EP602 ELECTRICAL SCHEDULES.pdf
PDF 2 MB Posted
- Solicitation number
- W912WJ20R0011
About this file
This document provides details on an upcoming federal procurement opportunity for construction services. The U.S. Army Corps of Engineers New England District will issue a solicitation to replace the fuels storage complex at the Quonset Point Rhode Island Air National Guard Station, including constructing a new 600 GPM pumphouse, offload skids, fuel pumps, filter vessels, fillstand equipment and associated valves, piping and electrical components. The work will also upgrade an existing refueler parking area and reuse existing storage tanks with the new system. Phased construction is required to maintain existing system operations until most of the replacement is complete. The estimated value of the work is between $5-10 million. The NAICS code is 236220. The procurement will be set aside for small businesses and use best value tradeoff source selection procedures.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F I L E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D
2 3
C
4 5
A
B
D A
T E
F I
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
S M
B L
D E
S C
R I P
T I O
N
C O
N T
R A
C T
O
SHEET
IDENTIFICATION
D A
T E
A P
P R
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
O
E
N G
I N
E E
R S
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
--S E
P T
E M
B E
R
A N
S I
D
OMAHA DISTRICT
S E
A L
D E
S C
S
R
E P
L A
U E
L
F
A C
I L I T
I E
S
Q U
O N
S E
T
A
R
T
I O
N A
L
G
U A
R D
B
S
E
N O
R T
H
K
I N
G S
T O
W N
R
H O
D
L A
N D
R
READY TO ADVERTISE (RTA)
PROFESSIONAL
G EO R G I A
D O
UG L A S P . E NG
E
L
ENG I NE ER
REGI STERED
No. 41840
EP602
E L
E C
T R
I C
H
E D
U L
E S
D
E
N G
E L
E
J A
C K
S O
N M
F
U R
R
C
L A
Y S
O N
E
P D
W G
NOTES:
1. PROVIDE RED LOCK-ON BREAKER FOR FIRE ALARM CONTROL PANEL
CIRCUITS INDICATED.
2. PROVIDE BUILT IN TVSS, PER SPECIFICATIONS, WITH INTEGRAL
DISCONNECT.
3. PROVIDE ARC FLASH WARNING SIGNS ON ALL SWITCHBOARDS,
PANELBOARDS, INDUSTRIAL CONTROL PANELS, METER SOCKET
ENCLOSURES, AND MOTOR CONTROL CENTERS AS REQUIRED PER
THE REQUIREMENTS OF THE COORDINATION STUDY, SPECIFICATION
SECTION 26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION.
NOTES:
1. PROVIDE RED LOCK-ON BREAKER FOR FIRE ALARM CONTROL PANEL
CIRCUITS INDICATED.
2. PROVIDE BUILT IN TVSS, PER SPECIFICATIONS, WITH INTEGRAL
DISCONNECT.
3. PROVIDE ARC FLASH WARNING SIGNS ON ALL SWITCHBOARDS,
PANELBOARDS, INDUSTRIAL CONTROL PANELS, METER SOCKET
ENCLOSURES, AND MOTOR CONTROL CENTERS AS REQUIRED PER
THE REQUIREMENTS OF THE COORDINATION STUDY, SPECIFICATION
SECTION 26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION.
A
M E
N D
M E
T
D P
E
S
P
| Sheets and Views |
| EP602 ELECTRICAL SCHEDULES |
File details come from the government source that posted it. Updated .