This document provides information on an upcoming federal contract solicitation for construction services. The U.S. Army Corps of Engineers will issue a solicitation to replace the fuels storage complex at the Quonset Point Rhode Island Air National Guard Station, including a new 600 gallon per minute pumphouse, offload skids, fuel pumps, filter vessels, fillstand equipment, piping and electrical work. The project value is estimated between $5-10 million. The requirement will be set aside for small businesses and use best value tradeoff procedures. Construction will be phased to allow continued system operations during work.

View the file

Other files

File Type Posted
Amendment 0010.pdf PDF
A-202 BUILDING SECTIONS.pdf PDF
Amendment 0009 - G-009 PHASING PLAN 1.pdf PDF
M-603 FUEL SYSTEM FLOW DIAGRAM (2 OF 2).pdf PDF
M-302 FUELING SYSTEM PIPING ELEVATIONS (2 OF 2).pdf PDF
Amendment 0009 - ES403 ENLARGED SITE PLAN (3 OF 4).pdf PDF
EP101 PUMP HOUSE POWER PLAN.pdf PDF
Amendment 0009 - ES404 ENLARGED SITE PLAN (4 OF 4).pdf PDF
A-002 CODE ANALYSIS.pdf PDF
A-103 REFLECTED CEILING AND ROOF PLANS.pdf PDF
ES101 ELECTRICAL OVERALL SITE PLAN.pdf PDF
Amendment 0009 - EP601 POWER DIAGRAMS AND SCHEDULES.pdf PDF
Amendment 0009 - Spec Section 01 22 00 - 05OCT20.pdf PDF
Amendment 0009.pdf PDF
Amendment 0009 - ES508 STORAGE TANK ELECTRICAL ELEVATION.pdf PDF
EP602 ELECTRICAL SCHEDULES.pdf PDF
Amendment 0009 - 26 24 19.00 40.pdf PDF
EP603 ELECTRICAL SCHEDULES.pdf PDF
Amendment 0009 - Schedule of Special Inspections.pdf PDF
E-001 ELECTRICAL LEGEND AND ABBREVIATIONS.pdf PDF
M-403 TRUCK FILLSTAND PIPING LAYOUT PLAN AND ELEVATION.pdf PDF
Quonset Modified document and comments.pdf PDF
ES507 PRODUCT RECOVERY TANK PLAN AND DETAIL.pdf PDF
EP604 ELECTRICAL SCHEDULES.pdf PDF
A-302 WALL SECTIONS AND DETAILS.pdf PDF
A-101 FLOOR PLAN.pdf PDF
Amendment 0008 - 03 30 00.pdf PDF
Amendment 0008 - G-013 MISCELLANEOUS WORK ITEMS AND NOTES.pdf PDF
Amendment 0008.pdf PDF
Amendment 0008 - 32 13 13.06.pdf PDF
Amendment 0008 - ES401 ENLARGED SITE PLAN (1 OF 4).pdf PDF
Amendment 0008 - 33 52 43.11.pdf PDF
Amendment 0008 - C-407 PUMPHOUSE AND PRT GRADING AND DRAINAGE PLAN - PHASE 1.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006 - Wage Determination.pdf PDF
Amendment 0006 - 1802100MH-101-R1.pdf PDF
Amendment 0006 - 09 90 00 (Q - RTA - Bolded-2).pdf PDF
Amendment 0006 - 10 71 19.16 - Q - RTA - Bolded-2.pdf PDF
Amendment 0006 - 33 56 19 - Q - RTA - Bolded-2.pdf PDF
Amendment 0006 - A-501 (SCHEDULES).pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Solicitation Drawing.zip ZIP file
Supplemental Price Breakdown to the Bidding Schedule.xlsx XLSX spreadsheet
Specs - Volume 1.pdf PDF
Specs - Volume 2.pdf PDF
W912WJ20R0011_Solicitation.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to provide responses to Bidder Inquiries/Request for Information and to provide updated w age

1. CONTRACT ID CODE PAGE OF PAGES

1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ20R0011

X 9B. DATED (SEE ITEM 11)

10-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Sep-2020

CODE

US ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA ROAD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ20R0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

Amendment 0006 Responses

1. Information: The RFP is provided with section 33 01 50.60 CLEANING OF PETROLEUM STORAGE TANKS. Thank 1 and Tank 2 will be cleaned in advance of the respective tank modification work. As the newly installed piping system is not a loop the fuel stork tanks should not be contaminated during flushing /commissioning.

