M203.pdf
PDF 542 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M203
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12" HEADER 12" HEADER
3" S15
24"ø
4 3.4
2.4 1.4 1
H
E
D
B
A
8" S
8" S
KEYED NOTES:
1 PROVIDE NEW HANDRAIL SYSTEM AROUND FLOOR
OPENING WHERE EXISTING WATER TUBE BOILER #1
WAS LOCATED. ADD HANDRAIL TO BACK SIDE OF OLD
BOILER CONNECT TO THE EXISTING HANDRAIL SYSTEM.
NEW 8" S100 DOWN TO CONNECTION AT NEW FIRE TUBE
BOILER #3 ( B-3 ).
CONNECT NEW 8" S100 TO 12" STEAM HEADER.
NEW 24" BOILER STACK UP THRU ROOF.
CONNECT NEW 12" S100 STEAM PIPE AT ISOLATION
VALVE ON EXISTING 12" S100 STEAM HEADER
CONNECT NEW 12" S100 STEAM PIPE TO TOP OF
EXISTING 14" S100 STEAM PIPE. SUPPLY HIGH
PRESSURE STEAM TO CAMPUS.
NEW DRIP LEG & 3" SR PIPE CONNECTED TO BOTTOM
OF NEW 14" STEAM PIPE.
8" S100 DOWN TO EXISTING FIRE TUBE BOILER #2 ( B-2 ).
8" S100 DOWN TO EXISTING FIRE TUBE BOILER #1 ( B-1).
EXISTING 24" BOILER STACK UP THRU ROOF AND DOWN
TO EXISTING FIRE TUBE BOILER #2 ( B-2 ).
EXISTING 24" BOILER STACK UP THRU ROOF AND DOWN
TO EXISTING FIRE TUBE BOILER #1 ( B-1 ).
EXISTING STEAM HEADER ISOLATION VALVE
EXISTING 14" HIGH PRESSURE STEAM SUPPLY TO
CAMPUS. TO REMAIN.
EXISTING GRATING FLOORING.
NEW 6" S100 STEAM PIPE FOR TEMPORARY BOILER.
2" SR
8" S100 12" S100
14" S100
OPEN TO BELOWOPEN TO BELOWOPEN TO BELOW
24"ø 24"ø
4" S100
8" S100
12" S100
4" S100
ST-1
8" S100 8" S100
14" S100
8" S
2" S100
1" SR
10" S100
14 14
1" SR
NC
NC
6" VTR
6" V
6" BFW2" BFW
4" SCW
1" D
1" DCW
12 12 12
6" S100
6" S100
ADDITIVE OPTIONS
OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION #2
OPTION #3
OPTION #4
REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION #5
OPTION #6
REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.
NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.
NEW EMERGENCY GENERARTOR.
OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M203
BOILER #3 INSTALLATION -
SECOND FLOOR PLAN -
MECANIAL NEW
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT 1/4" = 1’−0"
BOILER 3 INSTALLATION − SECOND FLOOR PLAN − MECHANICAL NEW
GENERAL NOTE:
CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO