Attachment_J-1_Specifications.pdf
PDF 3 MB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
Attachment J-1 Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J-1
Specifications, Building 7- Boiler #3 Replacement, Jefferson Laboratories, dated March 24, 2014, Project No. 01-13-0018
(245 Pages)
PROJECT MANUAL
Building 7 – Boiler #3 Replacement
Jefferson Laboratories
Food and Drug Administration
3900 NCTR Road Jefferson, Arkansas
March 24, 2014
TME Project No. 01-13-0018
5800 Evergreen Drive Little Rock, Arkansas 72205
Telephone (501) 666-6776 Fax (501) 663-8888 E-Mail: tme@tmecorp.com
Building 7 – Boiler #3 Replacement Jefferson Laboratories
Jefferson, Arkansas
TME Project # 01-13-0018
March 1, 2013
TABLE OF CONTENTS
DIVISION 0 – BIDDING AND CONTRACT DOCUMENTS
Not Applicable
DIVISION 1 – GENERAL REQUIREMENTS
Section 01010 Summary of Work Section 01300 Submittals and Substitutions Section 01500 Construction Facilities and Temporary Controls Section 01900 Alteration Procedures
DIVISION 2 – SITE CONSTRUCTION
Section 02070 Selective Demolition Section 02410 Traditional Asbestos Abatement Section 02511 Asphaltic Concrete Paving
DIVISION 3 – CONCRETE
Section 03310 Concrete Work
DIVISION 4 – MASONRY
Section 04100 Mortar and Masonry Grout Section 04200 Unit Masonry
DIVISION 5 – METALS
Section 05120 Structural Steel Section 05500 Miscellaneous Metal Work
DIVISION 6 – WOOD AND PLASTICS
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
Section 07900 Joint Sealants
DIVISION 8 – DOORS AND WINDOWS
DIVISION 9 – FINISHES
Section 09900 Painting
DIVISION 10 – SPECIALTIES
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 – SPECIAL CONSTRUCTION
DIVISION 14 – CONVEYING SYSTEMS
DIVISION 15 – MECHANICAL
Section 15000 Supplementary Mechanical General Conditions Section 15060 Pipe and Pipe Fittings Section 15090 Supports, Anchors, and Seals Section 15100 Valves and Specialties Section 15191 Facility Fuel Oil Piping Section 15200 Noise, Vibration, and Expansion Control Section 15250 Mechanical Systems Insulation Section 15610 Steam Boiler Section 15900 Automatic Temperature Controls
DIVISION 16 – ELECTRICAL
Section 16010 Basic Electrical Requirements Section 16047 Electrical Demolition Section 16055 Overcurrent Protective Devise Selective Coordination Short Circuit and Arc Flash Studies Section 16070 Electrical Connections for Equipment Section 16075 Electrical Identification Section 16110 Raceways Section 16120 Wires and Cables Section 16135 Electrical Boxes and Fittings Section 16170 Motor and Circuit Disconnects
Section 16326 350KW Engine Generator Section 16452 Grounding and Ground-Fault Protection Section 16880 Seismic Restraint for Electrical and Conduit
01010 - 1
SECTION 01010 - SUMMARY OF WORK
PART 1 - GENERAL
1.01 WORK UNDER THIS CONTRACT:
A. This project includes replacing of existing water tube boiler #3 with new fire tube boiler with master Boiler control system. The scope of work also includes removal of the existing gas & feed water piping, asbestos abatement of existing water tube boiler, structural steel and electrical provision for new boiler.
B. Refer to the drawings for more details. The demolition of the existing boiler will not start until the scheduled cold shut down of the Boiler Plant.
C. Options include: (1) Remove abandoned DA Tank and all associated piping; (2) Remove abandoned feedwater pumps and associated piping including equipment pads; (3) Remove abandoned feedwater piping in trench; (4) Replace all steam unit heaters and all S15 steam piping feeding new new steam unit heaters; (5) Replace water softener system complete with piping and controls; (6) Replace Emergency Diesel Generator; (7) Add new piping connections for emergency temporary boiler.
1.02 RESPONSIBILITIES OF CONTRACTOR: Except as otherwise specifically stated in the contract, the Contractor shall provide and pay for all materials, labor, tools, equipment, transportation, supervision, temporary construction of every nature, fees, taxes legally collectible because of the work and all other services and facilities of every nature whatsoever necessary to execute the work to be done as shown and/or specified under the contract and deliver it complete and in every respect within the specified time. The Contractor will include in his price the listed cost of these items and will be responsible for purchasing the specific equipment from the listed source.
1.03 CONSTRUCTION DRAWINGS AND SPECIFICATIONS: The COR/CO will furnish one electronic copy of contract drawings and specifications, without cost, to the Prime Contractor for his use in constructing the work. The Prime Contractor is to supply all contract drawings and specifications to the subcontractors or material suppliers.
1.04 COORDINATION: Provide administrative and supervisory requirements necessary for coordination of work, including meetings, administrative and supervisory personnel, survey, records, reports, use of site limitations, installation provisions, cutting and patching, cleaning, protection, conservation and salvage. The prime contractor shall furnish a superintendent to be on the job site whenever work is being performed. The superintendent shall serve as a liaison between the contractor, the subcontractors, the COR/CO and the Owner’s personnel. The superintendent will be required to be present any time work is being done. Coordinate storage of materials and equipment with the COR/CO and the Physical Plant Director.
