21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_1.pdf
PDF 1 MB Posted
- Attached to
- FPCM-LAC-I001104-M035-RS
- Solicitation number
- 0000036277
- Issued by
- Los Angeles County, California
About this file
This document is a set of final construction drawings for a roof replacement project at the California State Prison, Los Angeles County (LAC) in Lancaster, California, prepared by the California Department of Corrections and Rehabilitation (CDCR). Phase 1 of the project involves replacing roofs on 20 270 Housing Units, specifically targeting Buildings 331-3410. The scope of work includes removing existing roofing systems down to the roof deck, inspecting for water damage, installing a new single-ply PVC membrane assembly with rigid insulation, raising roof curbs and equipment, replacing sheet metal flashing and associated components, and ensuring a new Class A roof with a minimum R-30 insulation factor.
The project is designed to comply with multiple 2022 California building codes, including the California Building Code, Electrical Code, Mechanical Code, Plumbing Code, Energy Code, Fire Code, and Green Building Standards Code. The drawings were finalized on August 31, 2023, with approval from the Office of the State Fire Marshal received on October 10, 2023. The project number is 21-040, and the total scope covers roof replacements across multiple housing unit buildings, with an emphasis on maintaining structural integrity, safety, and accessibility while upgrading the facility's roofing infrastructure.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE ROOFS - PHASE 1
CALIFORNIA STATE PRISON, LOS ANGELES COUNTY (LAC)
LANCASTER, CALIFORNIA
LOCATION MAP
NO SCALE
N
1. THE BUILDER SHALL VERIFY THAT THE EXISTING SYSTEM OR
COMPONENTS IMPACTING THIS NEW WORK ARE ENABLED, OPERATIONAL
AND FUNCTIONING PROPERLY BEFORE COMMENCING WITH NEW WORK.
THE INSTITUTION IS RESPONSIBLE FOR MAINTAINING THE SYSTEM IN
ORIGINAL WORKING CONDITION TO ACCOMMODATE THIS NEW WORK.
2. DETAILS MARKED TYPICAL SHALL APPLY IN ALL CASES UNLESS
SPECIFICALLY DETAILED OTHERWISE. WHERE NO DETAIL IS SHOWN
CONSTRUCTION SHALL BE AS SHOWN FOR OTHER SIMILAR WORK OR AS
PRESCRIBED BY MANUFACTURER.
3. THE DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION.
THE BUILDER SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT
THE STRUCTURE AND SAFETY OF THE WORKERS DURING CONSTRUCTION.
SUCH MEASURES SHALL INCLUDE BUT NOT BE LIMITED TO, BRACING,
SHORING, FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC.
4. PROVIDE CONSTRUCTION BARRIERS. REMOVE TEMPORARY/REINSTALL
ANCHORED EQUIPMENT AS DIRECTED BY CDCR MANAGEMENT.
5. COORDINATE CONSTRUCTION PHASING WITH CDCR MANAGEMENT.
6. A BULK ASBESTOS AND LEAD-BASED PAINT SURVEY HAS BEEN
PERFORMED. SEE REPORT AS PART OF THE CONSTRUCTION DOCUMENTS.
7. DURING CONSTRUCTION, PORTABLE FIRE EXTINGUISHERS SHALL BE
PROVIDED IN ANY STORAGE AND CONSTRUCTION SHED AND SHALL BE
PROVIDED WHERE REFUELING OF EQUIPMENT OCCURS. PORTABLE FIRE
EXTINGUISHERS SHALL BEAR THE SFM LABEL OF CURRENCY WITH
REQUIRED INSPECTION AND MAINTENANCE.
8. ALL MOTORIZED CONSTRUCTION EQUIPMENT AND REFUELING OF
EQUIPMENT SHALL BE IN AN AREA NOT TO IMPACT BUILDING INTAKES,
SHALL NOT BE REFUELED WHEN VEHICLE IS RUNNING, AND SHALL BE
REFUELED IN AN APPROVED AREA. ALL FUEL THAT IS STORED ON SITE
FOR SUPPORT OF CONSTRUCTION VEHICLES SHALL BE STORED IN AN
APPROVED AREA OUTSIDE OF A BUILDING.
