M101.pdf
PDF 917 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M101
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
WATER
TUBE
BOILER
#1
CONTROL
PANEL
EXISTING
AIR
STORAGE
TANK
EXISTING
AIR
COMPRESSOR
EXISTING
WATER
SOFTENER
TANK
EXISTING
WATER
SOFTENER
TANK
EXISTING
WATER
SOFTENER
TANK
EXISTING
BOILER
FEED
PUMP
EXISTING
BOILER
FEED
PUMP
EXISTING
BOILER
FEED
PUMP
EXISTING
CHEMICAL
TREATMENT
CPS-1
BDHX-1
EXISTING WATER
TUBE
BOILER #1
EXISTING 2" FUEL
OIL PIPING FOS/FOR
1" DCW
4" SR 2"
F
O S
FOS-1
CST-1
4" DCW
EXISTING
FIRE TUBE
BOILER #2
EXISTING
FIRE TUBE
BOILER #1
3" BD
3" S15
6" S15
BS-1
1" DCW
4" DCW
3" NG
4 3.4
2.4 1.4 1
H
E
D
B
A
EXISTING FUEL OIL SUPPLY PUMP TO BE REMOVED.
EXISTING WATER TUBE BOILER #1 AND ASSOCIATED
EQUIPMENT AND PIPING TO BE REMOVED UNDER
BOILER #3 INSTALLATION.
EXISTING 4" BOILER FEED WATER PIPING TO BE
REMOVED.
EXISTING STRUCTURAL SUPPORT COLUMN TO
REMAIN. PROTECT AND SUPPORT DURING BOILER
DEMOLITION.
REMOVE EXISTING BLOWDOWN PIPING.
EXISTING NATURAL GAS PIPING TO BE REMOVED.
EXISTING FUEL OIL PIPING TO BE REMOVED.
EXISTING STEAM CONDENSATE RETURN TO BE
REMOVED.
EXISTING WATER SOFTENER SYSTEM TO BE
REMOVED AND REPLACED WITH NEW. THIS IS
ADDITIVE OPTION #5.
ALL EXISTING PIPING TO WATER SOFTER TO BE
REMOVED,
EXISTING 6" BD TO BE REMOVED.
ALL EXISTING PIPING TO BE REMOVED.
REMOVE ABANDONED PIPING ASSOCIATED WITH
EXISTING FEED WATER SYSTEM. THIS IS ADDITIVE
OPTION #2
REMOVE EXISTING FEEDWATER PUMPS AND ALL
ASSOCIATED FEEDWATER PIPING, CONCRETE,
ETC., PATCH FLOOR AND SMOOTH FINISHED
SURFACE. THIS IS ADDITIVE OPTION #2
REMOVE EXISTING FEEDWATER PIPING IN TRENCH.
THIS IS ADDITIVE OPTION #3
REMOVE EXISTING FUEL OIL DAY TANK.
ALL PIPING ASSOCIATED WITH FUEL OIL DAY TANK
TO BE REMOVED. DISPOSE OF FUEL OIL IN
ACCORDANCE OF STATE REQUIREMENTS, SEE
SPEC FOR GENERATOR REMOVAL.
EXISTING LOUVER TO BE REMOVED. SEE
STRUCTURAL DRAWINGS.
M303
2" FOR
2" FOR
1 1/2" BD
4" BFW
EXISTING 2" DRAIN UP
EXISTING 1" DRAIN
UP AND DN
EXISTING 1" COLD WATER
UP AND DN
4" DCW
6" SR
DEMOLITION KEYED NOTES:
6" SR
4" NG
3" BD
2" FOR
2" FOR
2" FOR
2" FOR 2" FOR
72" FOR
2" FOR 7
1 1/2" SR
1 1/2" SR
EXISTING 6" VENT
1" DCW 4" V
2" FOR 7
4" SR
2" S100 2" FOS
4" NG6" NG
6" SR
UP
GENERAL DEMOLITION NOTES:
1. ALL EXISTING EQUIPMENT, PIPING, VALVES TO
REMAIN UNLESS OTHERWISE NOTED.
EXISTING
EXISTING
FOP-1FOP-2
EXISTINGEXISTING
EXISTING
9 9 9
6" BD DOWN TO
BLOWNDOWN
TANK
6" BD
EXISTING
CONDENSATE
RETURN
PUMPS
ADDITIVE OPTIONS
OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION #2
OPTION #3
OPTION #4
REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION #5
OPTION #6
REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.
NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.
NEW EMERGENCY GENERARTOR.
OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M101
BOILER #3 INSTALLATION -
FIRST FLOOR PLAN -
MECHANICAL DEMOLITION
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
1/4" = 1’−0"
BOILER #3 INSTALLATION − FIRST FLOOR PLAN − MECHANICAL DEMOLITION
GENERAL NOTE:
CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO
BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.
File details come from the government source that posted it. Updated .