E101.pdf

PDF 735 KB Posted

Attached to
Boiler #3 Replacement
Solicitation number
14-223-SOL-00059
Issued by

About this file

E101

View the file

Other files

File Type Posted
Amendment_1.pdf PDF
M303.pdf PDF
M200.pdf PDF
M306.pdf PDF
M501.pdf PDF
S102.pdf PDF
E301.pdf PDF
M403.pdf PDF
M402.pdf PDF
M103.pdf PDF
Attachment_J-1_Specifications.pdf PDF
M305.pdf PDF
M601.pdf PDF
E401.pdf PDF
M702.pdf PDF
G100.pdf PDF
M307.pdf PDF
M203.pdf PDF
E102.pdf PDF
Attachment_J-2_Drawings.pdf PDF
M202.pdf PDF
M302.pdf PDF
M304.pdf PDF
Attachment_J-4_FDA_Form_3391.pdf PDF
M401.pdf PDF
M701.pdf PDF
M201.pdf PDF
S101.pdf PDF
M301.pdf PDF
M102.pdf PDF
E201.pdf PDF
E202.pdf PDF
Solicitation_14-223-SOL-00059.pdf PDF
M204.pdf PDF
Attachment_J-3_General_Decision_Number_AR140125.pdf PDF
M100.pdf PDF
M101.pdf PDF
M104.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING

WATER

TUBE

BOILER

#1

EXISTING

WATER

TUBE

BOILER

#1

CONTROL

PANEL

1. DISCONNECT AND REMOVE POWER AND CONTROL WIRING FROM EXISTING WATER TUBE

BOILER #1.

2. DISCONNECT AND REMOVE POWER AND ALL CIRCUITRY FROM EXISTING FUEL OIL PUMP.

3. EXISTING GENERATOR, ELECTRICAL DISONNECT AND FUEL LINES TO BE REMOVED.

DISPOSE OF FUEL OIL IN ACCORDANCE OF STATE REQUIREMENTS, SEE SPEC FOR

GENERATOR REMOVAL.

4 3.4

2.4 1.4 1

H

E

D

B

A

KEYED NOTES:

EXISTING WP/GFI

RECEPTACLE

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

E101

BOILER #3 INSTALLATION -

FIRST FLOOR PLAN -

ELECTRICAL DEMOLITION

03-24-14

01-13-0018

B ui ld in g

B oi le r #3

R ep la ce m en t Je ffe rs on L ab or at or ie s

F oo d an d D ru g

A dm in is tr at io n

N C

T R

R d

Je ffe rs on

, A R

CONSTRUCTION

DOCUMENT

1/4" = 1’−0"

BOILER #3 INSTALLATION − FIRST FLOOR PLAN − ELECTRICAL DEMOLITION

GENERAL NOTE:

CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO

BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.