M202.pdf
PDF 628 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M202
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BSE-3
BSE-2
BSE-1
3" NG
6" SR
2" S15
2" S15
3" S15
4" SCW
4" SCW
1" DCW
3/4" S15
4 3.4
2.4 1.4 1
H
E
D
B
A
6" NG
2" S15
1" FOR
1" FOS
3/4" SR
3/4" SR
M303
EXISTING
4" PCR
UP
EXISTING
4" PCR
DN
EXISTING
4" SR UP
1" FOR
1" FOS
1"
FOS/FOR
DN
KEYED NOTES:
NEW 24" ROUND BOILER FLUE UP THRU ROOF.
EXISTING FIRE TUBE BOILER.
NEW 2-STAGE BOILER STACK ECONOMIZER HEAT
EXCHANGER BSE-3. REFER TO STRUCTURAL
DRAWINGS FOR SUPPORT INFORMATION.
NEW 8" STEAM PIPING UP TO NEW 12" STEAM HEADER
ON SECOND FLOOR.
3" FEEDWATER UP.
2-1/2" MAKE-UP WATER FROM BLOWDOWN HEAT
EXCHANGER.
NEW STEAM RELIEF VENTS.
1" FUEL OIL SUPPLY AND RETURN DOWN TO FUEL OIL
RECIRCULATING TANK.
NEW CONTROL VALVE.
NEW FIRE TUBE WATER BOILER #3 ( B-3 ).
NEW CATWALK, PLATFORM.
NEW SAFETY RELIEF VALVE SRV-1.
NEW CAPPED PIPE.
NEW 1" SR PIPING UP TO 14" HEADER ON SECOND
FLOOR.
CONNECT NEW FOS/FOR TO VERTICAL PIPE STUBS.
CONNECT NEW 2 1/2" SCW TO EXISTING 2 1/2" SCW AT
POINT INDICATED.
CONNECT NEW 4" BOILER FEED WATER AT POINT
INDICATED.
NEW PLATFORM FOR STACK ECONOMIZER.
EXISTING STEAM RETURN (SR) UP. REFER TO M203 FOR
CONTINUATION.
EXISTING STEAM RETURN (SR) UP. REFER TO M201 FOR
CONTINUATION.
NEW STEAM UNIT HEATER AND ASSOCIATED S15 STEAM
PIPING. THIS IS ADDITIVE OPTION #4.
S15 STEAM PIPE UP.
INSTALL DRIP LEG ASSEMBLY AND CONNECT TO SR
PIPE FROM S15 RETURN.
2" STEAM RETURN PIPE, ROUTE TO SURGE TANK.
3" NATURAL GAS PIPE ROUTED AS SHOWN FOR
TEMPORARY BOILER.
NEW 1" FUEL OIL RETURN/ FUEL OIL SUPPLY ROUTED
AS SHOWN FOR TEMPORARY BOILER. STUB OUT THRU
EXTERIOR WALL AT SAME ELEVATION AS NATURAL GAS
PIPE WITH PIPE CAP.
4" BOILER FEEDWATER PIPE ROUTED AS SHOWN FOR
TEMPORARY BOILER. STUB-OUT THROUGH EXTERIOR
WALL AS SAME ELEVATION AS NATURAL GAS PIPE, S100
PIPE.
6" S100 STEAM PIPE ROUTED AS SHOWN TO
TEMPORARY BOILER.
4" V
UP
10B-3
3" NG
3" NG
6" NG
6" NG
3" NG
6" NG
4" FOS
2" FOR
2" S100
4" SR
4" V
4" SR
1 1/2" DCW
3" NG
1" FOS
3/4" FOR
6" BFW2" BFW
1 1/2" DCW
4" SCW
2 1/2" SCW
2 1/2" SCW
4" SCW
4" SCW
4" SCW
4" BFW
1" BFW
4" SCW
4" SCW
2 1/2" SCW
2 1/2" SCW
1" BFW
6" BFW
4" BFW
1" BFW
4" V4" V
4" V
4" V
4" V
4" V
1 1/4" V
4" SCW
1" SR
4" SCW
4" SCW
1" SR 1" SR
6" SR
1" BFW
2 1/2" SCW
4" BFW
2 1/2" SCW
1" DCW
UH-1
UH-1
UH-1
UH-1
UH-1UH-1
3" NG
3" NG
3" NG
281" FOR
1" FOS
1"
1"
1" FOR
1" FOS
6" BFW 6" S100
ADDITIVE OPTIONS
OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION #2
OPTION #3
OPTION #4
REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION #5
OPTION #6
REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.
NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.
NEW EMERGENCY GENERARTOR.
OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M202
BOILER #3 INSTALLATION -
MEZZANINE FLOOR PLAN -
MECHANICAL NEW
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
1/4" = 1’−0"
BOILER 3 INSTALLATION − MEZZANINE FLOOR PLAN − MECHANICAL NEW
GENERAL NOTE:
CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO