G100.pdf
PDF 1 MB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
G100
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M702.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TS
A TE FO
REGISTERED
PROFESSIONAL
ENGINEER
ARKANSAS
NO. 7512H
A M
ID HABI B
I
OOOOOOOO TME, INC.
ER
ENNA
CCCC
RK
A
S -A S GE N I
No. 178
NNNN
TTTT
TTTTRRRRAAAAAAAA TTTT
RRRRPPPP
OOOORRRR
EEEEE IIIIRRRR SSSSGGGGEEE
IIII
TME, Inc. Engineers a division of TME, Inc.
DATE:
I HEREBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS HAVE BEEN PREPARED BY ME,
OR UNDER MY SUPERVISION. I FURTHER CERTIFY THAT TO THE BEST OF MY KNOWLEDGE
THESE PLANS AND SPECIFICATIONS ARE AS REQUIRED BY LAW AND IN COMPLIANCE WITH
PLUMBING AND MECHANICAL CODE FOR THE STATE OF ARKANSAS.
Little Rock, Arkansas 72205−1757 5800 Evergreen Drive
Phone: (501) 666−6776 Fax: (501) 663−8888 tme@tmecorp.com
H. HABIBI, P.E.
TME PROJECT NO: 01−13−0018
Jefferson Laboratories
Food and Drug Administration 3900 NCTR Rd
Jefferson, AR 72079
Building 7 - Boiler #3 Replacement
03-24-14
01-13-0018
SHEET
NUMBER SHEET NAME
E101 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION
E102 BOILER #3 INSTALLATION - FAN PLATFORM - ELECTRICAL DEMOLITION
E201 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - ELECTRICAL NEW
E202 BOILER #3 INSTALLATION - MEZZANINE FLOOR PLAN - ELECTRICAL NEW
E301 PANELS - ELECTRCIAL
E401 SCHEDULE, LEGEND, NOTES AND DETAIL - ELECTRICAL
S101 STRUCTURAL SECOND FLOOR PLAN
S102 STRUCTURAL ELEVATIONS & DETAILS
SHEET
NUMBER SHEET NAME
G100 COVER SHEET
M100 BOILER #3 INSTALLATION - TRENCH PLAN - MECHANICAL DEMOLITION
M101 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - MECHANICAL DEMOLITION
M102 BOILER #3 INSTALLATION - MEZZANINE FLOOR PLAN - MECHANICAL DEMOLITION
M103 BOILER #3 INSTALLATION - SECOND FLOOR PLAN - MECHANICAL DEMOLITION
M104 BOILER #3 INSTALLATION - FAN PLATFORM - MECHANICAL DEMOLITION
M200 BOILER 3 INSTALLATION - TRENCH PLAN - MECHANICAL NEW
M201 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - MECHANICAL NEW
M202 BOILER #3 INSTALLATION - MEZZANINE FLOOR PLAN - MECHANICAL NEW
M203 BOILER #3 INSTALLATION - SECOND FLOOR PLAN - MECANIAL NEW
M204 BOILER 3 INSTALLATION - FAN PLATFORM - MECHANICAL NEW
M301 ENLARGED FLOOR PLANS - NEW BOILER #3
M302 MAIN HEADER SECTIONS
M303 NEW LOUVER INSTALL SECTIONS
M304 SECTION PLAN VIEW EXISTING WATER TUBE BOILER - ASBESTOS ABATMENT
M305 SECTION SIDE ELEVATION EXISTING WATER TUBE BOILER - ASBESTOS ABATMENT
M306 BOILER #3 INSTALLATION - HVAC PIPING RISER DEMOLITION
M307 BOILER #3 INSTALLATION - HVAC PIPING RISER - MECHANICAL NEW
M401 DETAILS - MECHANICAL
M402 DETAILS - MECHANICAL
M403 DETAILS - MECHANICAL
M501 PIPING DIAGRAMS/FLOWS
M601 SCHEDULES AND LEGEND - MECHANICAL
M701 CONTROLS - MECHANICAL
M702 CONTROLS - MECHANICAL
DRAWING INDEX
File details come from the government source that posted it. Updated .