Question Please confirm that it is not expected that the fuel storage tanks be again cleaned after flushing / commissioning or otherwise clarify and further direct.

GOVERNMENT RESPONSE: The fuel system is in a loop configuration and additional tank cleaning should be assumed during the flushing and system commissioning phase. (ProjNet ID 8803343)

2. Information: Section 33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT paragraph 2.8 TRUCK OFFLOAD SYSTEM states, "The truck offload system must be a factory fabricated and skid mounted unit."

As the skids are factory fabricated, they will be factory coated with a high-quality coating system. Review of section 33 52 43.11 does not indicate that the skids are to be coated in accordance with Section 09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES, nor with the skid manufactures have access to that coating system at the factory.

Question: Please confirm that the skid manufacturer’s high quality coating system is acceptable for the skids or otherwise clarify and further direct. (ProjNet ID 8803149)

GOVERNMENT RESPONSE: Skid manufacturer's high quality coating system is acceptable.

3. Information: Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS paragraph 3.1 PROTECTION OF NATURAL RESOURCES states, "Minimize interference with, disturbance to, and damage to fish, wildlife, and plants, including their habitats. Prior to the commencement of activities, consult with the Installation Environmental Office, regarding rare species or sensitive habitats that need to be protected. The protection of rare, threatened, and endangered animal and plant species identified, including their habitats, is the Contractor's responsibility. The following species are known and could be affected within the construction area: State-threatened Norther-Long Eared Bat, Grasshopper Sparrows and Least Terns have been noted near the beach between Quonset and Davisville. Killdeer nest in the gravel in the POL yard during summer months; nests of migrating birds, such as Killdeer, are protected. No critical habitats are at this location. Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work that is consistent with the requirements of the Installation Environmental Office or as otherwise specified. Confine construction activities to within the limits of the work indicated or specified."

Upon review of the prior noted paragraph it is noted that the following species are known and could be affected within the construction area: State-threatened Norther-Long Eared Bat, Grasshopper Sparrows, Least Terns, and Killdeer. Additionally, the Killdeer nest in the gravel in the POL yard during summer months which are migrating birds, are to be protected. The gravel in the POL yard, which is a Killdeer nesting area is to be removed, then re-spread during the progress of the project.

Questions:

A. Is construction activity to be curtailed for known impacts to the "nesting season"? Then if so at what point can it again proceed?

B. Should nesting occur is construction activity to be curtailed until the "nesting season" is over?

C. Similarly, what impacts to the constitution activities and construction schedule as related to State-threatened Norther-Long Eared Bat, Grasshopper Sparrows and Least Terns, are to be allotted for? (ProjNet

ID 8802766)

GOVERNMENT RESPONSE: Response to A and B: The contractor will be required to do the following:

1. Remove the gravel prior to the nesting season, on or about April 15th.

2. Stockpile the gravel outside the yard; cover and secure with 10 mil plastic sheeting. Stockpile will be within one mile of the project site and will be designated at the Pre-Construction Kickoff Meeting.

3. If a killdeer nest is found, an approximate 10' x 10' area around the nest shall be cordoned off using brightly colored construction cones, barricade tape or other means. The contractor shall maintain the protected area until the nesting is complete and the Contracting Officer has approved its removal (typically 4 weeks).

Response to C. None anticipated. The Northern Long Eared Bat has been listed by the US Fish & Wildlife Service as a threatened species in wooded areas in the state. There are no Northern Long Eared Bat habitats or wilderness areas in the immediate vicinity of the Quonset installation that have been designated as critical that are known to RIANG. According to a GIS Specialist with the RI Dept. of Environmental Management, the Least Tern and the Grasshopper Sparrow (both state threatened) have been noted in the vicinity of Davol Pond and a small beach between Quonset and Davisville. A Wildlife Specialist with the US Department of Agriculture who maintains a regular presence on the Quonset base (RIANG-leased property) has not seen or heard either of these species during his surveys. The beach is northeast of the Quonset base. Davol Pond is approximately one mile north of, and inland from, the base.

4. Drawings A-501, Louver Schedule indicates two louvers are required and are 1'6" x 8" ea. Drawing A-201 detail A shows one louver at approximately 1'6" X 8" and Drawing A-201 detail C shows one louver at approximately 8" x 8". Please clarify the number of louvers and their size? (ProjNet ID 8789104)

GOVERNMENT RESPONSE: The louvers should be provided as listed in the Louver schedule. See Revised Drawing A-501 Schedule.