9. ALL NEW MATERIALS SHALL BE INSPECTED BEFORE USE. VERIFY LABEL
THAT INDICATES ITS LISTING.
10. COMBUSTIBLE WASTE SHALL BE REMOVED FROM THE SITE DAILY AND AT
THE END OF EACH SHIFT.
11.REPAIR ALL EXISTING SURFACES DAMAGED DURING CONSTRUCTION.
12.DO NOT SCALE DRAWINGS.
13. ARCHITECT IS NOT RESPONSIBLE FOR THE DISCOVERY, PRESENCE,
HANDLING, REMOVAL OR DISPOSAL OF, OR EXPOSURE OF PERSONS TO,
HAZARDOUS MATERIALS OR TOXIC SUBSTANCES IN ANY FORM AT THE
PROJECT SITE. TO THE EXTENT THESE DOCUMENTS RELATE TO SUCH
ISSUES, ARCHITECT'S PARTICIPATION IS SOLELY ADMINISTRATIVE
WITHOUT ANY RESPONSIBILITY FOR THE CONTENT OR EXECUTION OF
SUCH DOCUMENTS.
14. REPAIR, REPLACEMENT OR MAINTENANCE OF EXISTING MECHANICAL EQUIPMENT,
TO INCLUDE EVAPORATIVE COOLERS, EXHAUST FANS, SMOKE EVACUATION FANS,
ETC., ARE NOT PART OF THE SCOPE OF WORK FOR THIS PROJECT. THE
BUILDER/CONTRACTOR SHALL TEST AND DOCUMENT THE OPERATION AND
CONDITION OF EACH PIECE OF EQUIPMENT TO BE REMOVED AND REINSTALLED
AS PART OF THE PROJECT PRIOR TO COMMENCING THE WORK. THE
BUILDER/CONTRACTOR SHALL ENSURE REINSTALLED EQUIPMENT OPERATES THE
SAME AS DOCUMENTED PRIOR TO THE START OF THE PROJECT.
15. THE CONTRACTOR SHALL OBSERVE THE 2022 CALIFORNIA FIRE CODE CHAPTER
33 - SAFETY DURING CONSTRUCTION WHILE CONSTRUCTION IS IN PROCESS.
DEFERRED SUBMITTAL
SCOPE OF WORK
GENERAL NOTES
CALIFORNIA STATE FIRE MARSHAL FIELD INSPECTION
THE CONTRACTOR SHALL FURNISH TO THE STATE FIRE
MARSHAL FIELD DEPUTY A COPY OF THESE APPROVED
DRAWINGS AND SPECIFICATIONS FOR THEIR USE
DURING CONSTRUCTION OF THIS PROJECT. AFTER
CONSTRUCTION, THE STATE FIRE MARSHAL FIELD
DEPUTY SHALL RETURN THE DRAWINGS TO THE CDCR
FIELD REPRESENTATIVE FOR DISPOSAL
FOR FIELD INSPECTIONS AND FIRE PROTECTION
SYSTEMS ACCEPTANCE TESTING, CONTACT:
DEPUTY:____________________AT:_______________
TO SCHEDULE APPOINTMENTS
CALIFORNIA STATE FIRE MARSHAL APPROVED
CSFM FILE NO: SEE TABLE BELOW
VICINITY MAP
NO SCALE
CONSULTANTS
ARCHITECT
MECHANICAL / PLUMBING
ELECTRICAL / COMMUNICATIONS
HY ARCHITECTS
4602 2ND STREET, SUITE #3
DAVIS, CA 95618
CONTACT: MICHAEL FENECH
ARCH. OF RECORD: KEN YAMAUCHI
TEL. (530) 758-1270
BUEHLER ENGINEERING
600 Q ST. SUITE 200
SACRAMENTO, CA 95814
CONTACT: TODD THORP
TEL. (916) 443-0303
TEL. (916) 325-1065
TURLEY MECHANICAL ENGINEERS
1914 S STREET
SACRAMENTO, CA 95811
CONTACT: JOHN THOMPSON
TEL. (916) 923-4400
M. NEILS ENGINEERING. INC
100 HOWE AVE, SUITE 235N
SACRAMENTO, CA 95825
CONTACT: STUART LINDSAY
STRUCTURAL
N
DRAWING INDEX
PROJECT SITE
LAC ROOF REPLACEMENT
NONE
FINAL REVIEW-COMPLIES
FINAL REVIEW-EXEMPT
THIS ALTERATION PROJECT, IN CONJUNCTION WITH PROGRAM
ACCOMMODATIONS/MODIFICATIONS, IS UNDERTAKEN SOLELY TO
PROVIDE PROGRAM ACCESSIBILITY. PURSUANT TO 28 CFR
35.151(b)(2), PATH OF TRAVEL ALTERATIONS ARE NOT REQUIRED.
