Supplemental Price Breakdown to the Bidding Schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Quonset Point Fuels Storage Complex Replacement Construction at the Rhode Island Air National Guard Station in North Kingstown, Rhode Island
Solicitation number
W912WJ20R0011
Issued by

About this file

This document contains a bidding schedule and supplemental price breakdown for construction services. The U.S. Army Corps of Engineers Engineering District New England will replace the fuel storage complex at the Quonset Point Rhode Island Air National Guard Station in North Kingstown, Rhode Island. The solicitation number is W912WJ20R0011 and services required include replacing the truck offload and fillstand positions, associated pumping and filtration equipment, constructing a new 600 GPM pumphouse and control room, offload skids, fuel pumps, filter vessels, truck fillstand equipment, associated valves, piping and electrical work. Upgrades to the refueler parking area are also included. The NAICS code is 236220 and the estimated value is between $5,000,000 to $10,000,000. The procurement will be a small business set-aside using best value tradeoff procedures.

View the file

Other files

File Type Posted
Amendment 0010.pdf PDF
A-202 BUILDING SECTIONS.pdf PDF
Amendment 0009 - G-009 PHASING PLAN 1.pdf PDF
M-603 FUEL SYSTEM FLOW DIAGRAM (2 OF 2).pdf PDF
M-302 FUELING SYSTEM PIPING ELEVATIONS (2 OF 2).pdf PDF
Amendment 0009 - ES403 ENLARGED SITE PLAN (3 OF 4).pdf PDF
EP101 PUMP HOUSE POWER PLAN.pdf PDF
Amendment 0009 - ES404 ENLARGED SITE PLAN (4 OF 4).pdf PDF
A-002 CODE ANALYSIS.pdf PDF
A-103 REFLECTED CEILING AND ROOF PLANS.pdf PDF
ES101 ELECTRICAL OVERALL SITE PLAN.pdf PDF
Amendment 0009 - EP601 POWER DIAGRAMS AND SCHEDULES.pdf PDF
Amendment 0009 - Spec Section 01 22 00 - 05OCT20.pdf PDF
Amendment 0009.pdf PDF
Amendment 0009 - ES508 STORAGE TANK ELECTRICAL ELEVATION.pdf PDF
EP602 ELECTRICAL SCHEDULES.pdf PDF
Amendment 0009 - 26 24 19.00 40.pdf PDF
EP603 ELECTRICAL SCHEDULES.pdf PDF
Amendment 0009 - Schedule of Special Inspections.pdf PDF
E-001 ELECTRICAL LEGEND AND ABBREVIATIONS.pdf PDF
M-403 TRUCK FILLSTAND PIPING LAYOUT PLAN AND ELEVATION.pdf PDF
Quonset Modified document and comments.pdf PDF
ES507 PRODUCT RECOVERY TANK PLAN AND DETAIL.pdf PDF
EP604 ELECTRICAL SCHEDULES.pdf PDF
A-302 WALL SECTIONS AND DETAILS.pdf PDF
A-101 FLOOR PLAN.pdf PDF
Amendment 0008 - 03 30 00.pdf PDF
Amendment 0008 - G-013 MISCELLANEOUS WORK ITEMS AND NOTES.pdf PDF
Amendment 0008.pdf PDF
Amendment 0008 - 32 13 13.06.pdf PDF
Amendment 0008 - ES401 ENLARGED SITE PLAN (1 OF 4).pdf PDF
Amendment 0008 - 33 52 43.11.pdf PDF
Amendment 0008 - C-407 PUMPHOUSE AND PRT GRADING AND DRAINAGE PLAN - PHASE 1.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006 - Wage Determination.pdf PDF
Amendment 0006 - 1802100MH-101-R1.pdf PDF
Amendment 0006 - 09 90 00 (Q - RTA - Bolded-2).pdf PDF
Amendment 0006 - 10 71 19.16 - Q - RTA - Bolded-2.pdf PDF
Amendment 0006.pdf PDF
Amendment 0006 - 33 56 19 - Q - RTA - Bolded-2.pdf PDF
Amendment 0006 - A-501 (SCHEDULES).pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Solicitation Drawing.zip ZIP file
Specs - Volume 1.pdf PDF
Specs - Volume 2.pdf PDF
W912WJ20R0011_Solicitation.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DESC20S1 Replace Fuel Facilities,
Quonset Air National Guard Base,
North Kingstown, Rhode Island
Bidding Schedule
Item No.DescriptionQuantiyUnitPriceAmount

BASE ITEMS

0001 Fuel Storage Complex Replacement 1 Job $0.00 $0.00

0002 Furnishing and Delivering Prestressed Concrete Piles 1600 LF $0.00 $0.00

0003 Driving Prestressed Concorete Piles 1600 LF $0.00 $0.00

0004 Prestressed Concrete Pile Compressive Load Tests 2 EA $0.00 $0.00

Base Items Total $0.00

OPTIONAL ITEMS

0005 Canopy Foundation 1 Job $0.00 $0.00

0006 Canopy Superstructure 1 Job $0.00 $0.00

0007 Contaminated Soil: Cost of testing and stockpiling of contaminated soil

0007A First 20 CY 20 CY $0.00 $0.00

0007B Over 20 CY 40 CY $0.00 $0.00

0008 Contaminated Soil: Cost of transporting and disposal of contaminated soil

0008A First 20 CY 20 CY $0.00 $0.00

0008B Over 20 CY 40 CY $0.00 $0.00

0009 Asbestos Containing Gasket

0009A First 10 Gaskets 10 EA $0.00 $0.00

0009B Over 10 Gaskets 20 EA $0.00 $0.00

0010 Transite Pipe

0010A First 10 linear feet encountered 10 LF $0.00 $0.00

0010B Over 10 linerar feet encountered 20 LF $0.00 $0.00

0011 Lead Contaminated Material

0011A Provide cost per ton. This unit cost will be applied for the first 3 tons are encountered. 3 Ton $0.00 $0.00

0011B Provide cost per ton. This unit cost will be applied when more than 3 tons are encountered. 10 Ton $0.00 $0.00

0012 ATG Related Work 1 Job $0.00 $0.00

Optional Items Total $0.00

Total for Base and Optional Items $0.00