Attachment_J-2_Drawings.pdf

PDF 13 KB Posted

Attached to
Boiler #3 Replacement
Solicitation number
14-223-SOL-00059
Issued by

View the file

Other files

File Type Posted
Amendment_1.pdf PDF
E301.pdf PDF
M403.pdf PDF
M402.pdf PDF
M103.pdf PDF
Attachment_J-1_Specifications.pdf PDF
E101.pdf PDF
M305.pdf PDF
M601.pdf PDF
E401.pdf PDF
M702.pdf PDF
G100.pdf PDF
M307.pdf PDF
M203.pdf PDF
E102.pdf PDF
M202.pdf PDF
M302.pdf PDF
M304.pdf PDF
Attachment_J-4_FDA_Form_3391.pdf PDF
M401.pdf PDF
M701.pdf PDF
M303.pdf PDF
M200.pdf PDF
M306.pdf PDF
M501.pdf PDF
S102.pdf PDF
M201.pdf PDF
S101.pdf PDF
M301.pdf PDF
M102.pdf PDF
E201.pdf PDF
E202.pdf PDF
Solicitation_14-223-SOL-00059.pdf PDF
M204.pdf PDF
Attachment_J-3_General_Decision_Number_AR140125.pdf PDF
M100.pdf PDF
M101.pdf PDF
M104.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-2

Drawings, Building 7- Boiler #3 Replacement, Jefferson Laboratories, all dated March 24, 2014, Project No. 01-13-0018

G100 COVER SHEET

E101 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION

E102 BOILER #3 INSTALLATION - FAN PLATFORM - ELECTRICAL DEMOLITION

E201 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - ELECTRICAL NEW

E202 BOILER #3 INSTALLATION - MEZZANINE FLOOR PLAN - ELECTRICAL NEW

E301 PANELS - ELECTRCIAL

E401 SCHEDULE, LEGEND, NOTES AND DETAIL – ELECTRICAL

M100 BOILER #3 INSTALLATION - TRENCH PLAN - MECHANICAL DEMOLITION

M101 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - MECHANICAL

DEMOLITION

M102 BOILER #3 INSTALLATION - MEZZANINE FLOOR PLAN - MECHANICAL

DEMOLITION

M103 BOILER #3 INSTALLATION - SECOND FLOOR PLAN - MECHANICAL

DEMOLITION

M104 BOILER #3 INSTALLATION - FAN PLATFORM - MECHANICAL DEMOLITION

M200 BOILER 3 INSTALLATION - TRENCH PLAN - MECHANICAL NEW

M201 BOILER #3 INSTALLATION - FIRST FLOOR PLAN - MECHANICAL NEW

M202 BOILER #3 INSTALLATION - MEZZANINE FLOOR PLAN - MECHANICAL NEW

M203 BOILER #3 INSTALLATION - SECOND FLOOR PLAN - MECANIAL NEW

M204 BOILER 3 INSTALLATION - FAN PLATFORM - MECHANICAL NEW

M301 ENLARGED FLOOR PLANS - NEW BOILER #3

M302 MAIN HEADER SECTIONS

M303 NEW LOUVER INSTALL SECTIONS

M304 SECTION PLAN VIEW EXISTING WATER TUBE BOILER - ASBESTOS

ABATMENT

M305 SECTION SIDE ELEVATION EXISTING WATER TUBE BOILER - ASBESTOS

ABATMENT

M306 BOILER #3 INSTALLATION - HVAC PIPING RISER DEMOLITION

M307 BOILER #3 INSTALLATION - HVAC PIPING RISER - MECHANICAL NEW

M401 DETAILS - MECHANICAL

M402 DETAILS - MECHANICAL

M403 DETAILS - MECHANICAL

M501 PIPING DIAGRAMS/FLOWS

M601 SCHEDULES AND LEGEND - MECHANICAL

M701 CONTROLS - MECHANICAL

M702 CONTROLS - MECHANICAL

S101 STRUCTURAL SECOND FLOOR PLAN

S102 STRUCTURAL ELEVATIONS & DETAILS

File details come from the government source that posted it. Updated .