M103.pdf

PDF 667 KB Posted

Attached to
Boiler #3 Replacement
Solicitation number
14-223-SOL-00059
Issued by

About this file

M103

View the file

Other files

File Type Posted
Amendment_1.pdf PDF
M303.pdf PDF
M200.pdf PDF
M306.pdf PDF
M501.pdf PDF
S102.pdf PDF
M702.pdf PDF
G100.pdf PDF
M307.pdf PDF
M203.pdf PDF
E102.pdf PDF
Attachment_J-2_Drawings.pdf PDF
M202.pdf PDF
M302.pdf PDF
M304.pdf PDF
Attachment_J-4_FDA_Form_3391.pdf PDF
M401.pdf PDF
M701.pdf PDF
E301.pdf PDF
M403.pdf PDF
M402.pdf PDF
Attachment_J-1_Specifications.pdf PDF
E101.pdf PDF
M305.pdf PDF
M601.pdf PDF
E401.pdf PDF
M201.pdf PDF
S101.pdf PDF
M301.pdf PDF
M102.pdf PDF
E201.pdf PDF
E202.pdf PDF
Solicitation_14-223-SOL-00059.pdf PDF
M204.pdf PDF
Attachment_J-3_General_Decision_Number_AR140125.pdf PDF
M100.pdf PDF
M101.pdf PDF
M104.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING

DA

TANK

EXISTING

WATER

TUBE

BOILER

#1

1-1/2" BLOW DOWN ,

DOWN TO MEZZ.

8" VTR8"

VTR

6" VTR

4" BFW

14" HIGH PRESSURE STEAM

SUPPLY TO CAMPUS, TO REMAIN

6 6

6 6

12" MAIN STEAM HEADER

7 7

14" HIGH PRESSURE STEAM

SUPPLY TO CAMPUS, TO REMAIN

4" V

S

4 3.4

2.4 1.4 1

H

E

D

B

A

8" S

8" S

DEMOLITION KEYED NOTES:

1 EXISTING WATER TUBE BOILER #1 AND

ASSOCIATED EQUIPMENT TO BE REMOVED

UNDER BOILER 3 INSTALLATION.

REMOVE EXISTING STEAM PIPING.

NOT USED

EXISTING MANUAL/ AUXILIARY FEEDWATER

PIPING TO BE REMOVED.

EXISTING BOILER/PLATFORM SUPPORT

COLUMNS TO REMAIN. PROTECT DURING

BOILER DEMOLITION.

REMOVE EXISTING STEAM PIPING AND VALVES.

EXISTING HANDRAILS TO REMAIN. SEE

STRUCTURAL DRAWINGS.

REMOVE ABANDONED PIPING ASSOCIATED

WITH DEAERATOR TANK. THIS IS ADDITIVE

OPTION #1.

REMOVE ADANDONED DEAERATOR TANK. THIS

IS PART OF ADDITIVE OPTION #1.

2" S100

4" S100

8" S100

14" S100

12" S100

8" S1008" S100

12" S100

10" S100

"ø

"ø

1. ALL EXISTING EQUIPMENT, PIPING, VALVES TO

REMAIN UNLESS OTHERWISE NOTED.

2. THE WORK OF TYING EXISTING 14" STEAM HEADER

TO 12" STEAM HEADER SHALL TAKE PLACE DURING

SCHEDULED SHUTDOWN. CONTRACTOR SHALL

COORDINATE WORK WITH BUILDING 7 FACILITY

SERVICES PERSONNEL. CONTRACTOR SHALL HAVE

ALL PIECES OF PIPE PREFABRICATED, SO THE

CONNECTION CAN BE PREFORMED DURING

SHUTDOWN PERIOD.

UP

DN

DN

UP

4" PCR

4" SR

1" DCW

UP

DN

14" S100

6" VTR

UP

DN

UP

DN

10" S100

6" V

7 7

GENERAL DEMOLITION NOTE:

REFER TO

GENERAL

NOTE #2

4" SCW

2" VTR 8

6" SR8

MAK-UP WATER

10" BFW8

4" SCW 8

ADDITIVE OPTIONS

OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION #2

OPTION #3

OPTION #4

REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION #5

OPTION #6

REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.

NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.

NEW EMERGENCY GENERARTOR.

OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

M103

BOILER #3 INSTALLATION -

SECOND FLOOR PLAN -

MECHANICAL DEMOLITION

03-24-14

01-13-0018

B ui ld in g

B oi le r #3

R ep la ce m en t Je ffe rs on L ab or at or ie s

F oo d an d D ru g

A dm in is tr at io n

N C

T R

R d

Je ffe rs on

, A R

CONSTRUCTION

DOCUMENT

1/4" = 1’−0"

BOILER #3 INSTALLATION − SECOND FLOOR PLAN − MECHANICAL DEMOLITION

GENERAL NOTE:

CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO

BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.