M203.pdf

PDF 542 KB Posted

Attached to
Boiler #3 Replacement
Solicitation number
14-223-SOL-00059
Issued by

About this file

M203

View the file

Other files

File Type Posted
Amendment_1.pdf PDF
M303.pdf PDF
M200.pdf PDF
M306.pdf PDF
M501.pdf PDF
S102.pdf PDF
M702.pdf PDF
G100.pdf PDF
M307.pdf PDF
E102.pdf PDF
Attachment_J-2_Drawings.pdf PDF
M202.pdf PDF
M302.pdf PDF
M304.pdf PDF
Attachment_J-4_FDA_Form_3391.pdf PDF
M401.pdf PDF
M701.pdf PDF
E301.pdf PDF
M403.pdf PDF
M402.pdf PDF
M103.pdf PDF
Attachment_J-1_Specifications.pdf PDF
E101.pdf PDF
M305.pdf PDF
M601.pdf PDF
E401.pdf PDF
M201.pdf PDF
S101.pdf PDF
M301.pdf PDF
M102.pdf PDF
E201.pdf PDF
E202.pdf PDF
Solicitation_14-223-SOL-00059.pdf PDF
M204.pdf PDF
Attachment_J-3_General_Decision_Number_AR140125.pdf PDF
M100.pdf PDF
M101.pdf PDF
M104.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12" HEADER 12" HEADER

3" S15

24"ø

4 3.4

2.4 1.4 1

H

E

D

B

A

8" S

8" S

KEYED NOTES:

1 PROVIDE NEW HANDRAIL SYSTEM AROUND FLOOR

OPENING WHERE EXISTING WATER TUBE BOILER #1

WAS LOCATED. ADD HANDRAIL TO BACK SIDE OF OLD

BOILER CONNECT TO THE EXISTING HANDRAIL SYSTEM.

NEW 8" S100 DOWN TO CONNECTION AT NEW FIRE TUBE

BOILER #3 ( B-3 ).

CONNECT NEW 8" S100 TO 12" STEAM HEADER.

NEW 24" BOILER STACK UP THRU ROOF.

CONNECT NEW 12" S100 STEAM PIPE AT ISOLATION

VALVE ON EXISTING 12" S100 STEAM HEADER

CONNECT NEW 12" S100 STEAM PIPE TO TOP OF

EXISTING 14" S100 STEAM PIPE. SUPPLY HIGH

PRESSURE STEAM TO CAMPUS.

NEW DRIP LEG & 3" SR PIPE CONNECTED TO BOTTOM

OF NEW 14" STEAM PIPE.

8" S100 DOWN TO EXISTING FIRE TUBE BOILER #2 ( B-2 ).

8" S100 DOWN TO EXISTING FIRE TUBE BOILER #1 ( B-1).

EXISTING 24" BOILER STACK UP THRU ROOF AND DOWN

TO EXISTING FIRE TUBE BOILER #2 ( B-2 ).

EXISTING 24" BOILER STACK UP THRU ROOF AND DOWN

TO EXISTING FIRE TUBE BOILER #1 ( B-1 ).

EXISTING STEAM HEADER ISOLATION VALVE

EXISTING 14" HIGH PRESSURE STEAM SUPPLY TO

CAMPUS. TO REMAIN.

EXISTING GRATING FLOORING.

NEW 6" S100 STEAM PIPE FOR TEMPORARY BOILER.

2" SR

8" S100 12" S100

14" S100

OPEN TO BELOWOPEN TO BELOWOPEN TO BELOW

24"ø 24"ø

4" S100

8" S100

12" S100

4" S100

ST-1

8" S100 8" S100

14" S100

8" S

2" S100

1" SR

10" S100

14 14

1" SR

NC

NC

6" VTR

6" V

6" BFW2" BFW

4" SCW

1" D

1" DCW

12 12 12

6" S100

6" S100

ADDITIVE OPTIONS

OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION #2

OPTION #3

OPTION #4

REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION #5

OPTION #6

REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.

NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.

NEW EMERGENCY GENERARTOR.

OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

M203

BOILER #3 INSTALLATION -

SECOND FLOOR PLAN -

MECANIAL NEW

03-24-14

01-13-0018

B ui ld in g

B oi le r #3

R ep la ce m en t Je ffe rs on L ab or at or ie s

F oo d an d D ru g

A dm in is tr at io n

N C

T R

R d

Je ffe rs on

, A R

CONSTRUCTION

DOCUMENT 1/4" = 1’−0"

BOILER 3 INSTALLATION − SECOND FLOOR PLAN − MECHANICAL NEW

GENERAL NOTE:

CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO

BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.

File details come from the government source that posted it. Updated .