M501.pdf
PDF 836 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M501
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
WATER
SOFTENER
F O
S
F O
R
N.C.
VTR
R
T
FM BFW
N.C.
VTR
N.C.
N.C. N.C.
V SR
CONDENSATE
TANK
FM
TFD
V
FM
VTR
FM
S100S100
S100 S100S100
DEAERATOR
75,000 LB/HR
MAKE-UP WATER
CONTROL VALVE
HIGH AND
LOW WATER
ALARMS
4"
14"
FLOW
METER
VENT
THROUGH
ROOF
PSR
FROM
HIGH LINE
FLOW
METER
HARDNESS
MONITOR
4" TREATED
CONDENSATE
SOFTENED BOILER
MAKE-UP
4"
TREATED
CONDENSATE
STEAM
CONTROL
VALVE
OVERFLOW
DRAIN
4"
PRESSURE
TRANSMITTER
LOW PRESSURE
STEAM TO AHU-1 AND
UNIT HEATERS
RELIEF
VALVE SET
AT 25 PSI
6"
HIGH
PRESSURE
STEAM RETURN
TO SURGE TANK
STEAM PRESSURE
REGULATING
VALVES
SEE DETAIL #1,
SHEET M603
12" HIGH
PRESSURE
STEAM HEADER
PRESSURE
TRANSMITTER
12"
BLOWDOWN
HEAT
RECOVERY
UNIT
FLOW METER
WATER
METER
6"
4" 4"
6"
EXISTING
BACKFLOW
PREVENTERS
6"
DOMESTIC
WATER
DEAERATOR
OVERFLOW
PRESSURE
TRANSMITTER
2"
FLOW
METER
FEEDWATER PUMP
DRAIN
CONN.
COLD WATER TO...4"
TO
INDUSTRIAL
SEWER
4"
CONDENSATE
POLISHER
N.C.4"
N.C.
N.C.
CONDENSATE
PUMPS
SURGE TANK
VENT
LOW PRESSURE RETURNS
FROM BUILDING 7
STEAM
HEADER
ISOLATION
VALVES
S100
LOW PRESSURE
STEAM RETURN
TO SURGE TANK
STEAM
TREATMENT
SCALE
INHIBITOR CAUSTIC
OXYGEN
SCAVENGER
VTR
V 1-1/2"1"R
3/8"
STAINLESS
STEEL
TUBING
N.O.
SBD SBD
FM
FLOW
METER
4"
4"
N.C.
CONDENSATE WATER
CONTROL VALVE
BYPASS ORIFICE
W/SHUT-OFF
VALVE6"
2"
N.O.
N.O.
NEEDLE
VALVE
QUICK OPEN
VALVE
SLOW
OPEN
VALVE
3"
CONNECTION ON
MEZZANINE TO
EXISTING CAMPUS
STEAM RETURN.
3"
PIPE IN
EXISTING
TRENCH
TO BLOW DOWN
SEPERATOR.
N.C.
VTR
VTR
1"
3"
3"
3"
1/2"
KLINGER
PLUG
VALVE
TO FLOOR
DRAIN
MODULATING
FEED WATER
CONTROL
VALVE
DRAIN TO
BLOW DOWN
SEPERATOR
NON-RETURN
STEAM VALVE
SAMPLE
LINE TO
CHEMICAL
TREATMENT
3"
NEW PIPE IN
EXISTING
TRENCH
EXISTING
PIPE IN
EXISTING
TRENCH
EXISTING
BACKFLOW
PREVENTER
2"
2"
4"
3/8" STAINLESS
STEEL TUBING
3/8" STAINLESS
STEEL TUBING
QUICK OPEN
VALVE
DRAIN
VALVE
(TYP.
FOR 3)
3"
RELIEF
VALVE
(TYP)
FOR 3
S
CONCRETE
PAD
SURF.
BLOW
DOWN
CONTROL
VALVE
FIRST
STAGE
ENCONOMIZER
SECOND
STAGE
ENCONOMIZER
SCW
6"
FM
FLOW
METER
GGGG
6"6"
N.C.
N.C.
N .C
N .C
N .C
4"BYPASS
4"
4"
N.O. N.O. N.O.
G
SCW
SBD
B F
W
BFW
BFW
6"6"
G 1" F
O R
1- 1/
2" F
O S
4"
FROM NEW FUEL OIL
SYSTEM
4" FOS
2"FOR
4"FOS
2"FOR
EXISTING FIRE TUBE BOILER #1
6"
EXISTING
TRENCH
EXISTING TRENCH
FINISHED
FLOOR
6"
6" 6"
6"
6"
S100
S C
W
SCW
SCW
SCW
10"
S100
EXISTING
SECTIONAL
VALVE
3"
TO BOILER
GAS TRAIN
14"
S
EXISTING
SECTIONAL
VALVE
10"
14"
N.C. N.O.
BFW
S100
2-1/2"
2-1/2"
2-1/2"
1"
1" 1"
MAKE-UP
WATER BYPASS
2"
1"
1"
AUXILIARY
DRAIN
2"
2"
4" 4"
3"
2"
4"
4"
4"
4" 4"
4"
6"
B F
W
B F
W
4"
2-1/2"
TO
TDF
4"
4"
4"
4" 4"
4"
1"
BFW BYPASS
2"
3"
1"
2-1/2"2-1/2"
1"
2"
TO
FLOOR
DRAIN
4"
N.C. N.C.