FINAL REVIEW-IMPROVEMENT AREA ONLY COMPLIES.
PATH OF TRAVEL TO THE IMPROVEMENT AREA, ALONG WITH
OTHER ADA REQUIRED IMPROVEMENTS, INCLUDING ACCESS TO
SUPPORT SPACES, PROGRAM SPACES, ETC. WILL NEED TO BE
COMPLETED UNDER A SEPARATELY FUNDED PROJECT PRIOR
TO DPW INMATES USING THE IMPROVED AREA.
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
ACCESS COMPLIANCE REVIEW
APPROVAL OF THIS PLAN DOES NOT AUTHORIZE OR APPROVE ANY
OMISSION OR DEVIATION FROM THE APPLICABLE CODES AND
REGULATIONS.
TRACKING NUMBER: DATE:
REVIEWER:
PHASE 1 CONSISTS OF 20 270 HOUSING UNITS.
THE SCOPE OF THIS PROJECT INCLUDES:
1. REMOVAL OF (E) ROOFING SYSTEM TO (E) ROOF DECK.
2. INSPECTION OF (E) ROOF DECK TO DETERMINE THE EXTENT OF ANY WATER DAMAGE.
3. INSTALL (N) SINGLE PLY PVC MEMBRANE ASSEMBLY WITH NEW RIGID INSULATION.
4. RAISE ROOF CURBS, EQUIPMENT, AND PARAPETS AS REQUIRED FOR NEW ROOF SLOPE.
REPLACE SHEET METAL FLASHING, COUNTER-FLASHING, SCUPPERS, DRAINS AND COPING
CAP, ETC.
5. THE ASSEMBLY SHALL BE A NEW CLASS A ROOF WITH MIN. R-30 INSULATION FACTOR, TYP.
CSFM PERMIT NUMBERS
CDCR PROJECT EMAIL: m_LAC_21-040@cdcr.co.gov
CDCR PROJECT PASSWORD: LAC,qp@21-040
CDCR BLDG. NO. PERMIT APPLICATION NO.