1.05 BUILDING OCCUPANCY: During the Contract Period, the building will be occupied. Cooperate fully with the Owner during construction operations to minimize conflicts and to facilitate the Owner’s personnel’s usage. Do not unreasonably obstruct, or interfere with, any phase of the Owner’s personnel’s
01010 - 2 operations. Make any changes in or alterations to existing facilities, including utility service, without disrupting continuous use by the Owner. Any shutdowns of services to any building will require 2 week’s written notice to the Physical Plant Director and COR/CO.
1.06 WORK SCHEDULE: Work will start within 5 days of Notice to Proceed and must continue without delay until completion. The start of work must be coordinated with the Owner. CONTRACTOR USE OF PREMISES:
A. Limit use of premises to work indicated, allowing for Owner occupancy and public use when required.
B. Keep existing driveways and entrances serving premises clear and available to the Owner’s employees at all times. Do not use these areas for parking or storage of materials.
C. Do not unreasonably encumber site with materials or equipment. Confine stockpiling of materials and location of storage to areas in the building, to be assigned during the course of the project. The Contractor’s field office will be located at a site adjacent to the building, directed by the Physical Plant Director. If additional storage is necessary, obtain and pay for storage off site.
D. Contractor Use of Existing Building: Maintain existing buildings in safe and weather-tight condition throughout construction period. Repair any damage on property caused by construction operations. Take precautions necessary to protect building and building occupants during construction period.
E. Lock automotive type vehicles, such as passenger cars and trucks and other mechanized or motorized construction equipment, when parked and unattended, to prevent unauthorized use. Do not leave vehicles or equipment unattended with motor running or ignition key in place.
F. Smoking will not be permitted within the building.
G. Upon completion of the project the Contractor will be required to repair any portion of the facility damaged by the construction process at no expense to the Physical Plant Director.
1.07 INDUSTRY STANDARDS:
A. Applicability of Standards: Except where more explicit or stringent requirements are written into the contract documents, applicable construction industry standards have the same force and effect as if bound into or copies directly into the contract documents. Such industry standards are made a part of the contract documents by reference.
Individual specification sections indicate which codes and standards the Contractor must keep available at project site for reference.
B. Publication Dates: Except as otherwise indicated, where compliance with an industry standard is required, comply with standard in effect as of date of contract documents.
C. Conflicting Requirements: Where compliance with 2 or more standards is specified, and where these standards establish different or conflicting
01010 - 3 requirements for minimum quantities or quality levels, the most stringent requirement will be enforced, unless the contract documents specifically indicate otherwise. Refer requirements that are different, but apparently equal, and uncertainties as to which quality level is more stringent to the COR/CO for a decision before proceeding.
D. Copies of Standards: The Contract Documents require that each entity performing work be experienced in that part of the work being performed.
Each entity is also required to be familiar with industry standards applicable to that part of the work. Copies of applicable standards are not bound with the contract documents. Where copies of standards are needed for proper performance of the work, the Contractor is required to obtain such copies directly from the publication source.
E. Abbreviations and Names: Trade association names and title of general standards are frequently abbreviated. Where acronyms or abbreviations are used in the specifications or other contract documents they are defined to mean the recognized name of the trade association, Standards generating organization, governing authority or other entity applicable to the context of the text provisions.
1.08 PROJECT MEETINGS: The Contractor shall schedule and hold regular progress meetings to coordinate, expedite, and schedule work of contracts. Hold additional meetings as progress of work dictates or when requested by the Physical Plant Director or the COR/CO. Send written notice of meeting date, time and place, and agenda of meeting to the Physical Plant Director, COR/CO, separate contractors, subcontractors and others as pertinent to the agenda.
Record results of meetings and distribute copies to everyone in attendance and to others affected by the decisions or actions resulting from each meeting.
PART 2 PRODUCTS
Not Applicable
PART 3 EXECUTION
END OF SECTION
01300 - 1
SECTION 01300 - SUBMITTALS AND SUBSTITUTIONS
PART 1 - GENERAL
1.01 SCOPE: Provide all submittals, including shop drawings, product data, samples, schedules and requests for substitutions as required by the bidding and Contract Documents in strict accordance with the provisions of this section.
1.02 RELATED WORK
A. Contractual Requirements for Submittals: General Conditions and Supplementary Conditions.
B. Detailed Individual Submittals: Required are covered in pertinent sections of these specifications.
PART 2 - PRODUCTS
2.01 SUBSTITUTIONS
A. The naming of specified items on the drawings or in the specifications means that such named items are specifically desired by the COR/CO and/or the Owner. The listed acceptable manufacturers may be submitted.
Contractor is responsible to meet every aspect of specification for equipment. As the result of substitution, any modification to the Boiler Room layout or any modification to existing boiler, DA tank, surge tank, and economizer control systems to meet the design intent is the full responsibility of the Contractor.
B. Complete data must be submitted after award of contract on proposed substitutions. Submit samples for comparison and test where requested.
C. The COR/CO, after consultation with the Owner, will be the sole judge as to the equality and acceptability of proposed substitutions. ONLY
WRITTEN ACCEPTANCES WILL BE HELD VALID BY THE COR/CO.
D. Unless otherwise specified in individual sections, submit proposals for substitution within 7 days after award of contract.
E. If any substitution will affect a correlated function, adjacent construction, or the work of other trades or Contractors, the necessary changes and modifications to the affected work will be considered as part of the substitution, to be accomplished without additional cost to the Owner, if and when accepted.
F. Under no circumstances shall the COR/CO’s acceptance of any such substitution relieve the Contractor from timely, full and proper performance of the work.
2.02 SHOP DRAWINGS
A. Submit required shop drawings drawn to a scale sufficiently large to show all pertinent features of the item and its method of connection to the work.
