E202.pdf
PDF 509 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
E202
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO BELOW
4 3.4
2.4 1.4 1
H
E
D
B
A
KEYED NOTES: GENERAL NOTES:
1. MODULATOR VALVES. 120V. VERIFY EXACT LOCATION
WITH MECHANICAL.
2. FLOW METER ON FIRST STAGE OF ECONOMIZER. 120V.
VERIFY EXACT LOCATION WITH MECH.
1. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING POWER TO
ALL MECHANICAL VALVES AND METERS REQUIRING 120V POWER. SEE
MECHANICAL FLOOR PLANS AND CONTROL DRAWINGS.
2. EXISTING PANELS "NH-7-1," "NH-7-2," "NL-7-1," "NL-7-1B," AND "NL-7-2" ON
THE SECOND FLOOR HAVE APPROXIMATELY 20 CIRCUITS TOTAL THAT ARE
"ON" BUT ARE NOT LABELED. CONTRACTOR TO TRACE OUT CIRCUITS TO
VERIFY WHAT EACH SERVES AND UPDATE (TYPEWRITTEN) PANEL
SCHEDULES ACCORDINGLY.
3. GENERIC LABELS SUCH "PANEL A" SHALL BE UPDATED WITH ACTUAL
SERVED DEVICES OR EQUIPMENT AS WELL..
TO BELOW
"NH-7-2" - 2
"NH-7-2" - 4
UH-1 UH-1
UH-1
UH-1UH-1
UH-1
B-3
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
E202
BOILER #3 INSTALLATION -
MEZZANINE FLOOR PLAN -
ELECTRICAL NEW
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
1/4" = 1’−0"
BOILER #3 INSTALLATION − MEZZANINE FLOOR PLAN − ELECTRICAL NEW
GENERAL NOTE:
CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO
BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.
File details come from the government source that posted it. Updated .