About this file

This document contains a federal contract opportunity for construction services. The U.S. Army Corps of Engineers New England District will issue a solicitation to replace the fuels storage complex at the Quonset Point Rhode Island Air National Guard Station. The project scope includes replacing the truck offload and fillstand positions, associated pumping, filtration, and fuel handling equipment. A new 600 GPM capacity pumphouse will be constructed along with control room, offload skids, fuel pumps, filter/separator vessels, truck fillstand equipment, valves, piping and electrical components. Existing storage tanks will be reused with the new system. Construction will be phased to allow the current system to operate until most of the replacement is complete. The estimated value is between $5-10 million. The NAICS code is 236220. The procurement will be a small business set-aside using Best Value Tradeoff procedures. The solicitation number is W912WJ20R0011.

View the file

Other files

File Type Posted
Amendment 0010.pdf PDF
A-202 BUILDING SECTIONS.pdf PDF
Amendment 0009 - G-009 PHASING PLAN 1.pdf PDF
M-603 FUEL SYSTEM FLOW DIAGRAM (2 OF 2).pdf PDF
M-302 FUELING SYSTEM PIPING ELEVATIONS (2 OF 2).pdf PDF
Amendment 0009 - ES403 ENLARGED SITE PLAN (3 OF 4).pdf PDF
Amendment 0009 - ES404 ENLARGED SITE PLAN (4 OF 4).pdf PDF
A-002 CODE ANALYSIS.pdf PDF
A-103 REFLECTED CEILING AND ROOF PLANS.pdf PDF
ES101 ELECTRICAL OVERALL SITE PLAN.pdf PDF
Amendment 0009 - EP601 POWER DIAGRAMS AND SCHEDULES.pdf PDF
Amendment 0009 - Spec Section 01 22 00 - 05OCT20.pdf PDF
Amendment 0009.pdf PDF
Amendment 0009 - ES508 STORAGE TANK ELECTRICAL ELEVATION.pdf PDF
EP602 ELECTRICAL SCHEDULES.pdf PDF
Amendment 0009 - 26 24 19.00 40.pdf PDF
EP603 ELECTRICAL SCHEDULES.pdf PDF
Amendment 0009 - Schedule of Special Inspections.pdf PDF
E-001 ELECTRICAL LEGEND AND ABBREVIATIONS.pdf PDF
M-403 TRUCK FILLSTAND PIPING LAYOUT PLAN AND ELEVATION.pdf PDF
Quonset Modified document and comments.pdf PDF
ES507 PRODUCT RECOVERY TANK PLAN AND DETAIL.pdf PDF
EP604 ELECTRICAL SCHEDULES.pdf PDF
A-302 WALL SECTIONS AND DETAILS.pdf PDF
A-101 FLOOR PLAN.pdf PDF
Amendment 0008 - 03 30 00.pdf PDF
Amendment 0008 - G-013 MISCELLANEOUS WORK ITEMS AND NOTES.pdf PDF
Amendment 0008.pdf PDF
Amendment 0008 - 32 13 13.06.pdf PDF
Amendment 0008 - ES401 ENLARGED SITE PLAN (1 OF 4).pdf PDF
Amendment 0008 - 33 52 43.11.pdf PDF
Amendment 0008 - C-407 PUMPHOUSE AND PRT GRADING AND DRAINAGE PLAN - PHASE 1.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006 - Wage Determination.pdf PDF
Amendment 0006 - 1802100MH-101-R1.pdf PDF
Amendment 0006 - 09 90 00 (Q - RTA - Bolded-2).pdf PDF
Amendment 0006 - 10 71 19.16 - Q - RTA - Bolded-2.pdf PDF
Amendment 0006.pdf PDF
Amendment 0006 - 33 56 19 - Q - RTA - Bolded-2.pdf PDF
Amendment 0006 - A-501 (SCHEDULES).pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Solicitation Drawing.zip ZIP file
Supplemental Price Breakdown to the Bidding Schedule.xlsx XLSX spreadsheet
Specs - Volume 1.pdf PDF
Specs - Volume 2.pdf PDF
W912WJ20R0011_Solicitation.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EF-1