Submit related shop drawings together, partial submittals will not be accepted. Provide manufacturer’s name and model number of prefabricated items and indicated methods of attachment and clearances required relative to other trades affecting all elements of the work. Identify
01300 - 2 deviations from the contract documents (if any), check dimensions, check that trades have been coordinated, and that no conflict will develop in this installation. After reviewing the shop drawings, indicate Contractor’s approval by signing and dating on Contractor’s stamp. Failure to follow these procedures will result in rejection of the submission and no additional contract time will be allowed for the delay from this cause.
B. Submit 1 electronic submittal of Contractor’s stamped and approved shop drawings for COR/CO’s review. The COR/CO will review and stamp it with indication of action as appropriate. The COR/CO will retain the electronic copy for their record, and will return an electronic copy to the Contractor.
For copies returned “Return for Correction - Re-Submit” correct the original drawings, make a new reproduction and print, and re-submit. For copies returned “Approved Subject to Contract Requirements” or “Approved as Noted”, provide each number of prints of the copies as may be needed for field distribution.
2.03 PRODUCT SAMPLES: Submit 5 copies of product samples for COR/CO’s review for items specified in the various specification sections. Make all submissions affecting color selection within 30 days after signing the contract.
Mark clearly to indicate exact items submitted, and note deviations from contract documents (if any). After reviewing the submittals, indicate approval by signing and dating on Contractor’s stamp, and submit to the COR/CO for review.
2.04 PROJECT SCHEDULE
A. Upon Award of Contract, a pre-installation conference will be scheduled to review and coordinate all phases of the site work. Detailed underground mechanical piping and underground electrical service installation plans, including but not limited to scheduling, pipe and cable sizes and types, routing, valves, splicing points, drops, pullboxes, tunnel crossings and terminations, shall be submitted at this time for review and approval.
B. Prior to commencement of work, submit to the COR/CO a bar chart type progress schedule indicating a time bar for each trade or operation of work to be performed in the building. Time bar shall demonstrate planned work, where work will be performed, properly sequenced and intermeshed for expeditious completion of work. Identify phases, if required.
C. Submit with bar chart a tabulation (by date) of all submittals required, either by date period relation in contract documents or as necessitated by lead time related to individual time bar shown on progress schedule for the associated work. At Contractor’s option, submittal dates may be shown on bar chart schedule, in lieu of being tabulated.
D. Submit monthly updates of bar chart, with pay request, accurately depicting actual progress to the first day of the month. Indicate percentage of completion on time bars at 10% increase.
E. Submit progress schedule on transparency or other reproducible stock.
F. Distribute progress schedule including all updates to COR/CO, Owner, Subcontractors, suppliers, fabricators, and others with a need to know schedule compliance requirements. Post copy in field office.
01300 - 3
2.05 SCHEDULE OF VALUES: Submit schedule of values on AIA Document G703 (Continuation Sheet for G702). Itemize separate line cost for each major item of work and each subcontracted item of work (use individual Sections under Division 2 through 16 in Table of Contents as a basis for listed).
2.06 APPLICATION AND CERTIFICATION FOR PAYMENT: Submit Application and Certificate for Payment on AIA Document G702 and G703. A Consent of Surety for Final Payment form (AIA Document G707) and Contractor’s Affidavit of Payments of Debt and Release of Liens (AIA Document G706A) shall accompany final payment application.
2.07 MANUAL: Upon completion of work, and prior to the final payment, submit four
(4) copies of Operation and Maintenance Manuals to the COR/CO a loose leaf hard cover binder with the project name printed on it, containing 5 indexed sections as follows:
A. Subcontractors: A listing of all subcontractors for the project, including portions of work done, address and telephone number of the firm, and contact at the firm familiar with the project.
B. Guarantee and Warranty: 1 fully executed copy of each guarantee and warranty period.
C. Certificates: 1 fully executed copy of each certificate specified.
D. Instructions: 1 operating service and maintenance manual or instruction sheet for each item specified, including a spare parts list.
E. List of As-Built Drawings, Record Drawings, Shop Drawings, Product Data and Samples.
2.08 DRAWINGS AND SUBMITTALS PACKAGE: Upon completion of the work and prior to the final payment, submit to the COR/CO a package labeled with the project name and containing 1 copy of all final record drawings in Revit, specifications, shop drawings, product data. Final drawings reproducible bond type. This package and the manual will be presented by the COR/CO to the Owner upon completion of the project. In addition, submit 1 set of record drawings to be retained by the COR/CO.
PART 3 - EXECUTION
3.01 IDENTIFICATION OF SUBMITTALS: Completely identify each submittal and re-submittal by showing at least the following information:
A. Name and address of submitter, plus name and telephone number of the individual who may be contacted for further information.
B. Name of project as it appears on each page of these specifications and COR/CO’s project number.
C. Drawing number and specifications section number to which the submittal applies.
D. Whether this is an original submittal or resubmittal.
01300 - 4
3.02 TIMING OF SUBMITTALS
A. General: Make all submittals far enough in advance of scheduled dates of installation to provide all required time for reviews, for securing necessary approvals, for possible revision and re-submittal and for placing orders and securing delivery. After receipt of submittal, the Owner shall have a review period of 15 calendar days. If resubmittal is required, the Contractor shall resubmit within 15 calendar days of receipt of Owner’s response.
B. Delays: Costs of delays due to late submittals may be back charged as necessary and shall not be borne by the Owner.
01500 - 1
SECTION 01500 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
PART 1 - GENERAL
1.01 SCOPE: Provide temporary utilities and miscellaneous facilities required during construction, complete, during maintenance and removal.
