M306.pdf

PDF 3 MB Posted

Attached to
Boiler #3 Replacement
Solicitation number
14-223-SOL-00059
Issued by

About this file

M306

View the file

Other files

File Type Posted
Amendment_1.pdf PDF
M701.pdf PDF
M305.pdf PDF
M601.pdf PDF
M401.pdf PDF
S102.pdf PDF
M303.pdf PDF
E401.pdf PDF
M201.pdf PDF
S101.pdf PDF
M301.pdf PDF
M702.pdf PDF
M200.pdf PDF
E201.pdf PDF
M102.pdf PDF
E202.pdf PDF
Solicitation_14-223-SOL-00059.pdf PDF
M204.pdf PDF
Attachment_J-3_General_Decision_Number_AR140125.pdf PDF
G100.pdf PDF
M307.pdf PDF
M100.pdf PDF
Attachment_J-2_Drawings.pdf PDF
M203.pdf PDF
E102.pdf PDF
M202.pdf PDF
M501.pdf PDF
M302.pdf PDF
M101.pdf PDF
M104.pdf PDF
Attachment_J-4_FDA_Form_3391.pdf PDF
M304.pdf PDF
M103.pdf PDF
Attachment_J-1_Specifications.pdf PDF
M402.pdf PDF
E301.pdf PDF
M403.pdf PDF
E101.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

M306

BOILER #3 INSTALLATION -

HVAC PIPING RISER

DEMOLITION

03-24-14

01-13-0018

B ui ld in g

B oi le r #3

R ep la ce m en t Je ffe rs on L ab or at or ie s

F oo d an d D ru g

A dm in is tr at io n

N C

T R

R d

Je ffe rs on

, A R

CONSTRUCTION

DOCUMENT

BOILER #3 INSTALLATION − HVAC PIPING RISER − MECHANICAL DEMOLITION

DEMOLITION KEYED NOTES:

EXISTING FANS AND ASSOICATED EQUIPMENT TO

BE REMOVED UNDER BOILER #3 INSTALLATION.

EXISTING WATER TUBE BOILER #1 AND ASSOCIATED

EQUIPMENT TO BE REMOVED UNDER BOILER #3

INSTALLATION.

EXISTING WATER TUBE BOILER #1 CONTROL PANEL

TO BE REMOVED UNDER BOILER #3 INSTALLATION.

File details come from the government source that posted it. Updated .