M100.pdf

PDF 854 KB Posted

Attached to
Boiler #3 Replacement
Solicitation number
14-223-SOL-00059
Issued by

About this file

M100

View the file

Other files

File Type Posted
Amendment_1.pdf PDF
M303.pdf PDF
M200.pdf PDF
M306.pdf PDF
M501.pdf PDF
S102.pdf PDF
M702.pdf PDF
G100.pdf PDF
M307.pdf PDF
M203.pdf PDF
E102.pdf PDF
Attachment_J-2_Drawings.pdf PDF
M202.pdf PDF
M302.pdf PDF
M304.pdf PDF
Attachment_J-4_FDA_Form_3391.pdf PDF
M401.pdf PDF
M701.pdf PDF
E301.pdf PDF
M403.pdf PDF
M402.pdf PDF
M103.pdf PDF
Attachment_J-1_Specifications.pdf PDF
E101.pdf PDF
M305.pdf PDF
M601.pdf PDF
E401.pdf PDF
M201.pdf PDF
S101.pdf PDF
M301.pdf PDF
M102.pdf PDF
E201.pdf PDF
E202.pdf PDF
Solicitation_14-223-SOL-00059.pdf PDF
M204.pdf PDF
Attachment_J-3_General_Decision_Number_AR140125.pdf PDF
M101.pdf PDF
M104.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3" BFW

3" BFW

3" BFW

BlOW-OFF

TANK

4 3.4

2.4 1.4 1

H

E

D

B

A

DEMOLITION KEYED NOTES:

1 EXISTING WATER TUBE BOILER #1 TO BE REMOVED. THIS

ADDITIVE OPTION #6.

EXISTING 4" NATURAL GAS PIPING IN TRENCH UP TO WATER

TUBE BOILER TO BE REMOVED.

EXISTING FUEL OIL PIPING IN TRENCH UP TO WATER TUBE

BOILER TO BE REMOVED.

ADBANDOMED EXISTING 2" NG PIPING INTO OFFICE AREA IN

TRENCH TO REMAIN AND CAPPED.

EXISTING 4" BFW PIPING IN TRENCH UP TO WATER TUBE

BOILER TO BE REMOVED.

EXISTING BLOW DOWN PIPING IN TRECH TO REMAIN.

NOT USED

EXISTING BLOW-OFF TANK TO REMAIN.

EXISTING HIGH PRESSURE NATURAL GAS PIPING IN TRENCH

TO BE REMOVED.

EXISTING FUEL OIL PIPING IN TRENCH TO BE REMOVED.

EXISTING WATER SOFTNER SYSTEM TO BE REMOVED AND

REPLACED WITH NEW. THIS IS ADDITIVE OPTION #5.

4" NG

4" FOS

8" NG

4" NG2" NG

4" BFW

6" DCW

3" BD

3" BD

3" BD 3" BD

3" BD 3" BD6 6

63" BD

2" NG

102" FOS

4" FOS 10

GENERAL DEMOLITION NOTES:

1. ALL EXISTING EQUIPMENT, PIPING, VALVES TO REMAIN

UNLESS OTHERWISE NOTED.

DA-6

B-1

EXISTING

WATER

SOFTENER

TANK

EXISTING

WATER

SOFTENER

TANK

EXISTING

WATER

SOFTENER

TANK

FOS-1

EXISTING

AIR

COMPRESSOR

EXISTING

AIR

STORAGE

TANK

EXISTING

CHEMICAL

TREATMENT

BDHX-1

FOP-1FOP-2

CPS-1

11 11 11

ADDITIVE OPTIONS

OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION #2

OPTION #3

OPTION #4

REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION #5

OPTION #6

REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.

NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.

NEW EMERGENCY GENERARTOR.

OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

M100

BOILER #3 INSTALLATION -

TRENCH PLAN - MECHANICAL

DEMOLITION

03-24-14

01-13-0018

B ui ld in g

B oi le r #3

R ep la ce m en t Je ffe rs on L ab or at or ie s

F oo d an d D ru g

A dm in is tr at io n

N C

T R

R d

Je ffe rs on

, A R

CONSTRUCTION

DOCUMENT

1/4" = 1’−0"

BOILER #3 INSTALLATION − TRENCH PLAN − MECHANICAL DEMOLITION

GENERAL NOTE:

CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO

BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.

File details come from the government source that posted it. Updated .