYSIS (SEE SHEET G.02)

ALL WORK SHALL COMPLY WITH AT LEAST THE MINIMUM STANDARDS

OF THE FOLLOWING PARTIAL LIST OF APPLICABLE CODES AS OF

JANUARY 1, 2020:

- 2022 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE

24 C.C.R.

- 2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R.

- 2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R.

- 2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R.

- 2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R.

- 2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R.

- 2022 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 C.C.R.

- 2022 CA GREEN BUILDING STANDARDS CODE (CAL GREEN), PART 11,

TITLE 24, C.C.R.

- 2022 CALIFORNIA REFERENCE STANDARDS, PART 12, TITLE 24

C.C.R.

- TITLE 19 C.C.R. PUBLIC SAFETY, STATE FIRE MARSHAL

REGULATIONS

- 2010 AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARDS:

- NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS, 2022

EDITION, CA AMENDED

- NFPA 14 INSTALLATION OF STANDPIPE SYSTEMS, 2019

EDITION, CA AMENDED

- NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2022

EDITION, CA AMENDED

- NFPA 101 LIFE SAFETY CODE, 2021 EDITION

- NFPA 110 EMERGENCY AND STANDBY POWER SYSTEMS,

2019 EDITION

- NFPA 170 STANDARD FOR FIRE SAFETY AND EMERGENCY

SYMBOLS, 2018 EDITION

THE ABOVE CODES AND REGULATIONS REFER TO THE LATEST

EDITION OR REVISION IN FORCE ON THE DATE OF THE CONTRACT,

UNLESS OTHERWISE STATED. NOTHING ON THE DRAWINGS IS TO BE

CONSTRUED AS REQUIRING OR PERMITTING WORK THAT IS

CONTRARY TO THE LISTED CODES AND REGULATIONS, OR OTHER

LOCAL, STATE OR FEDERAL CODES OR REGULATIONS WHICH MAY

BE APPLICABLE. SEE 2022 CBC, CHAPTER 35-REFERENCE

STANDARDS, FOR FULL LIST OF OSFM ADOPTED CODES AND

STANDARD.

SYMBOLS APPLICABLE CODES

FIRE AUTHORITY

· DESIGN CRITERIA GUIDELINES

(DCG)

LOCAL FIRE AUTHORITY IS

REQUIRED. LOS ANGELES

CALIFORNIA DEPARTMENT OF

CORRECTIONS AND

REHABILITATIONS (CDCR) IS THE

LOCAL DEPARTMENT.