PART 2 - PRODUCTS
2.01 UTILITIES:
A. Temporary Utilities Furnished By Owner: After acceptance of existing conditions, use of existing utilities will be available at no cost to the Contractor.
1. Water: Provide necessary piping and fittings.
2. Electricity: Provide necessary temporary electric wiring. Provide area distribution boxes, meeting NEC and OSHA requirements, and so located that individual trades may use their own construction type extension cords to obtain adequate power and lighting for construction operations.
B. Temporary Utilities Furnished By Contractor:
1. Telephone: Contractor shall provide telephone and/or facsimile machine in the field office and shall bear all costs for temporary service.
2.02 SANITARY FACILITIES: The Contractor shall be allowed to use the existing toilets as available and as operable. Portable facilities will be provided as required by the Contractor. All portable facilities must be properly maintained by the Contractor.
2.03 FIELD OFFICE: Field office, storage facilities, supply and tool rooms will be located as designated by the Owner. Make the field office available to COR/CO throughout entire construction period.
2.04 PERSONNEL IDENTIFICATION: Provide identification badges for all employees. Badges shall have the Contractor’s name in not less than 12 point capital letters and employee’s identification name or number in not less than 24 point size. Provide letters and background in light and dark colors respectively (or dark and light) to facilitate easy reading.
2.05 PARKING AND STAGING AREAS: Contractor’s employees shall park in designated areas. Parking to be designated by the Owner. Staging areas will be provided near the building. The Contractor shall provide 6 foot high fencing with lockable access around any staging/storage area. Trailers may be used for staging/storage without fencing. However, suitable storage locations for trailers may not be readily accessible to the building.
2.06 CONSTRUCTION AIDS: Provide and maintain for the duration of construction temporary equipment and apparatus including scaffolds, hoists, tarpaulins, barricades, warning signs, steps, ladders, platforms, and other temporary construction aids and miscellaneous facilities as necessary for proper completion of the work; comply with pertinent safety regulations.
01500 - 2
2.07 TEMPORARY FIRE PROTECTION: During construction period, provide and maintain types and forms of temporary fire protection needed to protect facilities against fire losses. Store combustible materials in recognized fire-safe locations and containers.
2.08 SECURITY: Provide sufficient controls to prevent illegal entry or damage during nights, holidays, or other periods when work is not being executed, and such other controls as required during working hours.
2.09 TEMPORARY PARTITIONS: Provide temporary barriers and/or partitions as required to protect the occupants of the building and the general public from injury due to the work of this project; and/or to protect adjacent areas of the building from the spread of dust and dirt caused by the work or this project.
Remove temporary barriers and partitions upon completion of the Project.
Temporary partitions shall be constructed of 1/2" plywood on the construction face nominal 2" X 4" wood studs and 1/2" gypsum wallboard on the public occupied face.
PART 3 - EXECUTION
3.01 REMOVAL: Maintain construction facilities and temporary controls as long as needed for safe and proper completion of work. Remove temporary facilities and controls as rapidly as progress of work will permit, or as directed by the COR/CO. All damages incurred by the installation and/or removal of all temporary services shall be repaired by the Contractor to its original condition.
01900 - 1
SECTION 01900 - ALTERATION PROCEDURES
PART 1 - GENERAL
1.01 SCOPE: Procedural requirements for performing alteration of existing building, spaces and materials.
1.02 RELATED WORK:
A. Section 02070
B. Section 16010
PART 2 - PRODUCTS
2.01 PRODUCTS FOR PATCHING AND EXTENDING WORK:
A. New materials: As specified in individual Sections.
B. Match existing products and work for patching and extending work, unless otherwise specified.
C. Determine type and quality of existing products by inspection and by necessary testing, and workmanship, by use of existing as a standard.
Presence of a product, finish or type of work, requires that patching, extending, or matching shall be performed as necessary to make work complete and consistent with existing quality, unless otherwise specified.
PART 3 - EXECUTION
3.01 INSPECTION:
A. Verify that demolition is complete, and areas are ready for installation of new work.
B. Beginning of alteration work means acceptance of existing conditions.
3.02 PREPARATION:
A. If not previously performed under demolition work, cut, move or remove items as necessary for access to alteration work; replace and restore at completion. Note: Notify the Owner's Project Manager and receive approval prior to starting demolition work.
B. Remove unsuitable material; replace materials as specified for finished work.
C. Remove debris and abandoned items from area and from concealed spaces.
D. Prepare surfaces and remove surface finishes to provide for proper installation of new work and new finishes.
E. If not previously performed under demolition work, close openings in exterior surfaces to protect work from weather and extremes of temperature and humidity.
01900 - 2
3.03 INSTALLATION:
A. Coordinate alteration work to expedite completion.
B. Remove, cut and patch work in a manner to minimize damage, and to provide means of restoring products and finishes to specified condition.
C. Refinish visible existing surfaces to remain to specified condition for each material, with a neat transition to adjacent new finishes.
D. Install products as specified in individual sections.
3.04 TRANSITIONS:
A. Where new work abuts or aligns with existing, make smooth and even transition. Patched work shall match existing adjacent work in texture and appearance, unless both new and existing work to receive new surface treatment, and unless otherwise indicated.
B. When finished surfaces are cut so that a smooth transition with new work is not possible, terminate existing surface along a straight line at a natural line of division and make recommendation to the Owner.
3.05 REPAIR OF DAMAGED SURFACES:
A. Patch or replace portions of existing surfaces which are damaged, lifted, discolored, or showing other imperfections.
B. Repair substrate prior to patching finish.
3.06 FINISHES:
A. Finish surfaces as indicated and as specified in individual sections.
B. Finish patches to produce uniform finish and texture over entire area.
When finish cannot be matched, refinish entire surface to nearest intersections.
