M202.pdf

PDF 628 KB Posted

Attached to
Boiler #3 Replacement
Solicitation number
14-223-SOL-00059
Issued by

About this file

M202

View the file

Other files

File Type Posted
Amendment_1.pdf PDF
M201.pdf PDF
S101.pdf PDF
M301.pdf PDF
M102.pdf PDF
E201.pdf PDF
E202.pdf PDF
Solicitation_14-223-SOL-00059.pdf PDF
M204.pdf PDF
Attachment_J-3_General_Decision_Number_AR140125.pdf PDF
M100.pdf PDF
M101.pdf PDF
M104.pdf PDF
M702.pdf PDF
G100.pdf PDF
M307.pdf PDF
M203.pdf PDF
E102.pdf PDF
Attachment_J-2_Drawings.pdf PDF
M302.pdf PDF
M304.pdf PDF
Attachment_J-4_FDA_Form_3391.pdf PDF
M401.pdf PDF
M701.pdf PDF
M303.pdf PDF
M200.pdf PDF
M306.pdf PDF
M501.pdf PDF
S102.pdf PDF
E301.pdf PDF
M403.pdf PDF
M402.pdf PDF
M103.pdf PDF
Attachment_J-1_Specifications.pdf PDF
E101.pdf PDF
M305.pdf PDF
M601.pdf PDF
E401.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BSE-3

BSE-2

BSE-1

3" NG

6" SR

2" S15

2" S15

3" S15

4" SCW

4" SCW

1" DCW

3/4" S15

4 3.4

2.4 1.4 1

H

E

D

B

A

6" NG

2" S15

1" FOR

1" FOS

3/4" SR

3/4" SR

M303

EXISTING

4" PCR

UP

EXISTING

4" PCR

DN

EXISTING

4" SR UP

1" FOR

1" FOS

1"

FOS/FOR

DN

KEYED NOTES:

NEW 24" ROUND BOILER FLUE UP THRU ROOF.

EXISTING FIRE TUBE BOILER.

NEW 2-STAGE BOILER STACK ECONOMIZER HEAT

EXCHANGER BSE-3. REFER TO STRUCTURAL

DRAWINGS FOR SUPPORT INFORMATION.

NEW 8" STEAM PIPING UP TO NEW 12" STEAM HEADER

ON SECOND FLOOR.

3" FEEDWATER UP.

2-1/2" MAKE-UP WATER FROM BLOWDOWN HEAT

EXCHANGER.

NEW STEAM RELIEF VENTS.

1" FUEL OIL SUPPLY AND RETURN DOWN TO FUEL OIL

RECIRCULATING TANK.

NEW CONTROL VALVE.

NEW FIRE TUBE WATER BOILER #3 ( B-3 ).

NEW CATWALK, PLATFORM.

NEW SAFETY RELIEF VALVE SRV-1.

NEW CAPPED PIPE.

NEW 1" SR PIPING UP TO 14" HEADER ON SECOND

FLOOR.

CONNECT NEW FOS/FOR TO VERTICAL PIPE STUBS.

CONNECT NEW 2 1/2" SCW TO EXISTING 2 1/2" SCW AT

POINT INDICATED.

CONNECT NEW 4" BOILER FEED WATER AT POINT

INDICATED.

NEW PLATFORM FOR STACK ECONOMIZER.

EXISTING STEAM RETURN (SR) UP. REFER TO M203 FOR

CONTINUATION.

EXISTING STEAM RETURN (SR) UP. REFER TO M201 FOR

CONTINUATION.

NEW STEAM UNIT HEATER AND ASSOCIATED S15 STEAM

PIPING. THIS IS ADDITIVE OPTION #4.

S15 STEAM PIPE UP.

INSTALL DRIP LEG ASSEMBLY AND CONNECT TO SR

PIPE FROM S15 RETURN.

2" STEAM RETURN PIPE, ROUTE TO SURGE TANK.

3" NATURAL GAS PIPE ROUTED AS SHOWN FOR

TEMPORARY BOILER.

NEW 1" FUEL OIL RETURN/ FUEL OIL SUPPLY ROUTED

AS SHOWN FOR TEMPORARY BOILER. STUB OUT THRU

EXTERIOR WALL AT SAME ELEVATION AS NATURAL GAS

PIPE WITH PIPE CAP.

4" BOILER FEEDWATER PIPE ROUTED AS SHOWN FOR

TEMPORARY BOILER. STUB-OUT THROUGH EXTERIOR

WALL AS SAME ELEVATION AS NATURAL GAS PIPE, S100

PIPE.

6" S100 STEAM PIPE ROUTED AS SHOWN TO

TEMPORARY BOILER.

4" V

UP

10B-3

3" NG

3" NG

6" NG

6" NG

3" NG

6" NG

4" FOS

2" FOR

2" S100

4" SR

4" V

4" SR

1 1/2" DCW

3" NG

1" FOS

3/4" FOR

6" BFW2" BFW

1 1/2" DCW

4" SCW

2 1/2" SCW

2 1/2" SCW

4" SCW

4" SCW

4" SCW

4" BFW

1" BFW

4" SCW

4" SCW

2 1/2" SCW

2 1/2" SCW

1" BFW

6" BFW

4" BFW

1" BFW

4" V4" V

4" V

4" V

4" V

4" V

1 1/4" V

4" SCW

1" SR

4" SCW

4" SCW

1" SR 1" SR

6" SR

1" BFW

2 1/2" SCW

4" BFW

2 1/2" SCW

1" DCW

UH-1

UH-1

UH-1

UH-1

UH-1UH-1

3" NG

3" NG

3" NG

281" FOR

1" FOS

1"

1"

1" FOR

1" FOS

6" BFW 6" S100

ADDITIVE OPTIONS

OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION #2

OPTION #3

OPTION #4

REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION #5

OPTION #6

REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.

NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.

NEW EMERGENCY GENERARTOR.

OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

M202

BOILER #3 INSTALLATION -

MEZZANINE FLOOR PLAN -

MECHANICAL NEW

03-24-14

01-13-0018

B ui ld in g

B oi le r #3

R ep la ce m en t Je ffe rs on L ab or at or ie s

F oo d an d D ru g

A dm in is tr at io n

N C

T R

R d

Je ffe rs on

, A R

CONSTRUCTION

DOCUMENT

1/4" = 1’−0"

BOILER 3 INSTALLATION − MEZZANINE FLOOR PLAN − MECHANICAL NEW

GENERAL NOTE:

CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO

BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.