M201.pdf

PDF 868 KB Posted

Attached to
Boiler #3 Replacement
Solicitation number
14-223-SOL-00059
Issued by

About this file

M201

View the file

Other files

File Type Posted
Amendment_1.pdf PDF
M303.pdf PDF
M200.pdf PDF
M306.pdf PDF
M501.pdf PDF
S102.pdf PDF
M702.pdf PDF
G100.pdf PDF
M307.pdf PDF
M203.pdf PDF
E102.pdf PDF
Attachment_J-2_Drawings.pdf PDF
M202.pdf PDF
M302.pdf PDF
M304.pdf PDF
Attachment_J-4_FDA_Form_3391.pdf PDF
M401.pdf PDF
M701.pdf PDF
E301.pdf PDF
M403.pdf PDF
M402.pdf PDF
M103.pdf PDF
Attachment_J-1_Specifications.pdf PDF
E101.pdf PDF
M305.pdf PDF
M601.pdf PDF
E401.pdf PDF
S101.pdf PDF
M301.pdf PDF
M102.pdf PDF
E201.pdf PDF
E202.pdf PDF
Solicitation_14-223-SOL-00059.pdf PDF
M204.pdf PDF
Attachment_J-3_General_Decision_Number_AR140125.pdf PDF
M100.pdf PDF
M101.pdf PDF
M104.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW FIRE

TUBE BOILER

#3 (B-3) TO BE

INSTALLED

EXISTING

FIRE TUBE

BOILER #2

EXISTING

FIRE TUBE

BOILER #1

EXISTING

AIR

COMPRESSOR

EXISTING

AIR

STORAGE

TANK

EXISTING

CHEMICAL

TREATMENT

CPS-1

BDHX-1

BS-1

EXISTING 2" FUEL

OIL PIPING FOS/FOR

CST-1

FOS-1

4 3.4

2.4 1.4

H

E

D

B

A

M301

M303

KEYED NOTES:

NEW FIRE TUBE BOILER #3 INSTALLED UNDER BOILER 3

INSTALLATION.

EXISTING BOILER STRUCTURAL SUPPORT COLUMN

/PLATFORM SUPPORT COLUMN TO REMAIN. PROTECT

DURING BOILER DEMOLITION.

NEW LOUVER . EXACT LOUVER SIZE SHALL BE FIELD

VERIFIED. REFER TO SPECIFICATION FOR MORE

INFORMATION ON LOUVER. EXISTING LOUVERS AND GLASS

REMOVED SHALL BE RETURNED TO NCTR.

NEW ISOLATION VALVE AND BLOW DOWN PIPE FROM NEW

FIRE TUBE BOILER #3 ( B-3 ) TO EXISTING BLOW DOWN HEAT

EXCHANGER BDHX-1.

NEW BOILER CONTROL PANEL.

FUEL OIL CIRCULATION TANK.

8" STEAM PIPING UP TO NEW STEAM HEADER ON SECOND

FLOOR. PROVIDE FACTORY TESTED ASME CERTIFIED NON-

RETURN VALVE ASSEMBLY.

24" BOILER FLUE UP TO NEW 2-STAGE ECONOMIZER.

PROVIDE ALL REQUIRED TRANSITIONS FROM FLUE TO

ECONOMIZER. REFER TO STRUCTURAL PLANS FOR

STRUCTURAL SUPPORT DETAILS FOR ECONOMIZER.

NEW 1" DRAIN PIPING DOWN TO TRENCH.

NEW WATER SOFTENER SYSTEM. THIS IS ADDITIVE

OPTION #5.

PROVIDE A BLIND FLANGE FOR TEMPORARY BOILER.

CONNECTION AT 4'-0" A.F.F.

PROVIDE ISOLATION VALVE IN VERTICAL.

ROUTE 1" FUEL OIL SUPPLY/ RETURN PIPE AT 4'-0" A.F.F. FOR

CONNECTION TO TEMPORARY BOILER.

ROUTE 4" BOILER FEEDWATER AT 4'-0" A.F.F. FOR

CONNECTION TO TEMPORARY BOILER.

PROVIDE BLIND FLANGE FOR TEMPORARY BOILER

CONNECTION. INSTALL 6" S100 PIPE AT 4'-0" A.F.F.

PROVIDE GATE VALVE ON VERTICAL PIPE.

NEW GENERATOR WITH MANUALLY FILLED FUEL OIL BELLY

DAY TANK.

NEW ISOLATION VALVE FOR NEW WATER SOFTENER.

1" DCW

EXISTING

4" DCW

EXISTING 6" SR

EXISTING

4" SCW

4" DCW

EXISTING

EXISTING

6" NG

EXISTING

EXISTING

EXISTING

6" NG

EXISTING

3" BO

EXISTING

6" SR

NEW WATER

SOFTNER

TANK

1" BD

1" BD 3/4" FOS

3/4" FOR

3/4" FOS

3/4" FOR1" BD

2" D

3" BFW

3" NG

3" NG

3" BD

1" D

1" D 1" D

4" PCR

4" SR

4" SR

4" SR

2" BD

3" NG 2" D

3" BD

1" BD

3" BFW

2" BD

3" NG

8" S1008" S100

UP

3" BD

4" V1" DCW

6" V

2" D

M302

M301

B-31

FOP-3

NEW

EXISTING

FOP-2

EXISTING

FOP-1

EXISTING BLOW

DOWN

RECOVERY

2" BD

NEW WATER

SOFTNER

TANK

NEW BRINE

TANK

10 10

UH-1

3/4" S15

3/4" SR

1" SR

3/4" S15

3/4" SR

1" DCW

1" DCW

3" NG

6" S100

6" BFW

1" FOS

1" FOR

GENERAL NOTE:

1. WATER SOFTENER PIPING NOT PROVIDED. CONTRACTOR

SHALL PIPE WITH BY-PASS IN CASE OF SOFTENER FAILURE.

2. UPGRADE BOILER SIGHT GLASS TO TYCO PENBERTHY FLAT

GLASS GAUGES SERIES M FOR NEW AND EXISTING BOILERS.

2" D

TFD

EXISTING

CONCRTE

PAD

EXISTING

CONCRTE

PAD

WATER SOFTENER

BYPASS VALVE

ADDITIVE OPTIONS

OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION #2

OPTION #3

OPTION #4

REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION #5

OPTION #6

REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.

NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.

NEW EMERGENCY GENERARTOR.

OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

M201

BOILER #3 INSTALLATION -

FIRST FLOOR PLAN -

MECHANICAL NEW

03-24-14

01-13-0018

B ui ld in g

B oi le r #3

R ep la ce m en t Je ffe rs on L ab or at or ie s

F oo d an d D ru g

A dm in is tr at io n

N C

T R

R d

Je ffe rs on

, A R

CONSTRUCTION

DOCUMENT

1/4" = 1’−0"

BOILER 3 INSTALLATION − FIRST FLOOR PLAN − MECHANICAL NEW

GENERAL NOTE:

CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO

BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.

File details come from the government source that posted it. Updated .