02070 - 1
SECTION 02070 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.01 SCOPE:
A. Provide selective demolition work, complete, as indicated and as specified, including removal and disposal of demolished materials and capping of existing utilities.
B. Removal, protection and storage of items designated for re-use.
1.02 RELATED WORK:
A. Cutting of non-structural concrete floors, ceilings, masonry walls for piping, ducts and conduit will be the responsibility of the contractor.
B. Relocation of conduits and other electrical work; Division 16.
1.03 SUBMITTALS: Comply with Section 01300.
A. Before commencing selective demolition work, submit for review and approval of the COR/CO, a schedule showing the commencement, order and completion dates for the various parts of this work. Include coordination for shut-off, capping and continuation of utility services as required.
B. BEFORE STARTING ANY WORK RELATING TO EXISTING UTILITIES
THAT WILL TEMPORARILY DISCONTINUE SERVICE TO EXISTING
BUILDING, NOTIFY IN WRITING THE COR/CO AND/OR
CONSTRUCTION MANAGER TWO WEEKS IN ADVANCE AND OBTAIN
APPROVAL BEFORE PROCEEDING WITH WORK. DO NOT
DISCONNECT OR DISRUPT SERVICE WITHOUT COR/CO’S AND/OR
CONSTRUCTION MANAGER’S PRIOR APPROVAL.
1.04 JOB CONDITIONS:
A. Occupancy: The Owner’s personnel will be occupying the building.
Conduct work in manner that will minimize need for disruption of the Owner’s normal operations.
B. Condition of Structure: The Owner assumes no responsibility for actual condition of items or portions of structure to be demolished.
C. Salvageable Items: Items indicated to be removed, and not designated for re-use, may be salvaged by Contractor only after the Construction Manager’s approval. Transport salvaged items from site as they are removed. Storage or sale of removed items on site will not be permitted.
D. Protections:
1. Provide protective measures as required to protect the Owner’s personnel and general public from injury due to selective demolition work.
2. Provide interior and exterior shoring, bracing, or support to prevent movement, settlement, and collapse of structure or element to be demolished, and adjacent facilities or work to remain.
02070 - 2
3. Provide adequate fire protection in accordance with local Fire Department requirements.
4. Cover and protect floor, all existing equipment and fixtures to remain from soiling or damage when demolition work is performed in rooms or areas from which such items have not been removed.
5. Protect from damage existing finish work that is to remain in place and becomes exposed during demolition operations.
6. Provide temporary weather protection during interval between demolition and removal of existing construction on exterior surfaces, and installation of new construction to insure that no water leakage or damage occurs to structure or interior areas of existing building.
E. Damages: Promptly repair, to the satisfaction of the COR/CO, damages caused to existing structure or contents by demolition work or due to insufficiency of protection provided at no cost to the Construction Manager.
Replace damaged work, as directed by the COR/CO, if repair is not satisfactory.
F. Traffic: Conduct selective demolition operations and debris removal in a manner to ensure minimum interference with roads, streets, walks and other adjacent occupied or used facilities.
G. Explosives: Use of explosives will not be permitted.
H. Utility Services: Maintain existing utilities indicated to remain, keep in service, and protect against damage during demolition operations.
I. Environmental Controls: Use temporary enclosures, and other suitable methods to limit dust rising and scattering. Comply with governing regulations pertaining to environmental protection. Contractor shall isolate the area of work and provide sealed partition around existing boiler #2 to protect the existing equipment from dust and debris. Contractor shall submit plans to Owner and COR/CO for approval.
PART 2 - PRODUCTS
Not Applicable
PART 3 - EXECUTION
3.01 DEMOLITION: Provide selective demolition as indicated and required for new work.
A. Proceed in a systematic manner. Use such methods as required to complete work indicated in accordance with demolition schedule and governing regulations.
B. Locate demolition equipment throughout structure and promptly remove debris to avoid imposing excessive loads on supporting walls, floors and framing.
3.02 DISPOSAL OF DEMOLISHED MATERIALS: Remove debris, rubbish and other materials resulting from demolition operations as the work progresses.
Transport and legally dispose of materials off site. Burning of debris will not be permitted on site.
02070 - 3
3.03 CLEAN UP AND REPAIR:
A. Upon completion of selective demolition work, remove tools, equipment and demolished materials from site. Remove protections.
B. Repair demolition performed in excess of that required. Return structures and surfaces to remain to condition existing prior to commencement of selective demolition work. Repair adjacent construction and surfaces soiled or damaged by selective demolition work.
02410 - 1
SECTION 02410 - TRADITIONAL ASBESTOS ABATEMENT
PART 1 - GENERAL
1.01 SCOPE:
A. Contract Documents and Related Requirements
1. Drawings, general provisions of the contract, including general and supplementary conditions and other Division 01 specifications, shall apply to the work of this section. The contract documents show the work to be done under the contract and related requirements and conditions impacting the project. Related requirements and conditions include applicable codes and regulations, notices and permits, existing site conditions and restrictions on use of the site, requirements for partial owner occupancy during the work, coordination with other work and the phasing of the work. In the event the Asbestos Abatement Contractor discovers a conflict in the contract documents and/or requirements or codes, the conflict must be brought to the immediate attention of the Contracting Officer for resolution. Whenever there is a conflict or overlap in the requirements, the most stringent shall apply. Any actions taken by the Contractor without obtaining guidance from the Contracting Officer shall become the sole risk and responsibility of the Asbestos Abatement Contractor. All costs incurred due to such action are also the responsibility of the Asbestos Abatement Contractor.