PROJECT MANUAL
OWNER AND OCCUPANT: CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
PROJECT #21-040 REPLACE ROOF, 270 HOUSING UNITS
G0.1 TITLE SHEET
G0.2 BUILDING CODE ANALYSIS
G0.3 TITLE 24 REPORTS
A101 OVERALL SITE PLAN
S101 GENERAL NOTES
S102 STRUCTURAL SPECIAL INSPECTION & TESTING
MP001 MECHANICAL / PLUMBING LEGEND, NOTES AND SCHEDULES
EA01 ELECTRICAL SHEET INDEX, SYMBOL LIST AND ABBREVIATIONS,
AND DEMOLITION GENERAL NOTES
TYPICAL HOUSING UNIT
AA201 TYPICAL 270 HOUSING UNIT ROOF PLAN DEMOLITION
AA301 TYPICAL 270 HOUSING UNIT ROOF PLAN REMODEL
AA501 270 HOUSING UNIT TYPICAL BUILDING EXTERIOR ELEVATIONS
AA601 270 HOUSING UNIT TYPICAL BUILDING SECTIONS
SA201 ROOF FRAMING PLAN - TYP 270 HOUSING UNIT
MPA201 MECHANICAL / PLUMBING TYPICAL 270 HOUSING UNIT ROOF PLAN DEMOLITION
MPA301 MECHANICAL / PLUMBING TYPICAL HOUSING UNIT ROOF PLAN REMODEL
MPA302 PLUMBING TYPICAL 270 HOUSING UNIT ROOF PLAN RAINWATER
EA201 TYPICAL 270 HOUSING UNIT ROOF PLAN - DEMOLITION - ELECTRICAL
EA301 TYPICAL 270 HOUSING UNIT ROOF PLAN - REMODEL - ELECTRICAL
FACILITY A 270 HOUSING UNIT BUILDING 334
AB201 FACILITY A 270 HOUSING UNIT BUILDING 334 ROOF PLAN DEMOLITION
AB301 FACILITY A 270 HOUSING UNIT BUILDING 334 ROOF PLAN REMODEL
AB501 FACILITY A 270 HOUSING UNIT BUILDING 334 BUILDING EXTERIOR ELEVATIONS
AB601 FACILITY A 270 HOUSING UNIT BUILDING 334 BUILDING SECTIONS
SB201 ROOF FRAMING PLAN - BLDG 334 AD SEG 270 HOUSING UNIT
MPB201 MECHANICAL / PLUMBING FACILITY A 270 HU BUILDING 334 ROOF PLAN DEMOLITION
MPB301 MECHANICAL / PLUMBING FACILITY A 270 HU BUILDING 334 ROOF PLAN REMODEL
MPB302 PLUMBING FACILITY A 270 HU BUILDING 334 ROOF PLAN RAINWATER
EB201 FACILITY A 270 HU BUILDING 334 ROOF PLAN - DEMOLITION - ELECTRICAL
EB301 FACILITY A 270 HU BUILDING 334 ROOF PLAN - REMODEL - ELECTRICAL
270 HOUSING UNIT - BUILDINGS 346-347
AC201 270 HOUSING UNIT BUILDINGS 346 - 347 ROOF PLAN DEMOLITION
AC301 270 HOUSING UNIT BUILDINGS 346 - 347 ROOF PLAN REMODEL
AC501 270 HOUSING UNIT BUILDINGS 346 - 347 BUILDING EXTERIOR ELEVATIONS
AC601 270 HOUSING UNIT BUILDINGS 346 - 347 BUILDING SECTIONS
SC201 ROOF FRAMING PLAN - BLDG 346 & BLDG 347
MPC201 MECHANICAL / PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN DEMOLITION
MPC301 MECHANICAL / PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN REMODEL
MPC302 PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN RAINWATER
EC201 270 HU BUILDINGS 346 THRU 347 ROOF PLAN - DEMOLITION - ELECTRICAL
EC301 270 HU BUILDINGS 346 THRU 347 ROOF PLAN - REMODEL - ELECTRICAL
NONSTRUCTURAL PROVISIONS / BUILDING CODE ANALYSIS (SEE SHEET G.02)
ALL WORK SHALL COMPLY WITH AT LEAST THE MINIMUM STANDARDS
OF THE FOLLOWING PARTIAL LIST OF APPLICABLE CODES AS OF
JANUARY 1, 2020:
- 2022 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE
24 C.C.R.
- 2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R.
- 2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R.
- 2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R.
- 2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R.
- 2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R.
- 2022 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 C.C.R.
- 2022 CA GREEN BUILDING STANDARDS CODE (CAL GREEN), PART 11,
TITLE 24, C.C.R.
- 2022 CALIFORNIA REFERENCE STANDARDS, PART 12, TITLE 24
C.C.R.