N.O.
N.C.
3"
2"
8"
1-1/2"
ST-7
1-1/2"
ST-7
4" 6"
S15 3"
6"
8"
6"
8"
BYPASS
8"
8"
8"
TO BOILER#2
4"
4"
4"
4"
6"
6"
EXISITNG
6" BLACK
STEEL PIPE
NEW VENT
PIPE
ISOLATION
ON EXISTING
PSR DURING
THE STEAM
SHUTDOWN
MAKE-UP
WATER
RPZ FOR
MAKE-UP
WATER
FIRST
STAGE
ENCONOMIZER
SECOND
STAGE
ENCONOMIZER
1" F
O R
1- 1/
2" F
O S
4" FOS
2"FOR
4"FOS
2"FOR
FLOW
METER
T
FM
FM
FM
FM
FM
FM
FM
FM
FM
SBD
KEYED NOTES:
1"
N.O.
SBD
NEEDLE VALVE
QUICK OPEN
VALVE
SLOW
OPEN
VALVE
N.C.
VTR
VTR
1"
3"
3"
3"
1/2"
KLINGER
PLUG
VALVE
3"
TO FLOOR
DRAIN
MODULATING
FEED WATER
CONTROL
VALVE
DRAIN
TO BLOW
DOWN
SEPERATOR
NON-RETURN
STEAM VALVE
SAMPLE
LINE TO
CHEMICAL
TREATMENT
SBD
QUICK OPEN
VALVE
DRAIN
VALVE
(TYP.
FOR 3)
3"
S
SURF.
BLOW
DOWN
CONTROL
VALVE
G
EXISTING FIRE TUBE BOILER #2
4"
2-1/2"
2-1/2"
1"
1" 1"
1"
N.C. N.C.
N.O.
N.C.
3"
3"
RELIEF
VALVE
(TYP)
FOR 3
2" DRAIN TO
TRENCH
2" DRAIN TO
TRENCH
FM
FLOW
METER
N G F O
S
F O
R
N G
EXISTING 10" STEAM PIPE TO EXISTING 14"
STEAM HEADER.
NEW BOILER FEEDWATER FLOW METER.
NEW STEAM FLOW METER FURNISHED BY
BOILER MANUFACTURER. INSTALLED BY
CONTRACTOR FOR EXISTING FIRE TUBE BOILER.
NEW FUEL OIL FLOW METERS FURNISHED BY
BOILER MANUFACTURER, INSTALLED BY
CONTRACTOR.
NEW NATURAL GAS FLOW METER FURNISHED WITH
BOILER, INSTALLED BY CONTRACTOR.
NEW FUEL OIL FLOW METERS FURNISHED BY
BOILER MANUFACTURER, INSTALLED BY
CONTRACTOR.
TO BOILER FUEL OIL RECIRULATING TANK.
TO NEW FIRE TUBE BOILER GAS TRAIN.
CONTRACTOR SHALL PROVIDE AND INSTALL
ISOLATION VALVE AND PIPE TO BLOWDOWN
SEPERATOR.
CONTRACTOR SHALL PIPE TO NALCO SAMPLE
MANIFOLD, PROVIDE AND INSTALL NALCO
MOTORIZED BLOWDOWN VALVE (PART# 041-
BLR007.88) AND NALCO BLOWDOWN CONDUCTIVITY
PROBE ASSEMBLY (PART# 060-BDP100.88).
CONTRACTOR SHALL PROVIDE AND INSTALL
ISOLATION VALVE AND PIPE TO BLOWDOWN
SEPERATOR FOR EXISTING BOILERS.
4"
4"
S100 TO
CAMPUS
3"
SBD
DRAIN TO
BLOW
DOWN
SEPERATOR
NON-RETURN
STEAM VALVE
2" DRAIN TO
TRENCH
FIRST
STAGE
ENCONOMIZER
SECOND
STAGE
ENCONOMIZER
FM
FM
FM
N.O.
SBD
NEEDLE VALVE
QUICK OPEN
VALVE
SLOW
OPEN
VALVE
3"
TO FLOOR
DRAIN
MODULATING
FEED WATER
CONTROL
VALVE
SAMPLE
LINE TO
CHEMICAL
TREATMENT
SBD
QUICK OPEN
VALVE
DRAIN
VALVE
(TYP.
FOR 3)
SURF.
BLOW
DOWN
CONTROL
VALVE
NEW FIRE TUBE BOILER #3
1"
1" 1"
1"
N G F O
S
F O
R
1" F
O R
1- 1/
2" F
O S
G
N.C.
VTR
VTR
1"
3"
3"
3"
1/2"
KLINGER
PLUG
VALVE
3"
2-1/2"
2-1/2"
N.C. N.C.
N.O.
N.C.
3"
3"
FM
FLOW
METER
10"
S
S
FM
FLOW
METER
7 7
G
4" 6"G
BFW
1"
1"
TO BOILER GAS TRAIN
2-1/2"
11 11
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M501
PIPING DIAGRAMS/FLOWS
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
NOT TO SCALE
BOILER #3 INSTALLATION − STEAM BOILER PLANT PIPING DIAGRAM