M104.pdf
PDF 488 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
About this file
M104
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| Attachment_J-2_Drawings.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
DA
TANK
8" VTR8" VTR8" VTR
4 3.4
2.4 1.4 1
H
E
D
B
A
1. ALL EXISTING EQUIPMENT, PIPING,
VALVES TO REMAIN UNLESS OTHERWISE
NOTED.
GENERAL NOTES:
DEMOLITION KETED NOTES:
1 EXISTING FORCE DRAFT FAN, INDUCED DRAFT
FAN #1 AND ASSOCIATED EQUIPMENT TO BE
REMOVED.
REMOVE EXISTING VENTS THRU ROOF. CAP
ROOF OPENINGS.
REMOVE EXISTING STACK & CAP EXISTING ROOF
OPENING.
REMOVED CONCRETE PADS FOR DRAFT FAN AND
INDUCED FRAFT FAN.
REMOVE ALL ABANDONED PIPING ASSOCIATED
WITH EXISTING DEAERATOR TANK.
REMOVE EXISTING DEAERATOR TANK AND
ASSOCIATED SYSTEM PIPING TO BE REMOVED.
DA-1
6" VTR
EF-1 EF-2 EF-3
"ø
"ø
6" V
EXISTING
EXISTINGEXISTINGEXISTING
4" S100
4" S100 4" S100
1" SR
8" S15
1" S15
1" S15
4" S15
3" PCR
1" D
4" SCW
6" BFW
4" SCW
2" SR
4" PCR
4" SCW
1" D 1" D
1" D 1" D
1" SR
1" D
6" VTR
6" BFW
10" S100
4" VTR
4" V
6" S100 5
14" V 5
ADDITIVE OPTIONS
OPTION #1 REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION #2
OPTION #3
OPTION #4
REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION #5
OPTION #6
REMOVE ALL EXISTING FEEDWATER PIPING IN TRENCH.
NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
NEW WATER SOFTNER SYSTEM, COMPLETE WITH PIPING ABD CONTROLS.
NEW EMERGENCY GENERARTOR.
OPTION #7 NEW HVAC PIPING TO CONNECT EMERGENCY BOILER.
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
M104
BOILER #3 INSTALLATION -
FAN PLATFORM -
MECHANICAL DEMOLITION
03-24-14
01-13-0018
B ui ld in g
B oi le r #3
R ep la ce m en t Je ffe rs on L ab or at or ie s
F oo d an d D ru g
A dm in is tr at io n
N C
T R
R d
Je ffe rs on
, A R
CONSTRUCTION
DOCUMENT
1/4" = 1’−0"
BOILER #3 INSTALLATION − FAN PLATFORM PLAN − MECHANICAL DEMOLITION
GENERAL NOTE:
CONTRACTOR SHALL NOT CONDUCT ANY WORK THAT WILL SHUTDOWN BOILER #1 OR #2 WHILE WORKING ON BOILER #3. ANY WORK ON EXISTING BOILERS SHALL BE SCHEDULED IN ADVANCE SO THAT A MINIMUM OF TWO
BOILERS ARE ALWAYS OPERATIONAL AND AVAILABLE.
File details come from the government source that posted it. Updated .