M601.pdf
PDF 444 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M601
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| E401.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC LEGEND
HVAC DEMOLITION LEGEND
TEE, OUTLET DOWN
CAPPED OUTLET
ELBOW, TURNED DOWN
RISE OR DROP IN PIPE
TEE, SIDE CONNECTION
TEE, OUTLET UP
ELBOW, TURNED UP
FLANGE
RETURN AIR GRILLE
CEILING DIFFUSER
RETURN DUCT DOWN
EXHAUST DUCT DOWN
ACCESS PANEL
EXHAUST AIR GRILLE
ACCESS PANEL IN ROUND
AP
AP
CONTROL VALVE (2-WAY) ELECTRIC OR ELECTRONIC
H
METAL BELLOWS PUMP CONNECTOR
PRESSURE GAUGE W/ SIPHON
AIR VENT (A - AUTO, H - HAND)
PRESSURE AND TEMPERATURE TAP
THERMOMETER W/ INSERTION WELL
PIPE GUIDE
ANCHOR
PRESSURE GAUGE
STRAINER W/ DRAIN VALVE
CONTROL VALVE (2-WAY) PNEUMATIC
FLEXIBLE PIPE CONNECTOR
CHECK VALVE (BUTTERFLY CHECK)
CONTROL VALVE (3-WAY) PNEUMATIC
UNION
12SR
BFW
12S
PCR
D
OF
CW
STEAM RETURN (PRESSURE NOTED)
CHECK VALVE (SWING CHECK)
BUTTERFLY VALVE (GEAR OPERATOR)
BUTTERFLY VALVE (LEVER HANDLE)
GATE VALVE
GLOBE VALVE
BALL VALVE
DOMESTIC COLD WATER
OVERFLOW
CONDENSATE DRAIN
PUMPED CONDENSATE RETURN
BOILER FEEDWATER
STEAM SUPPLY (PRESSURE NOTED)
MOTORIZED VOLUME DAMPER
MANUAL VOLUME DAMPER
ROUND DUCT OFFSET
FIRE DAMPER (FD)
SMOKE DAMPER
CHANGE IN ELEVATION (R - RISE, F - FALL)
RECTANGULAR DUCT (WIDTH/DEPTH)
EXHAUST DUCT UP
SUPPLY DUCT DOWN
FLEXIBLE DUCT
SUPPLY DUCT UP
RETURN DUCT UP
R
20/12
GPM FLUID FLOW METER
SUPPLY AIR DUCT
RETURN AIR DUCT
ROUND DIAMETER
CUBIC FEET PER MINUTE
STREAMLINE TAP (ROUND)
ELL WITH TURNING VANES
EXHAUST AIR DUCT
FLAT OVAL (MAJOR/MINOR)
CONICAL TAP
SA
RA
CFM
EH
F
POINT OF CONNECTION TO EXISTING
DIRECTION OF PITCH
TEMPERATURE SENSOR
PIPE TO FLOOR DRAINTFD
TS
THERMOSTATT
NEW EQUIPMENT
STEAM TRAP
CONCENTRIC REDUCER
STEAM TRAP (DRIP LEG)
ECCENTRIC REDUCER
CAPPED PIPE
CFM DEVICE
CFM AIR DEVICE
TYPE RETURN/EXHAUST
TYPE - THROW SUPPLY AIR
OR OVAL DUCT
S
PRESSURE REDUCING VALVE
VALVE AT RISER
LONG (1.5x) RADIUS ELL
SHORT (1x) RADIUS ELL
STREAMLINE TAP (RECTANGULAR)
M
(RECTANGULAR OR ROUND)
(ROUND OR OVAL)
FUEL OIL RETURN
FUEL OIL SUPPLYFOS
FOR
CONTROL VALVE (3-WAY) ELECTRIC OR ELECTRONIC
FLOW LIMITING VALVE
EXISTING EQUIPMENT
HUMIDISTATH
THERMOSTAT WIRING
SYMBOL DESCRIPTION
EXISTING PIPING TO REMAIN
EXISTING EQUIPMENT TO REMAIN
PIPING TO BE REMOVED
EQUIPMENT TO BE REMOVED
TERMINATION OF DEMOLITION
SYMBOL DESCRIPTIONDESCRIPTIONSYMBOL
OS & Y GATE VALVE
AIR TERMINAL / FAN COIL UNIT/HOT WATER RETURN
AIR TERMINAL / FAN COIL UNIT
CONTROL VALVE (2-WAY) ELECTRIC OR ELECTRONIC
CONTROL VALVE (3-WAY) ELECTRIC OR ELECTRONIC
CALIBRATED BALANCING VALVE/ PLUG VALVE
CENTERLINE RADIUS = 1d
CENTERLINE RADIUS = 1.5d
ENERGY MANAGEMENT SYSTEM
AUTOMATIC TEMP CONTROLS
PARTS PER MILLION
CARBON DIOXIDE
EMS
ATC
PPM
CO2
BD BLOW DOWN
BLOW DOWN SEPARATORBS
SCW SOFTEN WATER
X X
X X
FIRE TUBE BOILER
DESIGNATION
MANUFACTURER/MODEL
MAXIMUM UNIT LENGTH
MAXIMUM UNIT WIDTH
MAXIMUM UNIT HEIGHT (INCLUDES BASE RAIL)
MAXIMUM OPERATING WEIGHT (LBS.)
