Amendment 0009 - ES403 ENLARGED SITE PLAN (3 OF 4).pdf
PDF 630 KB Posted
- Solicitation number
- W912WJ20R0011
About this file
This document provides details for a federal construction solicitation for replacement of the fuels storage complex at the Quonset Point Rhode Island Air National Guard Station. The solicitation will require construction of a new 600 gallon per minute pumphouse with control room, offload skids, fuel pumps, filter and separator vessels, truck fillstand equipment, associated valves, piping and electrical work. Existing storage tanks will be reused with the new system. The work will also include upgrades to the existing refueler parking area and phased construction to allow continued operation of the existing system until most of the new one is completed. The solicitation is expected to have a value between $5-10 million and will be set aside for small businesses using best value tradeoff procedures. The U.S. Army Corps of Engineers New England District will issue the solicitation for the project.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXX
XX
XXX
X
X X
X X
X X
E E E E E E
E
W
F
H
C
B
C B
S
E
S D
S D
S D
S D
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S
D
E
E E
E E
E E
E
E E
E E
E E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
G
G
G
G
GGGGG
G
G
G
G
G
G
G
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E
EEEEEEEEE
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
E
E
E
E
E
E E
E
E
E
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
E
EEEEE
SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
C
O
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
MH
S D
EFSO-15
EFSO-18
H
J
H
COMM COMM COMM COMM COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
E S
E S
E S
E S
E S
E S
E S
E S
E S
E
S
ESESESESESESESESESESESESESESESESES
E
E
EEEEEEEE
WP/GFI
J
TELE-
COM
FACP
ATG EFSO
F I L E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D
2 3
C
4 5
A
B
D A
T E
F I L
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
S M
B L
D E
S C
R I P
T I O
N
C O
N T
R A
C T
O
SHEET
IDENTIFICATION
D A
T E
A P
P R
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
--S E
P T
E M
B E
R
A N
S I
D
OMAHA DISTRICT
S E
A L
D E
S C
S
R
E P
L A
C
U E
L
F
A C
I L
I T
I E
S
Q U
O N
S E
T
A
I R
T
I O
N A
L
G
U A
R D
B
S
E
N O
R T
H
K
I N
G S
T O
W N
R
H O
L A
N D
R
READY TO ADVERTISE (RTA)
PROFESSIONAL
G E O R G I A
D O
UG L A S P . E NG
E
L
ENG I NE ER
REG ISTERED
No. 41840
ES403
E N
L A
R G
T
E
P
L A
N
D
E
N G
E L
E
J A
C K
S O
N M
F
U R
R
C
L A
Y S
O N
E
S D
W G
ENLARGED SITE PLAN (3 OF 4)
SCALE: 1" = 10'-0"
GENERAL NOTES:
1. SEE E-001 FOR LEGEND, ABBREVIATIONS, AND GENERAL
NOTES.
2. SEE CIVIL DRAWINGS FOR DEMOLITION AND WORK
SEQUENCE PLANS.
KEYED NOTES:
1. PROPOSED LOCATION OF NEW SERVICE MAIN
DISCONNECT AND TRANSFORMER FOR BACK FEED OF
BLDG 14.
2. CONNECT CONDUITS TO EXISTING WIRE GUTTER ON
THE SIDE OF BUILDING 14.
3. THE EXISTING CIRCUIT FROM BUILDING 14 TO THE SIX
EXISTING FIRE ALARM PULL STATIONS HAS FAILED.
PROVIDE NEW 1" DIRECT BURIED SCHEDULE 80 PVC
CONDUIT FROM THE WIREGUTTER ON THE SIDE OF
BUILDING 14 TO THE EASTERN FOUR STATIONS IN THEIR
EXISTING LOCATIONS. RELOCATE THE WEST STATIONS
TO THE WEST GATE AND EXTEND THE NEW CONDUIT
AND WIRE TO THEM. SEE FIRE ALARM DRAWINGS FOR
CABLES.
4. PROVIDE 1 1/2"C FOR CONTROL OF GATE OPERATORS
FROM BUILDING 14 CONTROL ROOM. COORDINATE
ACTUAL CONTROL CONDUCTORS WITH APPROVED GATE
OPERATOR SHOP DRAWINGS. LOCATE CONTROL
BUTTONS IN THE CONTROL ROOM AS DIRECTED BY THE
CONTRACTING OFFICER. SEE CIVIL DWGS FOR GATE
OPERATION SEQUENCE.
5. EXISTING TELECOM AND FACP. EQUIPMENT LOCATED
INSIDE FUEL MANAGEMENT BLDG 14.
6. PROVIDE 2#12,1#12G IN 1"C FOR POWER TO GATE LOCK
FED FROM PANEL 'P1' IN BUILDING 14. PROVIDE 8#14,
1#14G TO CONTROL STATIONS (4 TO EACH STATION) IN
1"C. ACTUAL WIRING TO BE CONFIRMED WITH
APPROVED SHOP DRAWINGS FOR THE GATE OPERATOR
AND CONTROL EQUIPMENT. PROVIDE ONE (1) 20A, 1P
BOLT-IN BREAKER IN PANEL 'P1' (SQUARE-D QOB120).
EXISTING FUEL
MANAGEMENT
BLDG 14
EXISTING PANEL P1
BLDG #18
EXIST. SECT.
CAB TC#7
EXIST. SECT.
CAB TC#6
EXIST. BLDG #18
XFMR
R1- CONCRETE ENCASED
R4- CONCRETE ENCASED
HANDHOLE
48"X48"
HANDHOLE
30"X30"
C30,C31,C32
CONCRETE ENCASED
EXISTING FA
PULL STATION
EXISTING FACP and TELECOM PANELS
IN FUEL MANAGEMENT BLDG 14
A
M E
N D
M E
T
D
P E
P
| Sheets and Views |
| ES403 ENLARGED SITE PLAN (3 OF 4) |
File details come from the government source that posted it. Updated .