M401.pdf
PDF 416 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M401
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M701.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1-1/4"
2"
2"2"
2"
1"
2"
FOR
F O
S
F O
R
FOS
FLOW
METER
FM
P S
S
NEW FIRE TUBE BOILER #3 FUEL OIL PUMP
LP P
P
KEYED NOTES:
BURNER
NEW BOILER # 3
AIR COMPRESSOR
ASSEMBLY
EXISTING
DUPLEX
FUEL
PUMP
PACKAGE
FUEL PUMP #2
FUEL PUMP #1
FROM EXISTING
FUEL OIL STORAGE
TANKS
FROM EXISTING FUEL
OIL STORAGE TANKS
PRESSURE
GAUGE
PRESSURE GAUGE
ISOLATION
VALVE AT
BUILDING
DOUBLE SUCTION STRAINER
ISOLATION
VALVE AT
BUILDING
(INSIDE)
1/2" UL
RATED
PRESSURE
HOSE
FOS
FOR
BACK
PRESSURE
REGULATOR
SET AT 5 PSI
PRESS. RATED
FLEXIBLE, FUEL
OIL
CONNECTIONS
1-1/4"
UL RATED
BALL VALVES
(TYP.)
1/2" DRAIN
PLUG
BOILER #3
CIRCULATING
OIL TANK
BOILER
PUMP
GENERAL NOTE:
OIL SUPPLY
OIL STRAINER
OIL RETURN
OIL PUMP
OIL PRESSURE REGULATING VALVE
OIL PRESSURE SENSOR
OIL PRESSURE GAUGE
SECONDARY OIL STRAINER
OIL METERING VALVE
MAIN OIL VALVE, NORMALLY CLOSED
SAFETY OIL VALVE, NORMALLY CLOSED
NOZZLE OIL PRESSURE GAUGE
AIR ATOMIZING OIL NOZZLE
AIR COMPRESSOR
AIR BLEED NEEDLE VALVE
COMPRESSOR DAMPENING TANK
AIR CHECK VALVE
LOW ATOMIZING AIR SWITCH
NOZZLE AIR PRESSURE GAUGE
TO EXISTING FIRE TUBE BOILERS.
FOR NEW FIRE TUBE BOILER #3 B-3.
PRESSURE GAUGE 0 - 10 PSIG.
FUEL OIL FLOW METERS FURNISHED
AND INSTALLED WITH BOILER.
1. THE LOCATION OF THE FUEL OIL
FLOW METERS SHOWN ON
DETAIL #1. IS FOR
REFERENCE ONLY. VERIFY
THE EXACT LOCATION &
QUANTITY OF THE METERS (ONE
FOR SUPPLY, ONE FOR
RETURN) WITH BOILER
MANUFACTURER.
22 1
8 9
18 19
TO TEMPORARY
BOILER
1"
1"
G G
VENT SIZE IN.FUEL SSO VALVE SIZE IN.
4-5
2 1/2-3
6 2 1/2
1 1/4
1/2-1 1/2
2 1
3/4
PRV
G
G
FILTER
G
V
V
VV
V
4'-0" MAX.
NOTES:
3. VENT HEADER SAME SIZE AS MAIN BURNER VENT.
DIRT POCKETS
3/8" V
LOCKABLE
SEE NOTE 2
1/2"
SEE NOTE 1
PRVFILTER
3/4" V
0-30 PSIG
MAIN
BURNER
V
V
V
G
IGNITER (PILOT)
AUTOMATIC VENT VALVE
1"
3/4"
SEE NOTE 1
SAFETY SHUT-OFF VALVES
SEE NOTE 2
ROOF
OUTSIDE
BLDG. WALL
EXISTING GAS MAIN
1/2" V
DIRT
3/8" V
3/8" V
LOCKABLE
0-30
PSIG
FLEXIBLE
CONNECTION
SEE
NOTE 2
1/2"
FUEL PLOW
CONTROL
VALVE
AUTOMATIC VENT VALVE
1/2" V
EXISTING PRV
0-1.5xMAX.