B. Extent of Work
1. Below is a brief description of the estimated quantities of asbestos containing materials to be abated. These quantities are for informational purposes only and are based on the best information available at the time of the specification preparation. The Contractor shall satisfy himself as the actual quantities to be abated. Nothing in this section may be interpreted as limiting the extent of work otherwise required by this contract and related documents.
2. Approximately 2,625 square feet of asbestos containing boiler insulation materials, rope, and gaskets shall be included as part of scope of work. Snyder Environmental (124 W. Capital Avenue, Suite 1820, Little Rock, AR 72201, Office # 501-801-2776, Jay Dixon) had performed work for asbestos abatement for previous boiler project.
1.02 RELATED WORK:
A. Division 1 - General Requirements
B. Section 02070 - Selective Demolition
1.03 TASKS
A. Pre-abatement activities including pre-abatement notifications, permits, submittal approvals, regulated area preparations, emergency procedures arrangements, and standard operating procedures for asbestos abatement work.
02410 - 2
B. Abatement activities including removal, enclosure, clean-up and disposal of ACM waste, recordkeeping, security, monitoring, and inspections.
C. Cleaning and decontamination activities including final visual inspection, air monitoring and certification of decontamination.
1.04 VARIATIONS IN QUANTITY
A. The quantities and locations of ACM as indicated on the drawings and the extent of work included in this section are estimated which are limited by the physical constraints imposed by occupancy of the buildings and accessibility to ACM. Accordingly, minor variations (+/- 5%) in quantities of ACM within the regulated area are considered as having no impact on contract price and time requirements of this contract. Where additional work is required beyond the above variation, the contractor shall provide unit prices for newly discovered ACM and those prices shall be used for additional work required under the contractor.
1.05 APPLICABLE CODES AND REGULATIONS
A. General Applicability of Codes, Regulations, and Standards
1. All work under this contract shall be done in strict accordance with all applicable Federal, State, and local regulations, standards and codes governing asbestos abatement, and any other trade work done in conjunction with the abatement. All applicable codes, regulations and standards are adopted into this specification and will have the same force and effect as this specification.
2. The most recent edition of any relevant regulation, standard, document or code shall be in effect. Where conflict among the requirements or with these specifications exists, the most stringent requirement(s) shall be utilized.
3. Copies of all standards, regulations, codes and other applicable documents, including this specification and those listed in Section 1.5 shall be available at the worksite in the clean change area of the worker decontamination system.
1.06 ASBESTOS ABATEMENT CONTRACTOR RESPONSIBILITY
A. The Asbestos Abatement Contractor (Contractor) shall assume full responsibility and liability for compliance with all applicable Federal, State and Local regulations related to any and all aspects of the asbestos abatement project. The Contractor is responsible for providing and maintaining training, accreditations, medical exams, medical records, personal protective equipment (PPE) including respiratory protection including respirator fit testing, as required by applicable Federal, State and Local regulations. The Contractor shall hold the NCTR and NCTR consultants harmless for any Contractor’s failure to comply with any applicable work, packaging, transporting, disposal, safety, health, or environmental requirement on the part of himself, his employees, or his subcontractors. The Contractor will incur all costs of the CPIH/CIH, including all sampling/analytical costs to assure compliance with
02410 - 3
OSHA/EPA/State requirements related to failure to comply with the regulations applicable to the work.
1.07 FEDERAL REQUIREMENTS: Federal requirements which govern of asbestos abatement include, but are not limited to, the following regulations.
A. Occupational Safety and Health Administration (OSHA)
1. Title 29 CFR 1926.1101 - Construction Standard for Asbestos
2. Title 29 CFR 1910 Subpart I - Personal Protective Equipment
3. Title 29 CFR 1910.134 - Respiratory Protection
4. Title 29 CFR 1926 - Construction Industry Standards
5. Title 29 CFR 1910.1020 - Access to Employee Exposure and Medical Records
6. Title 29 CFR 1910.1200 - Hazard Communication
7. Title 29 CFR 1910 Subpart K - Medical and First Aid
8. Environmental Protection Agency (EPA):
9. 40 CFR 61 Subpart A and M (Revised Subpart B) - National Emission Standard for Hazardous Air Pollutants - Asbestos.
10. 40 CFR 763.80 - Asbestos Hazard Emergency Response Act
(AHERA)
11. Department of Transportation (DOT)
12. Title 49 CFR 100 - 185 – Transportation
1.08 STATE REQUIREMENTS
A. State requirements that apply to the asbestos abatement work, disposal, clearance, etc., include, but are not limited to, the following:
1. Regulation 21 Arkansas Asbestos Abatement Regulation (Air Division, Asbestos Program) (ADEQ).
1.09 NCTR RESPONSIBILITIES: Prior to commencement of work:
A. Notify occupants adjacent to regulated areas of project dates and requirements for relocation, if needed. Arrangements must be made prior to starting work for relocation of desks, files, equipment, and personal possessions to avoid unauthorized access into the regulated area. Note:
Notification of adjacent personnel is required by OSHA in 29 CFR
1926.1101 (k) to prevent unnecessary or unauthorized access to the regulated area.
PART 2 - PRODUCTS
2.01 SUBMITTALS
A. Provide required project Documentation in accordance with Federal and State Requirements for Asbestos Abatement including but not limited to
02410 - 4
Medical Surveillance, Worker Certification, Daily Logs, Project Manual, Supervisor’s Reports and paperwork concerning the project.
