M200.pdf
PDF 720 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M200
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4 3.4
2.4 1.4 1
H
E
D
B
A
3" BD
KEYED NOTES:
1 NEW 1" DRAIN DOWN IN TRENCH.
NEW 3" BLOW DOWN PIPE IN TRENCH.
EXISTING 2" ABANDONED NATURAL GAS
PIPE CAPPED.
NEW LOUVER WITH MANUAL DAMPER (SEE
STRUCTURAL DRAWINGS).
NEW FIRE TUBE BOILER #3 ( B-3 ).
NEW FUEL OIL RECIRCULATE TANK.
EXISTING BOILER/PLATFORM SUPPORT
COLUMNS TO REMAIN. PROTECT DURING
BOILER 3 INSTALLATION.
2" D 1
B-1
FOP-1
FOP-2FOP-3
NEW
B-3NEW
CPS-1
6" NG
BS-1
3" BD
3" BD
2" NG
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
B-2
EXISTING
EXISTING
FUEL OIL
PUMP
SYSTEM
EXISTING
AIR
COMPRESSOR
EXISTING
AIR
STORAGE
TANK
EXISTING
CHEMICAL
TREATMENT
BDHX-1
EXISTING
6" V
EXISTING
6" DCW
EXISTING
EXISTING
3" BD
3" BD
EXISTING
EXISTING
3" BD
EXISTING
3" BD
EXISTING
2" D
EXISTING
2" D
EXISTING
EXISTING
NEW WATER
SOFTNER
TANK
NEW WATER
SOFTNER
TANK
NEW WATER
SOFTNER
TANK
ADDITIVE OPTIONS
OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION #2
OPTION #3
OPTION #4
REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION #5
OPTION #6
REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.
NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.
NEW EMERGENCY GENERARTOR.
OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M200
BOILER 3 INSTALLATION -
TRENCH PLAN - MECHANICAL
NEW
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
1/4" = 1’−0"
BOILER #3 INSTALLATION − TRENCH PLAN − MECHANICAL NEW
GENERAL NOTE:
CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO
BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.
File details come from the government source that posted it. Updated .