EMISSION
GENERAL DATA
AIRFLOW LENGTH (INCHES)
GAS (NATURAL)
OIL (NO.2)
HORSEPOWER
GAS INPUT (NMHP)
OPERATING PRESSURE (PSIG)
OUTPUT (#/HR) / (FROM AND AT °F.)
DESIGN PRESSURE (PSIG)
OIL INPUT (GPH)
UNIT CONFIGURATION
NOX EMISSION (MAXIMUM):
ELECTRICAL
REMARKS:
B-3
STEAM DISENGAGING AREA (MINIMUM SQ. INCHES)
STEAM STORAGE AREA (MINIMUM CU. FEET)
HEATING SURFACE (MINIMUM SQ. FEET FIRESIDE)
BURNER TURNDOWN RATION NATURAL GAS
NATURAL GAS (%)
NO. 2 OIL (%)
ELECTRICAL FAN MOTOR
AIR COMPRESSOR MOTOR
OIL PUMP MOTOR
NOISE LEVEL (3'-0" FROM BURNER)
ELECTRICAL (V / H / P)
AVAILABLE GAS SUPPLY PRESSURE (PSIG)
BOILER SHALL BE FURNISHED WITH SINGLE POINT POWER CONNECTION.
CODE REQUIREMENTS: ASME / NATION AL BOARD - CSD-1 NFPA 8501 -
STATE OF ARKANSAS CODE REQUIREMENTS.
CLEAVER BROOKS 4WI-200-750-150ST
151.5"
119"
75,500
80"
218.7
750 H.P.
28,875 / 212
4-PASS / WET BACK / WITH INTERNAL BURNER
30.61
15,826
115.6
3,500
10:1
30- PPM (CORRECTED TO 3% O2)
90- PPM (CORRECTED TO 3% O2)
75 HP
7.5 HP
1 HP
460 / 60 / 3
88 dBA NORMAL - 90 dBA MAXIMUM
4.6 - 6.8
OVERALL
EFFICIENCY
(FUEL TO STEAM)
BOILER SHALL BE TESTED FOR GUARANTEED EFFICIENCY.
REFER TO SHEETS M703 FOR CONTROLS REQUIREMENTS.
REFER TO SPECIFICATION
REFER TO SPECIFICATION
TOTAL PACKAGE SHALL BE LISTED BY UNDERWRITER'S LAB (UL).
HEAT EXCHANGERS (STACK ECONOMIZER)
DESIGNATION LOCATION PRODUCT
REFERENCE SERVES
FLOW
UNIT
WEIGHT
( LBS )
SHELL SIDE
PRESSURE
( IN. W.C.)
REMARKS
FIRST STAGE
FLOW
SECOND STAGE
HEAT RECOVERED
SENSIBLE ( MBH )
EXHAUST
ENTERING
TEMP. ( °F. )
DESIGN PRESSURE
(PSIG)
ENTERING/ LEAVING
WATER ( °F. )
HEAT RECOVERED
LATENT ( MBH )
TOTAL EFF. HTG.
SURFACE (SQ. FT.)