B. Proof of Insurance: Workmen’s Compensation, Automobile and Comprehensive General Liability Insurance.
PART 3 - EXECUTION
3.01 ABATEMENT: Provide Abatement and proper disposal of front burner box insulation, boiler insulation materials, mud drums, gaskets and rope seals and plates.
A. Proceed in a systematic manner. Use such methods as required to complete work indicated in accordance with abatement schedule and governing regulations.
3.02 DISPOSAL OF MATERIALS: Dispose of contaminated material in accordance with applicable Federal and State Regulations at a certified class one landfill.
3.03 CLEAN UP AND REPAIR:
A. Upon completion of abatement work, remove tools, equipment and demolished materials from site. Remove protections.
02511 - 1
SECTION 02511 – ASPHALTIC CONCRETE PAVING
PART 1 - GENERAL
1.01 SCOPE: Provide asphalt concrete paving work, complete.
1.02 JOB CONDITIONS:
A. Weather Limitations: Do not apply prime and tack coats when temperature is below 50
F or when base is wet. Apply asphalt concrete paving surface course only when temperature is above 40
F and when base is dry.
B. Grade Control: Establish and maintain required lines and elevations.
PART 2 - PRODUCTS
2.01 MATERIALS: Use locally available materials and gradations which exhibit a satisfactory record of previous installations.
A. Base Course Aggregate: Sound, angular crushed stone, crushed gravel, or crushed slag, sand, stone or slag screenings.
B. Surface Course Aggregate: Crushed stone, crushed gravel, crushed slag, and sharp-edged natural sand.
C. Mineral Filler: Limestone dust, Portland cement, or other inert material complying with ASTM D242 or AASHTO M17.
D. Asphalt Cement: Comply with ASTM D946 for 85-100 penetration grade.
E. Prime Coat: Cut-back asphalt type.
F. Tack Coat: Emulsified asphalt, diluted with one part to one part emulsified asphalt.
2.02 ASPHALTIC CONCRETE HOT MIX SURFACE COURSE: Provide in
accordance with Section 408 of the Arkansas State Highway Commission Standard Specification for Highway Construction.
PART 3 - EXECUTION
3.01 INSPECTION: Examine the areas and conditions under which asphalt concrete paving is to be installed. Do not proceed with the work until unsatisfactory conditions have been corrected.
3.02 SURFACE PREPARATION:
A. Remove all loose material from compacted subbase surface immediately before applying prime coat. Proof roll prepared subbase surface to check for unstable areas and areas requiring additional compaction. Do not
02511 - 2 begin paving work until deficient subbase areas have been corrected and are ready to receive paving.
B. Prime Coat: Apply at the rate of 0.2 to 0.5 gal. per sq. yd., over compacted subgrade. Apply material to penetrate seal, but not flood surface. Cure and dry as long as necessary to obtain penetration and evaporation of volatiles.
C. Tack Coat: Apply to contact surfaces of previously constructed asphalt or
Portland cement concrete and surfaces abutting or projecting into asphalt concrete pavement. Distribute at rate of 0.05 to 0.15 gal. per sq. yd. of surface. Allow to dry until at proper condition to receive paving.
3.03 PLACING THE MIX: Place asphalt concrete mixture on prepared surface, spread and strike-off. Spread mixture at minimum temperature of 225 F. Place inaccessible and small areas by hand. Place each course to required grade, cross-section, and compacted thickness.
A. Paver Placing: Place in strips not less than 10’ wide, unless otherwise acceptable to Engineer. After first strip has been placed and rolled, place succeeding strips and extend rolling to overlap previous strips. Complete base course for a section before placing surface course.
B. Joints: Make joints between old and new pavements, or between successive days’ work, to ensure continuous bond between adjoining work.
Construct joints to have same texture, density and smoothness as the sections of asphalt concrete course. Clean contact surface and apply tack coat.
3.04 ROLLING: Begin rolling when mixture will bear roller weight without excessive displacement. Compact mixture with hot hand tampers or vibrating plate compactors in areas inaccessible to rollers.
A. Breakdown Rolling: Accomplish breakdown or initial rolling immediately following rolling of joints and outside edge. Check surface after breakdown rolling, and repair displaced areas by loosening and filling, if required, with hot material.
B. Second Rolling: Follow breakdown rolling as soon as possible, while mixture is hot. Continue second rolling until mixture has been thoroughly compacted.
C. Finish Rolling: Perform finish rolling while mixture is still warm enough for removal of roller marks. Continue rolling until all roller marks are eliminated and the course has attained maximum density.
D. Patching: Remove and replace paving areas mixed with foreign materials and defective areas. Cut out such areas and fill with fresh hot asphalt concrete. Compact by rolling to maximum density and smoothness.
02511 - 3
E. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked.
3.05 PAVING TOLERANCES: In-place compacted asphalt concrete paving will not be acceptable if exceeding following allowable tolerances.
A. Thickness of base course, not more than 1/2”, plus or minus.
B. Thickness of surface course, not more than 1/4”, plus or minus.
C. Base course surface smoothness, not more than 1/4” when measured with a 10’ straightedge, applied parallel with, and at right angles to centerline of paved area.
D. Wearing course surface smoothness, not more than 3/16” when measured with a 10’ straightedge, applied parallel with, and at right angles to centerline of paved areas.
The Engineer of Record for Division 03 of the Specifications for the Building 7 – Boiler #3 Replacement, Jefferson Laboratories, Jefferson, Arkansas, TME Project No. 01-13- 0018 is:
Date
03310 - 1
SECTION 03310 - CONCRETE WORK
PART 1 - GENERAL
1.01 SCOPE: Provide all cast in place concrete work, unless otherwise specified.
Provide all reinforcing steel, dowels, chairs, and accessories for concrete work.