5. Drawings A-501, Louver Schedule indicates two louvers are required and are 1'6" x 8" ea. Drawing A-201 detail A shows one louver at approximately 1'6" X 8" and Drawing A-201 detail C shows one louver at approximately 8" x 8". Please clarify the number of louvers and their size? (ProjNet ID 8789108)

GOVERNMENT RESPOSNE: Duplicate question. Refer to response to 8789104.

6. Information: Sheet A103 Reflected Ceiling Plan (annotated copy attached) indicates limits of 2-hour fire rated wall. Sheet A101 (annotated copy attached) indicated two VW1 windows and one W01 window. The two VW1 are located in a 2-hour fire rated wall. Sheet A501 Window Schedule indicates WX Window 01 with Glass GL-2 and provide remarks "120-minute Fire Rated Assembly" Sheet A501 Window Schedule indicates VWX Window 1 with Glass GL-3 Sheet A501 Glass Schedule indicated GL-2 "1" Insulated Glazing" and GL-3 "3/54" Fire Resistive Glazing". Provision of GL-2 "1" Insulated Glazing" in WX Window 01 will not provide for a 120-minute Fire Rated Assembly, through given the location of Window W01 it would not appear that a 120-minute Fire Rated Assembly would in fact be required.

Question: Please clarify and confirm 1. Whereat (for what window) a 120-minute Fire Rated Assembly is required and 2. What glazing, GL-2 or GL-3, is required in Window W01 and VW1. (ProjNet ID 8773802)

GOVERNMENT RESPONSE: 1. In the Window Schedule, sheet A-501, the note '120-MINUTE FIRE RATED ASSEMBLY' is incorrectly assigned to Window 'w01'. In fact, this note should have been assigned to 'VW1'. See revised drawing a-501.

2. What glazing, GL-2 or GL-3, is required in Window W01 and VW1?

a. Window W01: Glazing 'GL-2' – 1" insulated glazing

b. Window VW1: Glazing 'GL-3' – ¾" Fire resistive glazing

c. Glazing 'GL-1' is to be installed as vision lites in the doors

7. Reference Detail 1 on Drawing S-306. The containment basin section detail depicts a "Continuous Liner" and "Continuous Protection Board Outside of Liner" on the full height of the containment basin walls, and the liner extends underneath the containment basin mat slab. No specification was included with the RFP to address this continuous liner or protection board, and no other material properties were given. Please provide the appropriate specification for the liner system. (ProjNet ID 8776379)

GOVERNMENT RESPONSE: See new spec section 33 55 19

8. The canopy spec 13 34 19.20 paragraph 2.3.1 indicates painting conforming to SSPC Paint 15 which is a primer only so the canopy frame does not come factory coated.

Specification 09 90 00 includes no exterior painting specification, only a specification for interior metal and other surfaces. It appears Specification 09 97 13.27 "Exterior Coating of Steel Structures" is to be used for exterior miscellaneous metal items and the canopy structure. This specification is also used for the carbon steel piping and exterior fuel tank repairs. Use of 09 97 13.27 requires a full blast prep and the special coater qualifications. The canopy would have to be erected in 2 phases to allow the blasting/painting to be completed prior to installation of the roofing and siding. Please confirm 09 97 13.27 is to be used for the canopy structural steel frame. (ProjNet ID 8804037)

GOVERNMENT RESPONSE:

See new spec section 09 90 00. Added Section 1.11.1.2 Exterior Painting.

Spec section 09 97 13.27 does not apply to the refueling canopies or to the Pumphouse structure.

9. The canopy spec 13 34 19.20 paragraph 2.3.1 indicates painting conforming to SSPC Paint 15 which is a primer only so the canopy frame does not come factory coated.

Specification 09 90 00 includes no exterior painting specification, only a specification for interior metal and other surfaces. It appears Specification 09 97 13.27 "Exterior Coating of Steel Structures" is to be used for exterior miscellaneous metal items and the canopy structure. This specification is also used for the carbon steel piping and exterior fuel tank repairs. Use of 09 97 13.27 requires a full blast prep and the special coater qualifications. The canopy would have to be erected in 2 phases to allow the blasting/painting to be completed prior to installation of the roofing and siding. Please confirm 09 97 13.27 is to be used for the canopy structural steel frame. (ProjNet ID 8804038)

GOVERNMENT RESPONSE: Duplicate entry. See response to 8804037.

