M302.pdf
PDF 2 MB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M302
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST FLOOR
0' - 0"
3.4
MEZZANINE
12' - 0"
FIRST FLOOR
0' - 0"
MEZZANINE
FLOOR
12' - 0"
ED
GENERAL NOTES:
1. CONTRACTOR SHALL INSTALL NEW PLATFORMS FOR
NEW FIRE TUBE BOILER AND ECONOMIZER, SIMILAR TO
PLATFORMS SHOWN ON THIS DRAWING.
2. CONTRACTOR SHALL INCLUDE COST OF ANY PIPING
MODIFICATION AS REQUIRED FOR INSTALLING THE ECONOMIZER
PLATFORM ON THE NEW FIRE TUBE BOILER.
3. INSTALLED PIPING AND VALVES SHALL BE MADE
TO ALLOW ACCESSIBILITY TO ALL ISOLATION VALVES.
KEYED NOTES :
STACK ECONOMIZER.
PLATFORM FOR ECONOMIZER
BOILER PLATORM.
BOILER STACK. REFER TO FLOOR PLANS FOR
ROUTING OF THE STACK.
INSTALL PIPING AND VALVES TO ECONOMIZER SO
THAT ACCESS TO ALL ISOLATION VALVES CAN
BE DONE EASILY AT THE ECONOMIZER PLATFORM.
CONTRACTOR SHALL PROVIDE DETAILED
DIMENSIONED PIPING LAYOUT TO ENGINEER/OWNER
FOR REVIEW BEFORE FABRICATION AND INSTALLATION.
STEAM DISCHARGE PIPE.
STEAM RELIEF WENT PIPING.
RELIEF VALVES. REFER TO BOILER SPECIFICATION.
BLOW-DOWN PIPING.
BOILER PLATORM LADDER.
3.4
E
D
M302
M302
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M302
MAIN HEADER SECTIONS
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
1/2" = 1’−0"
SECTION − FRONT ELEVATION − BOILER #3 AND PLATFORMS
1/2" = 1’−0"
SECTION − SIDE ELEVATION − BOILER #3 AND PLATFORMS
BOILER #3 INSTALLATION − BOILER RISER
BOILER #3 INSTALLATION − HVAC ECONOMIZER RISER
1/2" = 1’−0"
ENLARGED PLAN − BOILER #3 PLATFORM
File details come from the government source that posted it. Updated .