M102.pdf
PDF 786 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M102
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
CONDENSATE
STORAGE
TANK
BSE-1BSE-2
EXISTING WATER
TUBE BOILER 1
TO BE REMOVED
10" BFW
E X
IS
T
IN
G
4"
S T
E A
M H
E A
D E
R
4 3.4
2.4 1.4 1
H
E
D
B
A
DEMOLITION KEYED NOTES:
1 EXISTING WATER TUBE BOILER #1 AND
ASSOCIATED EQUIPMENT TO BE REMOVED
UNDER BOILER 3 INSTALLATION.
EXISTING LOOP STEAM HEADER TO BE REMOVED.
EXISTING BOILER SAMPLING PIPING TO BE
REMOVED.
EXISTING STEAM VALVE TO BE REMOVED.
EXISTING PIPES TO BE REMOVED.
EXISTING STRUCTURAL SUPPORT COLUMN TO
REMAIN. PROTECT AND SUPPORT DURING
BOILER DEMOLITION.
EXISTING OVERHEAD DOOR TO REMAIN.
EXISTING STEAM RETURN (SR) DOWN. REFER TO
M101 FOR CONTINUATION.
EXISTING LOUVER TO REMAIN.
ALL EXISTING FEEDWATER PIPING TO BE
REMOVED.
REMOVE ABANDONED PIPING AND ASSOCIATED
WITH EXISTING DEAERATOR TANKS. THIS
ADDITIVE OPTION #1.
REMOVE EXISTING FEEDWATER PINING
ASSOCIATED WITH EXISTING FEEDWATER PUMP.
THIS IS ADDITIVE OPTION #2.
B-1 B-2
4 4 4
1 1/2" BD
1" BD
3" NG
14" S100
4" SCW
4" V
4" V
4" SCW
4" SCW
4" SCW
4" SCW
2 1/2" SCW
2 1/2" SCW4" BFW
1" BFW
4" PCR
UPDN
UP
4" SR
8" S100
1" FOS
3/4" FOR
1 1/2" DCW
4" V
4" SR
1" SR
1" SR DNDN
UP
3" NG
4" FOS
1" SR
4" V
4" SCW
6" NG
1" SR
UP
1" FOR
1" FOS
3" BFW
8" S100
DN
1" BFW
4" BFW
4" BFW
2 1/2" SCW 2 1/2" SCW
4" SCW
4" V
UP
DN
UP
GENERAL DEMOLITION NOTES:
1. ALL EXISTING EQUIPMENT, PIPING, VALVES TO
REMAIN UNLESS OTHERWISE NOTED.
EXISTINGEXISTING
4" V
4" V
6" SR
3" SR
4" OF
6" SR
6" S100
DOWN
1" BD
1" BD
6" SR
ADDITIVE OPTIONS
OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION #2
OPTION #3
OPTION #4
REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION #5
OPTION #6
REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.
NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.
NEW EMERGENCY GENERARTOR.
OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M102
BOILER #3 INSTALLATION -
MEZZANINE FLOOR PLAN -
MECHANICAL DEMOLITION
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
1/4" = 1’−0"
BOILER #3 INSTALLATION − MEZZANINE FLOOR PLAN − MECHANICAL DEMOLITION
GENERAL NOTE:
CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO
BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.
File details come from the government source that posted it. Updated .