- TITLE 19 C.C.R. PUBLIC SAFETY, STATE FIRE MARSHAL
REGULATIONS
- 2010 AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARDS:
- NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS, 2022
EDITION, CA AMENDED
- NFPA 14 INSTALLATION OF STANDPIPE SYSTEMS, 2019
EDITION, CA AMENDED
- NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2022
EDITION, CA AMENDED
- NFPA 101 LIFE SAFETY CODE, 2021 EDITION
- NFPA 110 EMERGENCY AND STANDBY POWER SYSTEMS,
2019 EDITION
- NFPA 170 STANDARD FOR FIRE SAFETY AND EMERGENCY
SYMBOLS, 2018 EDITION
THE ABOVE CODES AND REGULATIONS REFER TO THE LATEST
EDITION OR REVISION IN FORCE ON THE DATE OF THE CONTRACT,
UNLESS OTHERWISE STATED. NOTHING ON THE DRAWINGS IS TO BE
CONSTRUED AS REQUIRING OR PERMITTING WORK THAT IS
CONTRARY TO THE LISTED CODES AND REGULATIONS, OR OTHER
LOCAL, STATE OR FEDERAL CODES OR REGULATIONS WHICH MAY
BE APPLICABLE. SEE 2022 CBC, CHAPTER 35-REFERENCE
STANDARDS, FOR FULL LIST OF OSFM ADOPTED CODES AND
STANDARD.
SYMBOLS APPLICABLE CODES
FIRE AUTHORITY
· DESIGN CRITERIA GUIDELINES
(DCG)
LOCAL FIRE AUTHORITY IS
REQUIRED. LOS ANGELES
CALIFORNIA DEPARTMENT OF
CORRECTIONS AND
REHABILITATIONS (CDCR) IS THE
LOCAL DEPARTMENT.
A-000
DETAIL NUMBER
SHEET NUMBER
STRUCTURAL COLUMN
GRID LINES
REGULATIONS
CONCRETE
CONCRETE BLOCK
BATT INSULATION
RIGID INSULATION
GYPSUM BOARD WOOD FRAMING
WOOD BLOCKING
FINISH WOODMETAL
MATERIAL DESIGNATION
& AND
@ AT
℄ CENTERLINE
Ø DIAMETER
# POUND OR NUMBER
A/C AIR CONDITIONING
AC ASPHALTIC CONCRETE
ACOUS ACOUSTICAL
ACT ACOUSTIC CEILING TILE
ADD ADDITIONAL
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BITUM BITUMINOUS
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BTWN BETWEEN
BUR BUILT-UP ROOFING
CAB CABINET
CB CATCH BASIN
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CG CORNER GUARD
CJ CONTROL JOINT
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY
UNIT
CO CLEAN OUT
COL COLUMN
COMP COMPOSITION
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CORR CORRIDOR
CT CERAMIC TILE
CUST CUSTODIAN
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DG DETENTION-GRADE
DI DRAIN OR DROP INLET
DIA DIAMETER
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DIV DIVISION
DN DOWN
DS DOWNSPOUT
DTL DETAIL
DW DISHWASHER
DWG DRAWING
(E) EXISTING
E EAST
EA EACH
EF EXHAUST FAN
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
ENCL ENCLOSURE
EQ EQUAL
EQUIP EQUIPMENT
EVA EMERGENCY VEHICLE
ACCESS
EWC ELECTRICAL WATER
COOLER
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FLOOR
FIN FINISH
FLR FLOOR
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOS FACE OF STUD
FRP FIBERGLASS
REINFORCED PANEL
FT FOOT OR FEET
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GSM GALVANIZED SHEET
METAL
GYP GYPSUM
HB HOSE BIB
HC HOLLOW CORE
HD HEAD
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUNDS
LT LIGHT
MAX MAXIMUM
MB MACHINE BOLT
MDF MEDIUM DENSITY
FIREBOARD
MECH MECHANICAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MOD MODULAR