A-000

DETAIL NUMBER

SHEET NUMBER

STRUCTURAL COLUMN

GRID LINES

REGULATIONS

CONCRETE

CONCRETE BLOCK

BATT INSULATION

RIGID INSULATION

GYPSUM BOARD WOOD FRAMING

WOOD BLOCKING

FINISH WOODMETAL

MATERIAL DESIGNATION

& AND

@ AT

℄ CENTERLINE

Ø DIAMETER

# POUND OR NUMBER

A/C AIR CONDITIONING

AC ASPHALTIC CONCRETE

ACOUS ACOUSTICAL

ACT ACOUSTIC CEILING TILE

ADD ADDITIONAL

ADJ ADJACENT

AFF ABOVE FINISHED FLOOR

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

BITUM BITUMINOUS

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BTWN BETWEEN

BUR BUILT-UP ROOFING

CAB CABINET

CB CATCH BASIN

CFCI CONTRACTOR FURNISHED

CONTRACTOR INSTALLED

CG CORNER GUARD

CJ CONTROL JOINT

CLG CEILING

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY

UNIT

CO CLEAN OUT

COL COLUMN

COMP COMPOSITION

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CORR CORRIDOR

CT CERAMIC TILE

CUST CUSTODIAN

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DG DETENTION-GRADE

DI DRAIN OR DROP INLET

DIA DIAMETER

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DIV DIVISION

DN DOWN

DS DOWNSPOUT

DTL DETAIL

DW DISHWASHER

DWG DRAWING

(E) EXISTING

E EAST

EA EACH

EF EXHAUST FAN

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

ENCL ENCLOSURE

EQ EQUAL

EQUIP EQUIPMENT

EVA EMERGENCY VEHICLE

ACCESS

EWC ELECTRICAL WATER

COOLER

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISH FLOOR

FIN FINISH

FLR FLOOR

FO FACE OF

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOS FACE OF STUD

FRP FIBERGLASS

REINFORCED PANEL

FT FOOT OR FEET

FTG FOOTING

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GSM GALVANIZED SHEET

METAL

GYP GYPSUM

HB HOSE BIB

HC HOLLOW CORE

HD HEAD

HDWR HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR

HT HEIGHT

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUNDS

LT LIGHT

MAX MAXIMUM

MB MACHINE BOLT

MDF MEDIUM DENSITY

FIREBOARD

MECH MECHANICAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MOD MODULAR

MTD MOUNTED

MTG MOUNTING

MTL METAL

MUL MULLION

(N) NEW

N NORTH

NIC NOT IN CONTRACT

NO or # NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O/ OVER

OC ON CENTER

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED

OWNER INSTALLED

OPP OPPOSITE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PR PAIR

PTD PAPER TOWEL

DISPENSER

PVC POLYVINYL CHLORIDE

(R) RELOCATE

RB RESILIENT OR RUBBER

BASE

RCP REFLECTED CEILING

PLAN

RD ROOF DRAIN

REF REFERENCE

REFR REFRIGERATOR

REINF REINFORCED

REQ REQUIRED

RF RESILIENT FLOORING

RM ROOM

RO ROUGH OPENING

RWL RAIN WATER LEADER

S SOUTH

SC SOLID CORE

SCD SEE CIVIL DRAWINGS

SCHED SCHEDULE

SD SOAP DISPENSER

SED SEE ELECTRICAL

DRAWINGS

SFPD SEE FIRE PROTECTION

DRAWINGS

SHT SHEET

SIM SIMILAR

SLD SEE LANDSCAPE

DRAWINGS

SMD SEE MECHANICAL

DRAWINGS

SMS SHEET METAL SCREW

SND SANITARY NAPKIN

DISPENSER

SPD SEE PLUMBING

DRAWINGS

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

SSD SEE STRUCTURAL

DRAWINGS

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPEND

TEL TELEPHONE

TEMP TEMPORARY

THK THICK

T.O. TOP OF

TOC TOP OF CURB

TOP TOP OF PARAPET

TOS TOP OF SLAB

TOW TOP OF WALL

TPD TOILET PAPER

DISPENSER

TV TELEVISION

TYP TYPICAL

UON UNLESS OTHERWISE

NOTED

VCT VINYL

COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

W WEST

w/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WH WATER HEATER

W

S

E

N

A-000

DETAIL NUMBER

SHEET NUMBER

D

012 KEYNOTE TAG

ABBREVIATIONS

W AVE J

W AVE I

T H

S T W

T H

S T W

DETAILS

A900 DETAILS

A901 DETAILS

A902 DETAILS

A903 DETAILS

A904 DETAILS

A905 DETAILS

A906 DETAILS

S301 SECTIONS

S501 TYPICAL DETAILS

MP501 MECHANICAL / PLUMBING DETAILS

MP502 MECHANICAL / PLUMBING DETAILS

MP801 MECHANICAL / PLUMBING PHOTOS

MP802 MECHANICAL / PLUMBING PHOTOS

E9.001 ELECTRICAL DETAILS

23-S-0001-C-PR

BLDG 331

BLDG 332

BLDG 333

BLDG 334

BLDG 335

BLDG 336

BLDG 337

BLDG 338

BLDG 339

BLDG 3310

BLDG 341

BLDG 342

BLDG 343

BLDG 344

BLDG 345

BLDG 346

BLDG 347

BLDG 348

BLDG 349

BLDG 3410

23-S-0002-C

23-S-0003-C

23-S-0004-C

23-S-0005-C

23-S-0006-C

23-S-0007-C

23-S-0008-C

23-S-0009-C

23-S-0010-C

23-S-0011-C

23-S-0012-C

23-S-0013-C

23-S-0014-C

23-S-0015-C

23-S-0016-C

23-S-0017-C

23-S-0018-C

23-S-0019-C

23-S-0020-C

23-S-0021-C

G0.1

P H

A S E

T

IT

L E S

H E E T

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R

N

IA

D E P A R

TM

E N

T O

F C

O R

R E C

TI

O

N S A

N D

R E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O

N A

N D

M A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N

L O

S A

N G

E L E S C

O U

N T Y

TH

S

T R

E E T , W

E S T

LA

N

C A S

TE

R , C

A

R E P L A C

E R

O O

F S

P H

A S E

A U

G U

S T

F

IN

A L D

R A W

IN

G

S

.1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp 491 #1317 x

File details come from the government source that posted it. Updated .