M702.pdf
PDF 943 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M702
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
BOILER #2
SBD
F
O R
F O
S
F O
R F
O S
NG
N G
N G
N.C.
VTR
R
N.C.
VTR
N.C. N.C.
CONDENSATE
TANK
TFD
VTR
DEAERATOR
75,000 LB/HR
MAKE-UP
WATER
CONTROL
BYPASS
VALVE
HIGH AND
LOW WATER
ALARMS
VENT
THROUGH
ROOF
PSR FROM
HIGH LINE
FLOW
METER
HARDNESS
MONITOR
TREATED
CONDENSATE
3" CONDENSATE
TANK OVERFLOW
SOFTENED
BOILER
MAKE-UP
TREATED
CONDENSATE
STEAM
CONTROL
VALVE
OVERFLOW
DRAIN
PRESSURE
TRANSMITTER
TO SIMENS
AUTOMATION
LOW PRESSURE
STEAM HEADER
STEAM PRESSURE
REGULATING
VALVES
12" HIGH
PRESSURE
STEAM
HEADER
PRESSURE
TRANSMITTER
BLOWDOWN HEAT
RECOVERY UNIT
FLOW
METER
WATER
METER
EXISTING
BACKFLOW
PREVENTERS
DOMESTIC
WATER
BOILER
BLOW-
DOWN
DEAERATOR
OVERFLOW
PRESSURE
TRANSMITTER
FEEDWATER
PUMP
DRAIN
CONN.
COLD
WATER TO...
TO
INDUSTRIAL
SEWER
CONDENSATE
POLISHER
N.C.
N.C.
CONDENSATE
PUMPS
SURGE TANK
VENT
LOW PRESSURE RETURNS
FROM BUILDING 7
STEAM
HEADER
ISOLATION
VALVES
STEAM
TREATMENT
SCALE
INHIBITOR CAUSTIC
OXYGEN
SCAVENGER
VTR
R
3/8" STAINLESS
STEEL TUBING
N.O.
FLOW
METER
CONDENSATE
WATER CONTROL
VALVE
BYPASS
ORIFICE
W/SHUT-OFF
VALVE
6"
N.O.
N.O.
NEEDLE
VALVE
QUICK OPEN
VALVE
SLOW
OPEN
VALVE
CONNECTION ON
MEZZANINE TO
EXISTING CAMPUS
STEAM RETURN.
PIPE IN EXISTING
TRAENCH
TO BLOW DOWN
SEPERATOR.
N.C.
VTR
1/2"
KLINGER
PLUG
VALVE
TO FLOOR
DRTAIN
MODULATING
FEED WATER
CONTROL
VALVE
DRAIN TO
BLOW DOWN
SEPERATOR
NON-RETURN
STEAM VALVE
SAMPLE
LINE TO
CHEMICAL
TREATMENT
SBD
PIPE IN
EXISTING
TRAENCH
EXISTING
WATER
SOFTENER
EXISTING
BACKFLOW
PREVENTER
3/8" STAINLESS
STEEL TUBING
3/8" STAINLESS
STEEL TUBING
QUICK OPEN
VALVE
DRAIN
VALVE
(TYP.
FOR 3)
RELIEF
VALVE
(TYP)
FOR 3
S
EXISTING
CONCRETE PAD
SURF.
BLOW
DOWN
CONTROL
VALVE
FIRST
STAGE
ENCONOMIZER
SECOND STAGE
ENCONOMIZER
460V/3Ø
BY
DIV.
120V/1Ø
POWER
BY
DIV.
LC
FM
FM
SURGE
TANK
CONTROL
PANEL W/
STARTER
LC
VA
MAKE-UP
WATER
CONTROL
VALVE
LEVEL
CONTROLLER
ADAC
PAKAGED
AUTOMATED
DEAERATOR
CONTROL
SYSTEM
VFD VFD VFD
FM
FM
VAC
EXISTING
BOILER #1
VAFLOW
METER
FM
N.O.
FLOW
METER
N.C.
N.C.
N.O. N.O. N.O.