MTD MOUNTED
MTG MOUNTING
MTL METAL
MUL MULLION
(N) NEW
N NORTH
NIC NOT IN CONTRACT
NO or # NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O/ OVER
OC ON CENTER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED
OWNER INSTALLED
OPP OPPOSITE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PTD PAPER TOWEL
DISPENSER
PVC POLYVINYL CHLORIDE
(R) RELOCATE
RB RESILIENT OR RUBBER
BASE
RCP REFLECTED CEILING
PLAN
RD ROOF DRAIN
REF REFERENCE
REFR REFRIGERATOR
REINF REINFORCED
REQ REQUIRED
RF RESILIENT FLOORING
RM ROOM
RO ROUGH OPENING
RWL RAIN WATER LEADER
S SOUTH
SC SOLID CORE
SCD SEE CIVIL DRAWINGS
SCHED SCHEDULE
SD SOAP DISPENSER
SED SEE ELECTRICAL
DRAWINGS
SFPD SEE FIRE PROTECTION
DRAWINGS
SHT SHEET
SIM SIMILAR
SLD SEE LANDSCAPE
DRAWINGS
SMD SEE MECHANICAL
DRAWINGS
SMS SHEET METAL SCREW
SND SANITARY NAPKIN
DISPENSER
SPD SEE PLUMBING
DRAWINGS
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
SSD SEE STRUCTURAL
DRAWINGS
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPEND
TEL TELEPHONE
TEMP TEMPORARY
THK THICK
T.O. TOP OF
TOC TOP OF CURB
TOP TOP OF PARAPET
TOS TOP OF SLAB
TOW TOP OF WALL
TPD TOILET PAPER
DISPENSER
TV TELEVISION
TYP TYPICAL
UON UNLESS OTHERWISE
NOTED
VCT VINYL
COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
W WEST
w/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WH WATER HEATER
W
S
E
N
A-000
DETAIL NUMBER
SHEET NUMBER
D
012 KEYNOTE TAG
ABBREVIATIONS
W AVE J
W AVE I
T H
S T W
T H
S T W
DETAILS
A900 DETAILS
A901 DETAILS
A902 DETAILS
A903 DETAILS
A904 DETAILS
A905 DETAILS
A906 DETAILS
S301 SECTIONS
S501 TYPICAL DETAILS
MP501 MECHANICAL / PLUMBING DETAILS
MP502 MECHANICAL / PLUMBING DETAILS
MP801 MECHANICAL / PLUMBING PHOTOS
MP802 MECHANICAL / PLUMBING PHOTOS
E9.001 ELECTRICAL DETAILS
23-S-0001-C-PR
BLDG 331
BLDG 332
BLDG 333
BLDG 334
BLDG 335
BLDG 336
BLDG 337
BLDG 338
BLDG 339
BLDG 3310
BLDG 341
BLDG 342
BLDG 343
BLDG 344
BLDG 345
BLDG 346
BLDG 347
BLDG 348
BLDG 349
BLDG 3410
23-S-0002-C
23-S-0003-C
23-S-0004-C
23-S-0005-C
23-S-0006-C
23-S-0007-C
23-S-0008-C
23-S-0009-C
23-S-0010-C
23-S-0011-C
23-S-0012-C
23-S-0013-C
23-S-0014-C
23-S-0015-C
23-S-0016-C
23-S-0017-C
23-S-0018-C
23-S-0019-C
23-S-0020-C
23-S-0021-C
G0.1
P H
A S E
T
IT
L E S
H E E T
SHEET NUMBER
S
TA
TE
O
F C
A
LI
FO
R
N
IA
D E P A R
TM
E N
T O
F C
O R
R E C
TI
O
N S A
N D
R E H
A B
IL
IT
A
TI
O N
FA
C
IL
IT
Y P
LA
N
N
IN
G , C
O N
S
TR
U C
TI
O
N A
N D
M A N
A G
E M
E N
T D
IV
IS
IO
N
DE
SI
G N
SE
RV
IC
ES
A
ND
S
TA
ND
AR
DS
B
RA
NC
H
DE
SI
G
N
SE
RV
IC
ES
S
EC
TI
O N
APPROVAL
L A C
V1
C A L
IF
O R
N
IA
S T A T E P
R
IS
O N
L O
S A
N G
E L E S C
O U
N T Y
TH
S
T R
E E T , W
E S T
LA
N
C A S
TE
R , C
A
R E P L A C
E R
O O
F S
P H
A S E
A U
G U
S T
F
IN
A L D
R A W
IN
G
S
.1
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/10/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
23-0002
11/20/2023 CASp 491 #1317 x
File details come from the government source that posted it. Updated .