DESIGN
PRESSURE
( PSIG )
ENTERING/
LEAVING
WATER ( °F. )
5,000 +/- 10"CLEAVER BROOKS
C2X-S3CF6AL
BOILER
PLANTBSE-3 B-3 453 373 300 / 150 227 / 24452 GPM 222526 GPM997.0 300 / 150 80 / 157 ·INNER CASING JOINTS TO BE SEAL WELDED. ALUMINUM PAINT ON ALL
EXTERIOR SURFACES, GALVANIZED OUTER CASING. FURNISH WITH STACK
ADAPTER PLATES. VERIFY BOILER STACK CONNECTION SIZE PRIOR TO
ORDERING.
·BOILER EFFICIENCY WITH ECONOMIZER = 87.9%
·TOTAL HEAT RECOVERED: 1,450,000 BTUH
PRESSURE SAFETY RELIEF VALVES
DESIGNATION SERVES CAPACITY
( LBS/HR )
PRESSURE RELIEF
SETTING ( PSIG )
REMARKS
SRV-1,2,3 1 1
1 FURNISHED WITH BOILERS, CAPACITY AND SIZE PER BOILER'S MANUFACTURER. 3 EACH PER BOILER.
B-3
STEAM TRAPS
REMARKS
MIN. DIFF.
PRESSURE
(PSIG )
MAX. INLET
PRESSURE
(PSIG )
CAPACITY
(LBS/HR)
CONDENSATE
LOAD
(LBS/HR)
SERVESTYPEDESIGNATION
ST-1 302400 110800INVERTED
BUCKET
HIGH PRESSURE MAIN FOR HIGH PRESSURE MAIN - DRIP LEG
ST-2 2400 15200INVERTED
BUCKET
LOW PRESSURE MAIN FOR LOW PRESSURE - DRIP LEG
ST-3 2300 15110F & T UNIT HEATERS FOR STEAM RETURN FROM UNIT HEATERS
UNIT HEATERS - STEAM
DESIGNATION REFERENCE
PRODUCT
AIR FLOW
RATE
(CFM)
AIR
EDB / LDB
(ºF) VOLTS/PHASE
STEAM
FLOW RATE
(LBS/HR)
STEAM
PRESSURE
(PSIG)
ROTATION
(RPM)
MOTOR
SIZE
(MHP)
ELECTRICAL
REMARKSSERVES
HEATING
CAPACITY
(MBH)
UH-1 TRANE P-102 1180 123 106 15 850 1/8 FURNISH WITH THERMOSTAT AND CONTROL VALVE PACKAGE.277 / 1Ø101.8BOILER
ROOM
MODEL
WATER SOFTNER SYSTEM
DESIGNATION
VALVE
SIZE
(IN)
TOTAL
GRAIN
EXCHANGED
LEAVING WTR
HARDNESS
(MG/L)
BACKWASH
FLOW
(GPM)
BRINE TANK AND
SALT CAPACITY (LBS)
DXH(IN)
PRE-REVERSE
OSMOSIS FLOW
(GPM)
MIN/PEAK FLOW
(GPM) REMARKS
NALCO#011-
SLDFVLEX.88WS-1 3"67
(4500 LBS)
(50" X 60")401115 / 270 1,800,00,000 THE WATER SOFTENER SHALL BE ULTRA SOFT DUPLEX ALTERNATING UNIT. CONTRACTOR
SHALL PROVIDE A COMPLETE SYSTEM, INSTALLED AND PIPED WITH PACKAGED CONTROLS.
UNIT WILL HAVE TWO(2) INDIVIDUAL FRP PRESSURE VESSEL SHARING ONE BRINE SYSTEM.
THE SYSTEM SHALL PROVIDE CONTINUOUS 24-HOUR SOFTENED WATER TO BOILERS.
RESIN VOL.
PER TANK
(FT )
REFERENCE
PRODUCT
LOUVERS
DESIGNATION
PRESSURE
DROP
(IN. WATER)
FINISH
WIDTH
(IN.)
HEIGHT
( IN. )
DEPTH
( IN. )
MAXIMUM
AIR FLOW
( CFM )
TYPE REMARKS
AMERICAN WARMING
& VENTILATINGL-1 0.0515,0006"156"144"DRAINABLE
BLADE
MATCH
EXISTING
BUILDING
EXTERIOR
WINDOW COLOR
FURNISH WITH BIRD SCREEN, WIND DRIVEN RAIN LOUVER.
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M601
SCHEDULES AND LEGEND -
MECHANICAL
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
File details come from the government source that posted it. Updated .