N .C
N .C
N .C
BYPASS
FLOW
METER
FM
BOILERS
ISOLATION
VALVE
VTR
N.O.
N.C.
N.O.
T
T
TO
MASTER
BOILER
CONTROL
PANEL.
N.C.
S15
10"
8" BYPASS
8"
8"
DRAIN TO
TRENCH
VA
N.C.
BFW
EXISTING
BOILER
CONTROL
PANEL
VFD
VA VA
VA
T
FM
LC
T
N.C.
N.C.
N.C.
N.O.
N.C.
SBDSBD
1-1/2"1"
VA
FM
T
T
T
FM
FMFMFM
FM
FM
FM
FM
CONTROL WIRING, FURNISHED AND
INSTALLED BY ATC CONTRACTOR.
SR
P
V
V
V
S100S100
S100 S100S100S100
S100
N.O.
SBD SBD
NEEDLE
VALVE
QUICK OPEN
VALVE
SLOW
OPEN
VALVE
N.C.
VTR
1/2"
KLINGER
PLUG
VALVE
TO FLOOR
DRTAIN
MODULATING
FEED WATER
CONTROL
VALVE
DRAIN TO
BLOWDOWN
SEPERATOR
NON-RETURN
STEAM VALVE
SAMPLE LINE
TO CHEMICAL
TREATMENT
QUICK OPEN
VALVE
S
NEW
CONCRETE
PAD
SBD
SURF.
BLOW
DOWN
CONTROL
VALVE
FIRST
STAGE
ENCONOMIZER
SECOND
STAGE
ENCONOMIZER
KEYED NOTES:
MASTER
BOILER
CONTROL
PANEL
MBCS
EXISTING
BOILER
CONTROL
PANEL
VFD
460V/ 3Ø
BY
DIV.
120V/1Ø
POWER
BY DIV.
LOCATED IN
CONTROL
ROOM
120V/1Ø
MONITOR
IN CONTROL
ROOM
VAC
N.O.
N.O.
N.O.
N.C.
N.C.
VTR
N.O.
LC
TO ADAC
CONTROL
SYSTEM
DRAIN TO
TRENCH
GENERAL DEMOLITION NOTES:WIRING LEGEND
A. DEAREATOR AND SURGE TANK SYSTEM SEQUENCE OF OPERATION:
1. DEAERATOR MAKE-UP WATER CONTROL VALVE:
THE MAKE-UP WATER CONTROL VALVE IS MODULATED BY WATER LEVEL CONTROLLER
AT DEAERATOR AS REQUIRED TO MAINTAIN THE WATER LEVEL OF THE DEAERATOR AT
SETPOINT.
2. DEAREATOR STEAM VALVE:
THE DEAREATOR STEAM VALVE IS OF THE SELF-CONTAINED TYPE. THE VALVE IS
MODULATED AS REQUIRED TO MAINTAIN THE FEEDWATER TEMPERATURE IN THE
DEAREATING SECTION OF THE DEAREATOR AT SETPOINT. THE BOILER FEEDWATER
TEMPERATURE. FEEDWATER FLOW, AND FEEDWATER PRESSURE ARE MONITORED AND
CONTROLLED BY DEAREATOR ADAC SYSTEM.
B. BOILER FEEDWATER PUMPS:
1. BOILER FEEDWATER PUMPS ARE AUTOMATICALLY STARTED AND STOPPED BY
DEAREATOR ADAC CONTROL SYSTEM AND MODULATE THE SPEED OF PUMPS TO
MAINTAIN THE PRESSURE SETPOINT IN FEEDWATER MAIN TO BOILERS.
C. BOILER ECONOMIZER SEQUENCE OF OPERATION:
1. THE BOILER TWO-STAGE ECONOMIZERS SHALL BE PROVIDED WITH ECONOMIZER
CONTROL SYSTEM (ECS).
2. THE SURGE TANK LEVEL CONTROLLER OPENS CONDENSATE VALVE TO DEAREATOR AS
THE LEVEL IN THE SURGE TANK RISES.