PH-2

ACCU-1

EUH-1

PH-1

EUH-2

EUH-3

AHU-1

M

IP-3J

R11

SHA

TO MCC

R11

TO MCC

C15

M

IP-2

J

R10

SHA

TO MCC

R10

TO MCC

C15

M

IP-1J

R9

SHA

TO MCC

R9

TO MCC

C15

FS

FS

FS

FS

M

PRP-1

PP2-5

SHA

TO MCC

C15

TO PCP

C5

TO PCP

C5

TO PCP

C5

TO PCP

C5

FS

S M

E

P

PP1-18

TO EFSO

C8

EFSO

MCC

PCP

ATG

PP1

H W

P

H W

P

TO PCP

C4

H W

P

H W

P

H WP

H WP

TO PCP

C4

TO PCP

C4

EFSO-5

TO EFSO

C1

EFSO-4

TO EFSO

C1

EFSO-6

EFSO-7

EFSO-2

TO EFSO

C1

TO EFSO

C1

TO EFSO

C1

L C

T C

PP1-16

S

FSCV-I3

TO EFSO

C28

S

FSCV-I2

TO EFSO

C27

S

FSCV-I1

TO EFSO

C26

PP1-31

PP1-33

PP1-35

PP1-37

PP1-12,14

60/2/3R

J

SM/2P/3R

PP1-13,15

J

PP1-21,23

PP2-3

J

J

PP1-17,19

PP1-11

60/2/4X

PP1-5,7

PP1-2,4,6

PP1-8

PP1-9

F A

C P

PP2-20

GEN

TO GEN

CNTL CABLE PER MFR

WH-1

100/3/3R

TO MCC

EFSO-1

M

PP1-10

PP2

HP

TO EFSO

C1

S

3/EP

S

3/EP

EFSO-3

TO EFSO

C1

WP

WP

WP

WP

WP

PP1-1,3

TELE-

COM

HP-5

J

F I L E

N

A M

E

D W

N

B

Y

C K

D

B

Y

D E

S I G

N E

D

B

Y

D

2 3

C

4 5

A

B

D A

T E

F I

U M

B E

R

S I Z

E

S U

B M

I T

T E

D

B

Y

P L O

T

S

C A

L E

P

L O

T

D

A T

E

S M

B L

D E

S C

R I P

T I O

N

C O

N T

R A

C T

O

SHEET

IDENTIFICATION

D A

T E

A P

P R

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P S

F

E

N G

I N

E E

R S

O M

A H

A

D

I S

T R

I C

T

O M

A H

A

N

E B

R A

S K

A

--S E

P T

E M

B E

R

A N

S I

D

OMAHA DISTRICT

S E

A L

D E

S C

S

R

E P

L A

C

F

U E

L

F

A C

I L

I T

I E

S

Q U

O N

S E

T

A

I R

T

I O

N A

L

G

U A

D

B

S

E

N O

R T

H

K

I N

G S

T O

W N

R

H O

D

I

L A

N D

R

READY TO ADVERTISE (RTA)

PROFESSIONAL

G EO R G I A

D O

UG L A S P . E NG

E

L

ENG I NE ER

REGI STERED

No. 41840

EP101

P U

M

H

U

W

A

N

D

E

N G

E L

E

J A

C K

S O

N M

F

U R

R

C

L A

Y S

O N

E

P D

W G

PUMP HOUSE POWER PLAN

SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

4 0 4 8

GENERAL NOTES:

1. THE ENTIRE AREA INSIDE THE PUMP HOUSE, EXCEPT

THE VOLUME INSIDE THE CONTROL ROOM AND RISER

ROOM, SHALL BE CONSIDERED A CLASS 1, DIVISION 1

HAZARDOUS LOCATION BASED ON PROXIMITY TO

FUELING EQUIPMENT (AND TYPE OF EQUIPMENT) AND

PIPING, PER NEC ARTICLE 500. ALL ELECTRICAL

EQUIPMENT INSTALLED WITHIN THE HAZARDOUS AREA

SHALL BE SPECIFICALLY APPROVED BY UL FOR THE

SPECIFIC HAZAROUS AREA CLASSIFICATION. ALL BOXES

AND CABINETS PROVIDED IN HAZARDOUS AREAS SHALL

BE DUAL LISTED NEMA 7/4X.

2. EACH CONDUIT ORIGINATING IN OR PASSING THROUGH

OR UNDER A HAZARDOUS AREA AND PENETRATING

CONTROL ROOM WALLS, ROOF, OR FLOOR SHALL HAVE

EXPLOSION PROOF SEALING FITTINGS INSTALLED IN

THE INTERIOR OF THE CONTROL ROOM PER NEC 501.15,

OR AS SHOWN, AND WHERE THE CONDUIT LEAVES THE

HAZARDOUS/CLASSIFIED ZONE.

3. ALL METALLIC CONDUITS THAT ARE NOT ATTCHED TO A

GROUND PANEL OR ENCLOSURE SHALL BE GROUNDED

USING A GROUNDED BUSHING.

T-501

KEYED NOTES:

1. PROVIDE WEATHERPROOF CONNECTION TO EYE WASH

WATER LINE HEAT TRACE CABLE WITH GFI PROTECTED

CONNECTION BOX PROVIDED WITH HEAT TRACE CABLE.

A

M E

N D

M E

T

D

P E

Sheets and Views
EP101 PUMP HOUSE POWER PLAN