EP101 PUMP HOUSE POWER PLAN.pdf
PDF 585 KB Posted
- Solicitation number
- W912WJ20R0011
About this file
This document contains a federal contract opportunity for construction services. The U.S. Army Corps of Engineers New England District will issue a solicitation to replace the fuels storage complex at the Quonset Point Rhode Island Air National Guard Station. The project scope includes replacing the truck offload and fillstand positions, associated pumping, filtration, and fuel handling equipment. A new 600 GPM capacity pumphouse will be constructed along with control room, offload skids, fuel pumps, filter/separator vessels, truck fillstand equipment, valves, piping and electrical components. Existing storage tanks will be reused with the new system. Construction will be phased to allow the current system to operate until most of the replacement is complete. The estimated value is between $5-10 million. The NAICS code is 236220. The procurement will be a small business set-aside using Best Value Tradeoff procedures. The solicitation number is W912WJ20R0011.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EF-1
PH-2
ACCU-1
EUH-1
PH-1
EUH-2
EUH-3
AHU-1
M
IP-3J
R11
SHA
TO MCC
R11
TO MCC
C15
M
IP-2
J
R10
SHA
TO MCC
R10
TO MCC
C15
M
IP-1J
R9
SHA
TO MCC
R9
TO MCC
C15
FS
FS
FS
FS
M
PRP-1
PP2-5
SHA
TO MCC
C15
TO PCP
C5
TO PCP
C5
TO PCP
C5
TO PCP
C5
FS
S M
E
P
PP1-18
TO EFSO
C8
EFSO
MCC
PCP
ATG
PP1
H W
P
H W
P
TO PCP
C4
H W
P
H W
P
H WP
H WP
TO PCP
C4
TO PCP
C4
EFSO-5
TO EFSO
C1
EFSO-4
TO EFSO
C1
EFSO-6
EFSO-7
EFSO-2
TO EFSO
C1
TO EFSO
C1
TO EFSO
C1
L C
T C
PP1-16
S
FSCV-I3
TO EFSO
C28
S
FSCV-I2
TO EFSO
C27
S
FSCV-I1
TO EFSO
C26
PP1-31
PP1-33
PP1-35
PP1-37
PP1-12,14
60/2/3R
J
SM/2P/3R
PP1-13,15
J
PP1-21,23
PP2-3
J
J
PP1-17,19
PP1-11
60/2/4X
PP1-5,7
PP1-2,4,6
PP1-8
PP1-9
F A
C P
PP2-20
GEN
TO GEN
CNTL CABLE PER MFR
WH-1
100/3/3R
TO MCC
EFSO-1
M
PP1-10
PP2
HP
TO EFSO
C1
S
3/EP
S
3/EP
EFSO-3
TO EFSO
C1
WP
WP
WP
WP
WP
PP1-1,3
TELE-
COM
HP-5
J
F I L E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D
2 3
C
4 5
A
B
D A
T E
F I
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
S M
B L
D E
S C
R I P
T I O
N
C O
N T
R A
C T
O
SHEET
IDENTIFICATION
D A
T E
A P
P R
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
--S E
P T
E M
B E
R
A N
S I
D
OMAHA DISTRICT
S E
A L
D E
S C
S
R
E P
L A
C
F
U E
L
F
A C
I L
I T
I E
S
Q U
O N
S E
T
A
I R
T
I O
N A
L
G
U A
D
B
S
E
N O
R T
H
K
I N
G S
T O
W N
R
H O
D
I
L A
N D
R
READY TO ADVERTISE (RTA)
PROFESSIONAL
G EO R G I A
D O
UG L A S P . E NG
E
L
ENG I NE ER
REGI STERED
No. 41840
EP101
P U
M
H
U
W
A
N
D
E
N G
E L
E
J A
C K
S O
N M
F
U R
R
C
L A
Y S
O N
E
P D
W G
PUMP HOUSE POWER PLAN
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
4 0 4 8
GENERAL NOTES:
1. THE ENTIRE AREA INSIDE THE PUMP HOUSE, EXCEPT
THE VOLUME INSIDE THE CONTROL ROOM AND RISER
ROOM, SHALL BE CONSIDERED A CLASS 1, DIVISION 1
HAZARDOUS LOCATION BASED ON PROXIMITY TO
FUELING EQUIPMENT (AND TYPE OF EQUIPMENT) AND
PIPING, PER NEC ARTICLE 500. ALL ELECTRICAL
EQUIPMENT INSTALLED WITHIN THE HAZARDOUS AREA
SHALL BE SPECIFICALLY APPROVED BY UL FOR THE
SPECIFIC HAZAROUS AREA CLASSIFICATION. ALL BOXES
AND CABINETS PROVIDED IN HAZARDOUS AREAS SHALL
BE DUAL LISTED NEMA 7/4X.
2. EACH CONDUIT ORIGINATING IN OR PASSING THROUGH
OR UNDER A HAZARDOUS AREA AND PENETRATING
CONTROL ROOM WALLS, ROOF, OR FLOOR SHALL HAVE
EXPLOSION PROOF SEALING FITTINGS INSTALLED IN
THE INTERIOR OF THE CONTROL ROOM PER NEC 501.15,
OR AS SHOWN, AND WHERE THE CONDUIT LEAVES THE
HAZARDOUS/CLASSIFIED ZONE.
3. ALL METALLIC CONDUITS THAT ARE NOT ATTCHED TO A
GROUND PANEL OR ENCLOSURE SHALL BE GROUNDED
USING A GROUNDED BUSHING.
T-501
KEYED NOTES:
1. PROVIDE WEATHERPROOF CONNECTION TO EYE WASH
WATER LINE HEAT TRACE CABLE WITH GFI PROTECTED
CONNECTION BOX PROVIDED WITH HEAT TRACE CABLE.
A
M E
N D
M E
T
D
P E
| Sheets and Views |
| EP101 PUMP HOUSE POWER PLAN |
File details come from the government source that posted it. Updated .