3. DEAREATOR LEVEL CONTROLLER SIGNALS MAKE-UP WATER VALVE TO MAINTAIN LEVEL IN
THE DEAREATOR,SENDING MAKE-UP WATER THROUGH THE SECOND STAGE ECONOMIZER
AND INTO DEAREATOR.
4. IF THE SECOND STAGE ECONOMIZER OUTLET WATER TEMPERATURE RISES ABOVE
ADJUSTABLE SETPOINT, THE ECS SHALL SIGNAL THE MAKE-UP WATER BYPASS VALVE TO
ADD MORE COLD MAKE-UP WATER, MODULATES THE VALVE ON THE SECOND STAGE
ECONOMIZER WATER OUTLET TO DEAREATOR TANK. THE OVERFLOW FROM THE
DEAREARTOR SHALL BE ROUTED TO SURGE TANK.
5. THE BOILERS SHALL BE FURNISHED WITH BOILER CONTROL SYSTEM. SEE SPECIFICATION
SECTION 15610. THE BOILER CONTROL SYSTEM SHALL SIGNAL THE MODULATING
FEEDWATER VALVE FROM WATER LEVEL CONTROLLER TO MAINTAIN WATER LEVEL AT
THE BOILER. THE BOILER CONTROL SYSTEM SHALL CONTROL THE SPEED OF
COMBUSTION BLOWER AND PARALLEL POSITIONING AND O/2 TRIM TO CONTROL THE
COMBUSTION FOR THE BOILER.
6. THE FEED WATER FROM DEAREATOR SHALL FLOW THROUGH FIRST STAGE OF THE
ECONOMIZER BEFORE GOING THROUGH THE BOILER.
7. THE SURFACE BLOWDOWN (SBD) AT THE BOILER SHALL BE CONTINUOUS THROUGH
NEEDLE VALVE (NORMALLY OPEN). THE SBD CONTROLLER SHALL SIGNAL THE CONTROL
VALVE AND AS THE TDS LEVEL RISES TO SETPOINT LEVEL, THE SBD CONTROLLER SHALL
SIGNAL THE CONTROL VALVE TO OPEN AND DRAIN BLOWDOWN THROUGH BLOWDOWN
HEAT RECOVERY
EXISTING MAKE-UP WATER
THERMOCOUPLE TRANSMITTER.
NEW MAKE-UP WATER THERMOCOUPLE
TRANSMITTER.
EXISITNG MASTER BOILER CONTROL
SYSTEM PANEL.
NEW FLOW BALANCING, MODULATING
SIGNAL FULL PORT, S.S. VALVE, 120V/1�
POWER, FURNISHED BY BOILER
MANUFACTURER, INSTALLED BY ATC
CONTRACTOR.
NEW FEED WATER THERMOCOUPLE
TRANSMITTER, FURNISHED BY BOILER
MANUFACTURER, INSTALLED BY ATC
CONTRACTOR.
NEW FLUE GAS THERMOCOUPLE
TRANSMITTER, FURNISHED BY BOILER
MANUFACTURER, INSTALLED BY ATC
CONTRACTOR.
NOT USED
NOT USED
EXISTING FLOW METER CONNECTED TO
MBCS.
NOT USED
NEW LEVEL CONTROL PROVIDED WITH
BOILER CONTROL SYSTEM, INSTALLED BY
ATC CONTRACTOR.
NEW MODULATING FEED WATER VALVE, 24-
VAC. FURNISHED WITH BOILER AND
INSTALLED BY ATC CONTRACTOR.
NOT USED
NOT USED
EXISTING WORKSTATION.
NEW HIGH PRESSURE NATURAL GAS PIPE.
REFER TO PLANS FOR ROUTING..
PRESSURE TRANSMITTER.
NEW FLOW METER FOR BOILER FEED
WATER.
NOT USED.
NOT USED.
NEW FLOW METER FURNISHED BY BOILER
MANUFACTURER, INSTALLED BY ACT
CONTRACTOR.
TO EXISTING MBCS.