1.02 RELATED DOCUMENTS: Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this section.
1.03 DESCRIPTION OF WORK: Extent of concrete work is shown on drawings.
1.04 QUALITY ASSURANCE:
A. Codes and Standards: Comply with provisions of following codes, specifications and standards, except where more stringent requirements are shown or specified:
1. ACI 301 “Specifications for Structural Concrete for Buildings”.
2. ACI 318 “Building Code Requirements for Reinforced Concrete”.
3. Concrete Reinforcing Steel Institute, “Manual of Standard Practice”.
B. Concrete Testing Service: Engage a testing laboratory acceptable to Engineer to perform material evaluation tests and to design concrete mixes.
C. Materials and installed work may require testing and re-testing, as directed by Engineer, at any time during progress of work. Allow free access to material stockpiles and facilities. Tests, including re-testing of rejected materials and installed work, shall be done at owner’s expense.
1.05 SUBMITTALS:
A. Product Data: Submit data for proprietary materials and items, including reinforcement and forming accessories, admixtures, patching compounds, waterstops, joint systems, curing compounds, dry-shake finish materials, and others as requested by Engineer.
B. Shop Drawings; Reinforcement: Submit shop drawings for fabrication, bending, and placement of concrete reinforcement. Comply with ACI 315 “Manual of Standard Practice for Detailing Reinforced Concrete Structures” showing bar schedules, stirrup spacing, diagrams of bent bars, and arrangement of concrete reinforcement. Include special reinforcement required and openings through concrete structures.
C. Samples: Submit samples of materials as specified and as otherwise requested by Engineer, including names, sources, and descriptions.
D. Laboratory Test Reports: Submit laboratory test reports for concrete materials and mix design test as specified.
E. Material Certificates: Provide materials certificates in lieu of materials laboratory test reports when permitted by Engineer. Material certificates shall be signed by manufacturer and Contractor, certifying that each material item complies with, or exceeds, specified requirements.
03310 - 2
2.01 MATERIALS:
A. Form Materials:
1. Forms for Exposed Finish Concrete: Unless otherwise indicated, construct formwork for exposed concrete surfaces with plywood, metal, metal-framed plywood faced or other acceptable panel-type surfaces. Furnish in largest practicable sizes to minimize number of joints and to conform to joint system shown on drawings. Provide form material with sufficient thickness to withstand pressure of newly-placed concrete without bow or deflection.
2. Forms for Unexposed Finish Concrete: Form concrete surfaces which will be unexposed in finished structure with plywood, lumber, metal or other acceptable material. Provide lumber dressed on at least 2 edges and one side for tight fit.
B. Form Coatings: Provide commercial formulation form-coating compounds that will not bond with, stain nor adversely affect concrete surfaces, and will not impair subsequent treatments of concrete surfaces.
C. Reinforcing Materials:
1. Reinforcing Bars: ASTM A 615, Grade 60, deformed.
2. Steel Wire: ASTM A 82, plain, cold-drawn, steel.
3. Welded Wire Fabric: ASTM A 185, welded steel wire fabric.
4. Supports for Reinforcement: Provide supports for reinforcement including bolsters, chairs, spacers and other devices for spacing, supporting and fastening reinforcing bars and welded wire fabric in place. Use wire bar type supports complying with CSRI specifications, unless otherwise acceptable.
a. For slabs-on-grade, use supports with sand plates or horizontal runners where base material will not support chair legs.
D. Concrete Materials:
1. Portland Cement: ASTM C 150, Type I, unless otherwise acceptable to Engineer.
2. Fly Ash: ASTM C 618, Type C or Type F: Limit use of fly ash to not exceed 25% of cement content by weight.
3. Normal Weight Aggregates: ASTM C 33, and as herein specified.
Provide aggregates from a single source for exposed concrete. For exterior exposed surfaces, do not use fine or coarse aggregates containing spalling-causing deleterious substances.
4. Lightweight Aggregates: ASTM C 330.
5. Water: Drinkable.
6. Air-Entraining Admixture: ASTM C 260.
03310 - 3
7. Water-Reducing Admixture: ASTM C 494, Type A, and contain not more than 0.1% chloride ions.
8. High-Range Water-Reducing Admixture (Super Plasticizer): ASTM C 494, Type F or Type G and contain not more than 0.1% chloride ions.
9. Water-Reducing, Non-Chloride Accelerator Admixture: ASTM C 494, Type E, and containing not more than 0.1% chloride ions.
10. Water-Reducing, Retarding Admixture: ASTM C 494, Type D, and contain not more than 0.1% chloride ions.
11. Certification: Provide admixture manufacturer’s written certification that chloride ion content complies with specified requirements.
12. Calcium chloride or admixture containing more than 0.1% chloride ions are not permitted.
E. Related Materials:
1. Moisture Barrier: Provide moisture barrier cover over prepared base material where indicated. Use only materials which are resistant to decay when tested in accordance with ASTM E 154, such as polyethylene sheet not less than 6 mils thick.
2. Non-Shrink Grout: CRD-C 621, factory pre-mixed grout.
3. Absorptive Cover: Burlap cloth made from jute or kenaf, weighing approximately 9 oz. per sq. yd., complying with AASHTO M 182, Class 2.
4. Moisture-Retaining Cover: One of the following, complying with
ASTM C 171.
a. Waterproof paper
b.…
This is the start of the file's text. The full file is on GovTribe.