M200.pdf

PDF 720 KB Posted

Attached to
Boiler #3 Replacement
Solicitation number
14-223-SOL-00059
Issued by

About this file

M200

View the file

Other files

File Type Posted
Amendment_1.pdf PDF
M303.pdf PDF
M306.pdf PDF
M501.pdf PDF
S102.pdf PDF
M702.pdf PDF
G100.pdf PDF
M307.pdf PDF
M203.pdf PDF
E102.pdf PDF
Attachment_J-2_Drawings.pdf PDF
M202.pdf PDF
M302.pdf PDF
M304.pdf PDF
Attachment_J-4_FDA_Form_3391.pdf PDF
M401.pdf PDF
M701.pdf PDF
E301.pdf PDF
M403.pdf PDF
M402.pdf PDF
M103.pdf PDF
Attachment_J-1_Specifications.pdf PDF
E101.pdf PDF
M305.pdf PDF
M601.pdf PDF
E401.pdf PDF
M201.pdf PDF
S101.pdf PDF
M301.pdf PDF
M102.pdf PDF
E201.pdf PDF
E202.pdf PDF
Solicitation_14-223-SOL-00059.pdf PDF
M204.pdf PDF
Attachment_J-3_General_Decision_Number_AR140125.pdf PDF
M100.pdf PDF
M101.pdf PDF
M104.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4 3.4

2.4 1.4 1

H

E

D

B

A

3" BD

KEYED NOTES:

1 NEW 1" DRAIN DOWN IN TRENCH.

NEW 3" BLOW DOWN PIPE IN TRENCH.

EXISTING 2" ABANDONED NATURAL GAS

PIPE CAPPED.

NEW LOUVER WITH MANUAL DAMPER (SEE

STRUCTURAL DRAWINGS).

NEW FIRE TUBE BOILER #3 ( B-3 ).

NEW FUEL OIL RECIRCULATE TANK.

EXISTING BOILER/PLATFORM SUPPORT

COLUMNS TO REMAIN. PROTECT DURING

BOILER 3 INSTALLATION.

2" D 1

B-1

FOP-1

FOP-2FOP-3

NEW

B-3NEW

CPS-1

6" NG

BS-1

3" BD

3" BD

2" NG

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

B-2

EXISTING

EXISTING

FUEL OIL

PUMP

SYSTEM

EXISTING

AIR

COMPRESSOR

EXISTING

AIR

STORAGE

TANK

EXISTING

CHEMICAL

TREATMENT

BDHX-1

EXISTING

6" V

EXISTING

6" DCW

EXISTING

EXISTING

3" BD

3" BD

EXISTING

EXISTING

3" BD

EXISTING

3" BD

EXISTING

2" D

EXISTING

2" D

EXISTING

EXISTING

NEW WATER

SOFTNER

TANK

NEW WATER

SOFTNER

TANK

NEW WATER

SOFTNER

TANK

ADDITIVE OPTIONS

OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION #2

OPTION #3

OPTION #4

REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION #5

OPTION #6

REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.

NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.

NEW EMERGENCY GENERARTOR.

OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

M200

BOILER 3 INSTALLATION -

TRENCH PLAN - MECHANICAL

NEW

03-24-14

01-13-0018

B ui ld in g

B oi le r #3

R ep la ce m en t Je ffe rs on L ab or at or ie s

F oo d an d D ru g

A dm in is tr at io n

N C

T R

R d

Je ffe rs on

, A R

CONSTRUCTION

DOCUMENT

1/4" = 1’−0"

BOILER #3 INSTALLATION − TRENCH PLAN − MECHANICAL NEW

GENERAL NOTE:

CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO

BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.