REFER TO FUEL OIL PIPING DIAGRAM ON
SHEET M401.
ROUTE CONTROL WIRING TO EXISTING
MBCS.
NEW STEAM FLOW METER.
ALL NEW AND EXISTING BOILER CONTROL
PANELS SHALL BE PROVIDED WITH NEMA 4X
ENCLOSURE.
22 22
22 22
S100 TO
CAMPUS
NEW
BOILER #3
F O
R F
O S
N G
VA
FM
T
T
T
FM
FM
FM
N.O.
SBD
NEEDLE
VALVE
QUICK OPEN
VALVE
SLOW
OPEN
VALVE
N.C.
VTR
1/2"
KLINGER
PLUG
VALVE
TO FLOOR
DRTAIN
MODULATING
FEED WATER
CONTROL
VALVE
DRAIN TO
BLOWDOWN
SEPERATOR
NON-RETURN
STEAM VALVE
SAMPLE LINE
TO CHEMICAL
TREATMENT
QUICK OPEN
VALVE
S
SBD
SURF.
BLOW
DOWN
CONTROL
VALVE
FIRST
STAGE
ENCONOMIZER
SECOND
STAGE
ENCONOMIZER
NEW
BOILER
CONTROL
PANEL
VFD
460V/3Ø
BY DIV.
120V/1Ø
POWER
BY DIV.
VAC
N.O.
N.O.
N.O.
N.C.
N.C.
VTR
N.O.
LC
DRAIN TO
TRENCH
24 24
T
T
T
VA
T
T
T
T
T
T T
T
T
VA
DA-FM-1
Item 9
DA-PT-1
DA-MUV-1
Item 8
DA-LC-1
Item 1
DA-PT-2
PRV-1
Item 14
TT-3
Item 2
TT-4
Item 2
DA-MUV-2
MUV-1
Item 7
FM-5
FM-4
Item 9
FM-2
Item 9
CT-FM-1
Item 9
CT-LC-1
Item 1
CT-LA-1
and 2
FM-3
Item 9
TT-1
PT-P-1
B1-CV-1
B1-TT-6
B1-TT-5
B1-TT-7B1-TT-2
B1-TT-1
B1-LC-1
B1-FM-1
B1-MUV-1
B1-FM-2
B1-FM-3
B1-TT-4
B1-FM-3
Item 9
B2-FM-2
B2-FM-3
B2-FM-1
B2-LC-1
Item 11
B2-MUV-1
Item 12
B2-TT-4
Item 5
B2-FM-3
Item 21
B2-TT-6
Item 2
B2-CV-1
Item 4
B2-TT-5
Item 5
B2-TT-7
Item 2
B2-TT-1
B2-TT-2
Item 17
PT-2
Item 18
FM-1
Item 9
PT-1
Item 18
FINISHED FLOOR
FINISHED
FLOOR
TRENCH
NEW
CONCRETE
PAD
1. ATC CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL CONTROL WIRING AS SHOWN ON
THIS DRAWING.
2. ATC CONTRACTOR SHALL COORDINATE
ALL WORK WITH BOILER MANUFACTURER
FOR NEW CONTROLS FOR BOILER #2 AND
REWIRING EXISTING DEVICES TO NEW MBCS.
3. BOILER MANUFACTURER SHALL PROVIDE
NEW FUEL OIL FLOW METER, NATURAL GAS
FLOW METER, AND STEAM FLOW
METER FOR EXISTING FIRE TUBE BOILER.
FM
B3-FM-2
B3-FM-3
B3-FM-1
B3-LC-1
Item 11
B3-MUV-1
Item 12
B3-TT-4
Item 5
B3-FM-3
Item 21
B3-TT-6
Item 2
B3-CV-1
Item 4
B3-TT-5
Item 5
B3-TT-7
Item 2
B3-TT-1
B3-TT-2
Item 17
262626
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M702
CONTROLS - MECHANICAL
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
NOT TO SCALE
NEW AND EXISTING FIRE TUBE STEAM BOILERS CONTROL DIAGRAM
File details come from the government source that posted it. Updated .