M204.pdf
PDF 386 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M204
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4 3.4
2.4 1.4 1
H
E
D
B
A
KEYED NOTES:
1 FILL IN EXISTING FLOOR OPENINGS IN FAN
PLATFORM. REFER TO STRUCTURAL PLANS FOR
DETAILS.
NEW 24"Ø BOILER STACK DOWN TO NEW FIRE
TUBE BOILER #3 ( B-3 ).
EXISTING 24"Ø BOILER STACK DOWN TO
EXISTING FIRE TUBE BOILER.
6" V
6" VTR
DA-1
2 3
4" S100
4" S15
8" S154" S100 8" S15
1" SR
1" S15
1" D
3" PCR
1" D1" D
6" BFW
4" SCW
1" D
4" SCW
4" PCR
2" SR
2" BFW
8" S15
"ø
"ø
24"ø
4" S100
1" SR
1" D 1" D1" D
1" D
ADDITIVE OPTIONS
OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION #2
OPTION #3
OPTION #4
REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION #5
OPTION #6
REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.
NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.
NEW EMERGENCY GENERARTOR.
OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M204
BOILER 3 INSTALLATION - FAN
PLATFORM - MECHANICAL
NEW
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
1/4" = 1’−0"
BOILER 3 INSTALLATION − FAN PLATFORM PLAN − MECHANICAL NEW
GENERAL NOTE:
CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO
BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.
File details come from the government source that posted it. Updated .