E201.pdf
PDF 649 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
E201
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONNECT NEW
BOILER TO MDP 7-1.
1. CONNECT NEW BOILER #3 POWER AND CONTROLS TO MDP. SINGLE POINT
ELECTRICAL CONNECTION FOR 75HP FAN MOTOR (WITH DRIVE), 7.5HP AIR COMPRESSOR
MOTOR AND 1HP OIL PUMP MOTOR. SEE ONE-LINE DIAGRAM FOR BREAKER AND WIRE SIZES.
2. EXISTING BOILER #1 AND #2 TO REMAIN.
3. MOTORIZED CONTROL VALVES FOR NATURAL GAS LINE. 120V. VERIFY EXACT LOCATION
WITH MECH.
4. MOTORIZED CONTROL VALVE FOR BOILER. 120V. VERIFY EXACT LOCATION WITH MECH.
5. FLOW METER FOR BOILER. 120V. VERIFY EXACT LOCATION WITH MECH.
6. NEW GENERATOR ON EXISTING CONCRETE PAD.
7. THE FOLLOWING ITEMS NEED TO BE EXTENDED FOR NEW GENERATOR: REMOTE START, BLOCK
HEATER, BATTERY CHARGER. EXTENT CONDUITS AND PULL NEW WIRE. VERIFY BLOCK HEATER
WIRE SIZE.
8. NEW GROUND ROD,
9. PATCH CONCRETE TO MATCH EXISTING.
10. SAW CUT AND EXTND CONDUITS TO NEW GENERATOR WINDOW LOCATION. PULL NEW
CONDUCTORS AS SHOW ON ONE LINE DIAGRAM TO NEW GENERATOR LUGS.
11. TEMPORARY BOILER DISCONNECT (COORDINATE WITH MECHANICAL) SEE ONE-LINE.
TO
ABOVE
"NL-7-1A" -
4 3.4
2.4 1.4 1
H
E
D
B
A
KEYED NOTES:
UH-1
TO ABOVE
9 10
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
E201
BOILER #3 INSTALLATION -
FIRST FLOOR PLAN -
ELECTRICAL NEW
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
1/4" = 1’−0"
BOILER #3 INSTALLATION − FIRST FLOOR PLAN − ELECTRICAL NEW
GENERAL NOTE:
CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO
BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.
File details come from the government source that posted it. Updated .