This document provides details for a federal construction solicitation for replacement of the fuels storage complex at the Quonset Point Rhode Island Air National Guard Station. The solicitation will be issued by the U.S. Army Corps of Engineers New England District to replace the truck offload and fillstand positions, pumping and filtration equipment, and construct a new 600 gallon per minute pumphouse with control room and offload skids. The work will also include fuel pumps, filter/separator vessels, truck fillstand equipment, associated valves, piping and electrical equipment. Upgrades will be made to the existing refueler parking area, and existing storage tanks will be reused with the new system. Construction will be phased to allow continued operation of the existing system until most of the new one is completed. The work is estimated between $5-10 million and has a NAICS code of 236220. The solicitation will be set aside for small businesses and use best value tradeoff procedures.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TFV
PDM
F
S
ABCV
ABCV
1A
PDM
TFV
PDM
F
S
ABCV
ABCV
2A
PDM
F
S
F
S
6" STAINLESS
STEEL PIPING IN
TRENCH
FILLSTAND POSITION 2
FILLSTAND POSITION 1
OFFLOAD POSITION 1
OFFLOAD POSITION 2
OFFLOAD SKID
PIPING PLAN
M-402
TRUCK FILLSTAND
PIPING PLAN
M-403
TRUCK FILLSTAND
CONTROL VALVE
" CHECK VALVE AND PIPING
FOR THERMAL RELIEF
4"
4"
4"
4"
POSITIVE
DISPLACEMENT METER
BASKET
STRAINER
MAV
MAV
MAV
MAV
METER PROVING
CONNECTIONS
4" HIGH FLOW
CONTROL VALVE
2" LOW FLOW
CONTROL VALVE
AIR ELIMINATOR TANK
300 GPM VERTICAL CENTRIFUGAL
TRUCK OFFLOAD PUMP
300 GPM POSITIVE
DISPLACEMENT METER
GLOBE VALVE FOR
FIXED LOW FLOWRATE
CONTROL
4" Ø x 10' LONG HOSE W/
HANGING RACK AND QUICK
DISCONNECT COUPLING (TYP 5)
BASKET
STRAINER
LPD
LPD
OF-2
OF-1
3" STAINLESS STEEL
PANTOGRAPH
MATCHLINE SEE M-602
MATCHLINE SEE M-602
6" x 4"
REDUCER
6" x 4"
REDUCER
6" x 4"
REDUCER
6" STAINLESS STEEL
FILLSTAND LOOP
PIPING IN TRENCH
csss csss
LOW POINT DRAIN
M-502
LPD
LPD
TYPICAL PRESSURE
GAUGE
M-501
F
S
CV
OV
2,000 GALLON PRODUCT
RECOVERY TANK
1"
50 GPM FUEL
TRANSFER PUMP
SLOPE 1
% TO 3% MAX
FTP-1
1"
2"
2" NOZZLE FOR LEAK
DETECTION MONITOR
2" NOZZLE FOR ELECTRIC
TANK DRAIN PUMP
WP
RETURN BASIN
ELECTRIC PUMP
2" NOZZLE FOR CLOCK
TYPE GAUGE
14" NOZZLE FOR FLOAT SWITCH
OV CLOSES AT 95% FILL LEVEL;
OPENS AS LEVEL DROPS BELOW
95% FILL LEVEL
2" BASKET STRAINER
30" MANWAY W/ 6" NOZZLE FOR
PRIMARY TANK EMERGENCY VENT
4" NOZZLE FOR SAMPLING AND
GAUGING HATCH W/ 2
" PV VENT
" MALE CAM TYPE
CONNECTOR W/ DUST CAP
FLOAT SWITCH W/
MANUAL TESTER
FLOAT SWITCH ASSEMBLY, STARTS FUEL
TRANSFER PUMP AT 70% FILL LEVEL AND STOPS
PUMP AT 20% FILL LEVEL. SOUNDS ALARM AT 85%
FILL LEVEL (HLA) AND 90% FILL LEVEL (HHLA)
6" NOZZLE FOR ATG
PRESSURE RESERVOIR
6" NOZZLE FOR SECONDARY
TANK EMERGENCY VENT
F I L E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D
2 3
C
4 5
A
B
D A
T E
F I
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
S M
B L
D E
S C
R I P
T I O
N
C O
N T
R A
C T
O
SHEET
IDENTIFICATION
D A
T E
A P
P R
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
--S E
P T
E M
B E
R
A N
S I
D
OMAHA DISTRICT
S E
A L
D E
S C
S
R
E P
L A
C
U E
L
F
A C
I L
I T
I E
S
Q U
O N
S E
T
A
I R
T
I O
N A
L
G
U A
R D
B
S
E
N O
R T
H
K
I N
G S
T O
W N
R
H O
D
I
L A
N D
R
READY TO ADVERTISE (RTA)
M-603
F U
Y S
T E
M
F
L O
W
D
I A
G R
A M
M
S
O U
P R
A Y
E N
M
S
O U
P R
A Y
E N M
F
U R
R
C
L A
Y S
O N
M
D
W G
A
M E
N D
M E
T
S
P
M
H F
| Sheets and Views |
| M-603 FUEL SYSTEM FLOW DIAGRAM (2 OF 2) |
File details come from the government source that posted it. Updated .