BURNER PRESS
(IN. WC)
MANUAL SHUT-OFF
VALVE
3"
3"
3/8"
MOTORIZED SAFETY
SHUT-OFF VALVES
3"
EXISTING 1/2"V
1/2" V
FM G
6" GAS
PIPE
EXISTING GUAGE
0-30
PSIG
GAUGE
EXISTING
6" GAS
PIPE
8"
PRV FROM
30PSI TO
7.5PSI
EXISTING
DUEL FUEL
WATER TUBE
BOILER
EXISTING 25-30 PSI
GAS TO BE REMOVED
EXISTING 8" GAS
PIPE IN TRENCH
TO BE REMOVED
ISOLATION
VALVES
EXISTING 8" GAS
PIPE IN TRENCH
TO BE REMOVED
EXISTING 8" GAS
PIPE IN TRENCH
TO BE REMOVED
6"G
ISOLATION
VALVE
6"
FLOW
METER
FM
V
NEW FIRE TUBE BOILER #3
BURNER MAIN GAS & IGNITER (PILOT)
EXISTING MAIN GAS METERING
AND REGULATING AREA
GENERAL NOTES:
KEYED NOTES:
HIGH PRESSURE SWITCH
(ANNUNCIATOR)
SCREENED
OUTLET OF
VENT
CAP (TYP.)
HIGH PRESSURE
CUTOUT SWITCH
1. PIPING SIZED BY BURNER MFGR. TO SUIT FLOW
REQUIREMENTS & AVAILABLE PRESSURE.
2. SIZE AUTOMATIC VENT VALVES & VENT PIPING AS FOLLOWS:
1" FROM PRV
INTERNAL RELIEF
VENT
0-1.5xPRV SET
PRESS.
LOW PRESS.
CUTOUT SW.
1" FROM PRV CASING
PILOT VENTS
0-1.5xPRV SET
PRESSURE LOW PRESSURE
CUTOUT SWITCH
1. NEW PIPING SHALL BE INSTALLED
UNDER BOILER 3 INSTALLATION
2. DETAIL #2 INDICATES PIPING TO NEW
FIRE TUBE BOILER.
3. CONTRACTOR SHALL INSTALL NEW
NATURAL GAS FLOW METER
FURNISHED BY BOILER
MANUFACTURER FOR EXISTING FIRE
TUBE BOILER. COORDINATE THE
LOCATION & INSTALLATION
REQUIREMENTS WITH BOILER
MANUFACTURER.
EXISTING FLOW METER TO REMAIN.
EXISTING GAS REGULATOR INSIDE THE
BUILDING. FROM 30 PSI TO 8 PSI.
FLOW METER FURNISHED WITH BOILER,
INSTALLED BY CONTRACTOR
NEW GAS VALVE FOR FIRE TUBE BOILER #3.
CONNECT NEW 3" GAS PIPING AND VALVE
FOR NEW FIRE TUBE BOILER B-3.
EXISTING GAS PIPES TO BE REMOVED, FROM
TRENCH TO EXISTING WATER TUBE BOILER,
AND CAP AS SHOWN.
EXISTING REGULATOR AT EXISTING WATER
TUBE BOILER GAS TRAIN TO BE REMOVED.
CONTRACTOR TO INSTALL 3/4" CONNECTION
WITH BALL VALVE TO BOILER GAS PIPING TO
BOILER IGNITER. POTABLE NATURAL GAS
USE DURING BURNER OPERATION WITH
FUEL OIL FOR PILOT IGNITER.
TO EXISTING FIRE TUBE BOILERS
INSTALL NEW NATURAL GAS PRESSURE
GAUGE.
5 3"
TO OUTSIDE FOR
TEMPORARY
BOILER
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M401
DETAILS - MECHANICAL
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
NOT TO SCALE
FIRE TUBE BOILER #3 FUEL OIL PIPING DETAIL
NOT TO SCALE
NATURAL GAS − BURNER AND IGNITER FUEL STANDARD PIPING DIAGRAM