M301.pdf
PDF 756 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M301
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3.4
E
D
FOP-3
3/4" FOS
3/4" FOR
1" D 1" D 1" D
3" NG
1" BD
3" NG
2" D
3" BFW
3" NG
3" BFW
3" BFW
1 1/2" BFW
3" BFW
2" BD
3" NG
DN
DN
2" D
UP
UP
3" BD
3/4" FOR
UP
DN
2" BD
1 1/2" BFW
3" BFW
2" D
UP
UP
UP
DN
DN
KEYED NOTES
NEW BOILER CONTROL PANEL.
NEW FUEL OIL RECIRCULATION
TANK FOP-3.
8" STEAM PIPING UP TO NEW STEAM
HEADER ON SECOND FLOOR.
PROVIDE FACTORY TESTED ASME
CERTIFIED NON-RETURN VALVE
ASSEMBLY.
24" BOILER FLUE UP TO NEW 2-
STAGE ECONOMIZER. PROVIDE ALL
REQUIRED TRANSITIONS FROM
FLUE TO ECONOMIZER. REFER TO
STRUCTURAL PLANS FOR
STRUCTURAL SUPPORT DETAILS
FOR ECONOMIZER.
NEW 1" DRAIN PIPING DOWN TO
TRENCH.
NEW FIRE TUBE BOILER B-3.
NEW 3"BD DOWN TO TRENCH.
BOILER STACK UP TO ECONOMIZER.
NEW 1"D DOWN TO TRENCH.
1" BD UP TO 8"S100.
1" BD TO BLOWN DOWN HEAT
EXCHANGER BDHX-1.
NEW 2-STAGE ECONOMIZER BSE-3.
24"Ø BOLIER STACK UP TO ROOF.
ECONIMIZER ACCESS PLATFORM.
BOILER ACCESS PLATFORM.
BOILER PLATFORM LADDER.
NEW FLOW METER.
FOS/FOR DOWN TO FLUE OIL
RECIRCULATE TANK BELOW.
NEW 8" S100 STEAM PIPING UP TO
STEAM HEADER ABOVE.
NEW DRIP ELBOW (TYPICAL FOR 3).
NEW SAFETY RELIEF VALVE SRV-1.
3" NATURAL GAS DOWN TO NEW
FIRE TUBE BOILER #3 (B-3).
3" BFW
NEW
3.4
E
D
4" BFW
2 1/2" SCW
1" BFW
4" BFW
1" BFW
1" FOS1" FOR
24"ø
8" S100
8" S100
2 1/2" BFW 2 1/2" BFW2 1/2" BFW 2 1/2" SCW
3" BFW
3" BFW
4" BFW
DN
3" NG
UP
4" V
4" V
4" V
B -3B-3B-3
2 1/2" SCW
4" B
F W
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M301
ENLARGED FLOOR PLANS -
NEW BOILER #3
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
3/4" = 1’−0"
ENLARGED FLOOR PLAN − BOILER #3 AND PLATFORM
3/4" = 1’−0"
ENLARGED FLOOR PLAN − BOILER #3 − ECONOMIZER AND PLATFORM
File details come from the government source that posted it. Updated .