M103.pdf
PDF 667 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M103
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
DA
TANK
EXISTING
WATER
TUBE
BOILER
#1
1-1/2" BLOW DOWN ,
DOWN TO MEZZ.
8" VTR8"
VTR
6" VTR
4" BFW
14" HIGH PRESSURE STEAM
SUPPLY TO CAMPUS, TO REMAIN
6 6
6 6
12" MAIN STEAM HEADER
7 7
14" HIGH PRESSURE STEAM
SUPPLY TO CAMPUS, TO REMAIN
4" V
S
4 3.4
2.4 1.4 1
H
E
D
B
A
8" S
8" S
DEMOLITION KEYED NOTES:
1 EXISTING WATER TUBE BOILER #1 AND
ASSOCIATED EQUIPMENT TO BE REMOVED
UNDER BOILER 3 INSTALLATION.
REMOVE EXISTING STEAM PIPING.
NOT USED
EXISTING MANUAL/ AUXILIARY FEEDWATER
PIPING TO BE REMOVED.
EXISTING BOILER/PLATFORM SUPPORT
COLUMNS TO REMAIN. PROTECT DURING
BOILER DEMOLITION.
REMOVE EXISTING STEAM PIPING AND VALVES.
EXISTING HANDRAILS TO REMAIN. SEE
STRUCTURAL DRAWINGS.
REMOVE ABANDONED PIPING ASSOCIATED
WITH DEAERATOR TANK. THIS IS ADDITIVE
OPTION #1.
REMOVE ADANDONED DEAERATOR TANK. THIS
IS PART OF ADDITIVE OPTION #1.
2" S100
4" S100
8" S100
14" S100
12" S100
8" S1008" S100
12" S100
10" S100
"ø
"ø
1. ALL EXISTING EQUIPMENT, PIPING, VALVES TO
REMAIN UNLESS OTHERWISE NOTED.
2. THE WORK OF TYING EXISTING 14" STEAM HEADER
TO 12" STEAM HEADER SHALL TAKE PLACE DURING
SCHEDULED SHUTDOWN. CONTRACTOR SHALL
COORDINATE WORK WITH BUILDING 7 FACILITY
SERVICES PERSONNEL. CONTRACTOR SHALL HAVE
ALL PIECES OF PIPE PREFABRICATED, SO THE
CONNECTION CAN BE PREFORMED DURING
SHUTDOWN PERIOD.
UP
DN
DN
UP
4" PCR
4" SR
1" DCW
UP
DN
14" S100
6" VTR
UP
DN
UP
DN
10" S100
6" V
7 7
GENERAL DEMOLITION NOTE:
REFER TO
GENERAL
NOTE #2
4" SCW
2" VTR 8
6" SR8
MAK-UP WATER
10" BFW8
4" SCW 8
ADDITIVE OPTIONS
OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION #2
OPTION #3
OPTION #4
REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION #5
OPTION #6
REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.
NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.
NEW EMERGENCY GENERARTOR.
OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M103
BOILER #3 INSTALLATION -
SECOND FLOOR PLAN -
MECHANICAL DEMOLITION
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
1/4" = 1’−0"
BOILER #3 INSTALLATION − SECOND FLOOR PLAN − MECHANICAL DEMOLITION
GENERAL NOTE:
CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO
BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.