M201.pdf
PDF 868 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M201
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW FIRE
TUBE BOILER
#3 (B-3) TO BE
INSTALLED
EXISTING
FIRE TUBE
BOILER #2
EXISTING
FIRE TUBE
BOILER #1
EXISTING
AIR
COMPRESSOR
EXISTING
AIR
STORAGE
TANK
EXISTING
CHEMICAL
TREATMENT
CPS-1
BDHX-1
BS-1
EXISTING 2" FUEL
OIL PIPING FOS/FOR
CST-1
FOS-1
4 3.4
2.4 1.4
H
E
D
B
A
M301
M303
KEYED NOTES:
NEW FIRE TUBE BOILER #3 INSTALLED UNDER BOILER 3
INSTALLATION.
EXISTING BOILER STRUCTURAL SUPPORT COLUMN
/PLATFORM SUPPORT COLUMN TO REMAIN. PROTECT
DURING BOILER DEMOLITION.
NEW LOUVER . EXACT LOUVER SIZE SHALL BE FIELD
VERIFIED. REFER TO SPECIFICATION FOR MORE
INFORMATION ON LOUVER. EXISTING LOUVERS AND GLASS
REMOVED SHALL BE RETURNED TO NCTR.
NEW ISOLATION VALVE AND BLOW DOWN PIPE FROM NEW
FIRE TUBE BOILER #3 ( B-3 ) TO EXISTING BLOW DOWN HEAT
EXCHANGER BDHX-1.
NEW BOILER CONTROL PANEL.
FUEL OIL CIRCULATION TANK.
8" STEAM PIPING UP TO NEW STEAM HEADER ON SECOND
FLOOR. PROVIDE FACTORY TESTED ASME CERTIFIED NON-
RETURN VALVE ASSEMBLY.
24" BOILER FLUE UP TO NEW 2-STAGE ECONOMIZER.
PROVIDE ALL REQUIRED TRANSITIONS FROM FLUE TO
ECONOMIZER. REFER TO STRUCTURAL PLANS FOR
STRUCTURAL SUPPORT DETAILS FOR ECONOMIZER.
NEW 1" DRAIN PIPING DOWN TO TRENCH.
NEW WATER SOFTENER SYSTEM. THIS IS ADDITIVE
OPTION #5.
PROVIDE A BLIND FLANGE FOR TEMPORARY BOILER.
CONNECTION AT 4'-0" A.F.F.
PROVIDE ISOLATION VALVE IN VERTICAL.
ROUTE 1" FUEL OIL SUPPLY/ RETURN PIPE AT 4'-0" A.F.F. FOR
CONNECTION TO TEMPORARY BOILER.
ROUTE 4" BOILER FEEDWATER AT 4'-0" A.F.F. FOR
CONNECTION TO TEMPORARY BOILER.
PROVIDE BLIND FLANGE FOR TEMPORARY BOILER
CONNECTION. INSTALL 6" S100 PIPE AT 4'-0" A.F.F.
PROVIDE GATE VALVE ON VERTICAL PIPE.
NEW GENERATOR WITH MANUALLY FILLED FUEL OIL BELLY
DAY TANK.
NEW ISOLATION VALVE FOR NEW WATER SOFTENER.
1" DCW
EXISTING
4" DCW
EXISTING 6" SR
EXISTING
4" SCW
4" DCW
EXISTING
EXISTING
6" NG
EXISTING
EXISTING
EXISTING
6" NG
EXISTING
3" BO
EXISTING
6" SR
NEW WATER
SOFTNER
TANK
1" BD
1" BD 3/4" FOS
3/4" FOR
3/4" FOS
3/4" FOR1" BD
2" D
3" BFW
3" NG
3" NG
3" BD
1" D
1" D 1" D
4" PCR
4" SR
4" SR
4" SR
2" BD
3" NG 2" D
3" BD
1" BD
3" BFW
2" BD
3" NG
8" S1008" S100
UP
3" BD
4" V1" DCW
6" V
2" D
M302
M301
B-31
FOP-3
NEW
EXISTING
FOP-2
EXISTING
FOP-1
EXISTING BLOW
DOWN
RECOVERY
2" BD
NEW WATER
SOFTNER
TANK
NEW BRINE
TANK
10 10
UH-1
3/4" S15
3/4" SR
1" SR
3/4" S15
3/4" SR
1" DCW
1" DCW
3" NG
6" S100
6" BFW
1" FOS
1" FOR
GENERAL NOTE:
1. WATER SOFTENER PIPING NOT PROVIDED. CONTRACTOR
SHALL PIPE WITH BY-PASS IN CASE OF SOFTENER FAILURE.
2. UPGRADE BOILER SIGHT GLASS TO TYCO PENBERTHY FLAT
GLASS GAUGES SERIES M FOR NEW AND EXISTING BOILERS.
2" D
TFD
EXISTING
CONCRTE
PAD
EXISTING
CONCRTE
PAD
WATER SOFTENER
BYPASS VALVE
ADDITIVE OPTIONS
OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION #2
OPTION #3
OPTION #4
REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION #5
OPTION #6
REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.
NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.
NEW EMERGENCY GENERARTOR.
OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M201
BOILER #3 INSTALLATION -
FIRST FLOOR PLAN -
MECHANICAL NEW
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
1/4" = 1’−0"
BOILER 3 INSTALLATION − FIRST FLOOR PLAN − MECHANICAL NEW
GENERAL NOTE:
CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO
BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.
File details come from the government source that posted it. Updated .