Attachment_J-2_Drawings.pdf
PDF 13 KB Posted
- Attached to
- Boiler #3 Replacement
- Solicitation number
- 14-223-SOL-00059
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| E301.pdf | ||
| M403.pdf | ||
| M402.pdf | ||
| M103.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E101.pdf | ||
| M305.pdf | ||
| M601.pdf | ||
| E401.pdf | ||
| M702.pdf | ||
| G100.pdf | ||
| M307.pdf | ||
| M203.pdf | ||
| E102.pdf | ||
| M202.pdf | ||
| M302.pdf | ||
| M304.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M401.pdf | ||
| M701.pdf | ||
| M303.pdf | ||
| M200.pdf | ||
| M306.pdf | ||
| M501.pdf | ||
| S102.pdf | ||
| M201.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| M102.pdf | ||
| E201.pdf | ||
| E202.pdf | ||
| Solicitation_14-223-SOL-00059.pdf | ||
| M204.pdf | ||
| Attachment_J-3_General_Decision_Number_AR140125.pdf | ||
| M100.pdf | ||
| M101.pdf | ||
| M104.pdf |
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J-2
Drawings, Building 7- Boiler #3 Replacement, Jefferson Laboratories, all dated March 24, 2014, Project No. 01-13-0018
G100 COVER SHEET
E101 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION
E102 BOILER #3 INSTALLATION - FAN PLATFORM - ELECTRICAL DEMOLITION
E201 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - ELECTRICAL NEW
E202 BOILER #3 INSTALLATION - MEZZANINE FLOOR PLAN - ELECTRICAL NEW
E301 PANELS - ELECTRCIAL
E401 SCHEDULE, LEGEND, NOTES AND DETAIL – ELECTRICAL
M100 BOILER #3 INSTALLATION - TRENCH PLAN - MECHANICAL DEMOLITION
M101 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - MECHANICAL
DEMOLITION
M102 BOILER #3 INSTALLATION - MEZZANINE FLOOR PLAN - MECHANICAL
DEMOLITION
M103 BOILER #3 INSTALLATION - SECOND FLOOR PLAN - MECHANICAL
DEMOLITION
M104 BOILER #3 INSTALLATION - FAN PLATFORM - MECHANICAL DEMOLITION
M200 BOILER 3 INSTALLATION - TRENCH PLAN - MECHANICAL NEW
M201 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - MECHANICAL NEW
M202 BOILER #3 INSTALLATION - MEZZANINE FLOOR PLAN - MECHANICAL NEW
M203 BOILER #3 INSTALLATION - SECOND FLOOR PLAN - MECANIAL NEW
M204 BOILER 3 INSTALLATION - FAN PLATFORM - MECHANICAL NEW
M301 ENLARGED FLOOR PLANS - NEW BOILER #3
M302 MAIN HEADER SECTIONS
M303 NEW LOUVER INSTALL SECTIONS
M304 SECTION PLAN VIEW EXISTING WATER TUBE BOILER - ASBESTOS
ABATMENT
M305 SECTION SIDE ELEVATION EXISTING WATER TUBE BOILER - ASBESTOS
ABATMENT
M306 BOILER #3 INSTALLATION - HVAC PIPING RISER DEMOLITION
M307 BOILER #3 INSTALLATION - HVAC PIPING RISER - MECHANICAL NEW
M401 DETAILS - MECHANICAL
M402 DETAILS - MECHANICAL
M403 DETAILS - MECHANICAL
M501 PIPING DIAGRAMS/FLOWS
M601 SCHEDULES AND LEGEND - MECHANICAL
M701 CONTROLS - MECHANICAL
M702 CONTROLS - MECHANICAL
S101 STRUCTURAL SECOND FLOOR PLAN
S102 STRUCTURAL ELEVATIONS & DETAILS
File details come from the government source that posted it. Updated .