10. Information: Reference annotated sheet MH101, a copy of which is attached. MVD is connected two an 18X8 Intake Lover, and a motorized damper is connected to 18X8 Exhaust Louver LV-2. The louver associated with the MVD stops short of the exterior siding, which is believed to be in error. The motorized damper associated with the exhaust damper is located in the 8" CMH wall which is believed to be in error.

The refrigeration line set and condensate drain penetrate the interior 8" CMU wall and run through the exterior siding. The Hazardous Environment rating of the space between the control room block wall and the interior of the metal building siding is believed to be a Class 1 DIV 1 Hazardous Environment though not indicated as such on Sheet E002 Plan.

Questions:

1. Please confirm that the MVP and motorized dampers are to be located in the nonhazardous environment (control room) side with the duct work transitioning within the control side or otherwise clarify and further direct.

2. Please advise of any sealing requirement related to duct work within the space between the control room block wall and the interior of the metal building siding.

3. Please advise of any sealing requirements related to duct work, refrigeration line set, electrical conduit and condensate drain at the exterior or interior side of the control room 8" CMU within the space between the control room block wall.

(ProjNet ID8774040)

GOVERNMENT RESPONSE:

1. The confined spaces between the Control Room CMU and the exterior Metal Panel (IMP) wall will be rendered non-hazardous by closing-off the open gaps at the NE and NW corners of the Control Room's CMU enclosure, and by extending the Control Room's eastern wall up from the Control Room's roof to the underside of the pump house roof with a drywall on metal stud-based, 2-hr-rated firewall (U.L.# U412). The top of the firewall will terminate at the underside of the pump house roof. The exemption in IBC Section

706.6.2 allows for the wall to terminate without extending to 30 inches above the roof as is normal for a firewall. However, the roof's first structural bay (between col lines 1 & 2) and part of the adjacent bay (out to 4'-0" from the firewall) will have to be modified to be 1-hr-rated (U.L. #P518). These modifications will be included in the IFC issue. See Revised Drawing MH-101.

2. With the measures described above, no additional sealing should be necessary.

3. With the measures described in the response to question #1 above, no additional sealing should be necessary beyond what has been instructed in the specifications.

11. Section 10 71 19.16 Removable Flood Barriers 2.2.1 Watertight Door and Window Panels indicated the basis of design for FRA Door Panel and FRA Window Panels. Please clarify if the doors and exterior window are required to have these removable floor barriers or is just the door areas required? If windows are required please clarify if both the exterior window and the two interior (between the control room and pump house) windows require these barriers? (ProjNet ID 8789144)

GOVERNMENT RESPONSE: The design height of the flood control barrier concrete supports was based on information based on Federal and State regulations, and on UFC 3-201-01 table 2-1. Woodard and Curran, an environmental consultant, in consensus with the Base and State environmental and QDC representatives has estimated the pump house's minimum FFE at 16.05 ft. Quonset Vertical Datum (QVD). The FEMA map 44009C0106J, using NAVD88 as its vertical datum, places the area of the project inside a 100-year flood plain with an elevation of +12 ft MSL. The Pump house's minimum Finished Floor Elevation (ASCE Flood Design Class 3), in terms of the North American Vertical Datum of 1988 (NAVD88) should be 14-15 ft. b based on UFC 3-201-01 table 2-1. The window sills are above this line so they do not require protection.

See New Spec Section 10 71 19.16

12. 1. Please provide the loading requirements for the flood mitigation devices including wave, wind, and impact loads. Please see, 107117.16

2. Please comment on the inclusion of language that excludes all substitutions for the FRA material specified. Please see, 107119.16 Section 2.1.2. (ProjNet ID 8796355)

GOVERNMENT RESPONSE:

1. See response to ProjNet ID8789144. See also New Spec Section 10 71 19.16

2. The s chapter 2.1 MANUFACTURERS, of specifications section 107119.16 is to be deleted in its entirety (to include lines items 2.1.1 and 2.1.2). The remainder of PART 2 PRODUCTS will be renumbered, starting with 2.1 "EQUIPMENT". See New Spec Section 10 71 19.16

13. Drawing ES403, Note 6 the power and control circuits for the personnel gate lock and control stations are not shown on the conduit schedule. Please clarify wire size requirements. (No ID#)

GOVERNMENT RESPONSE: The Contractor shall assume 2#12&1#12G for power to the gate lock from Panel P1 in Building 14 and 8#14&1#14G to the control stations (4 to each). This wiring will fit in a 1" conduit. The actual wiring required shall be confirmed with the approved shop drawings for the gate operator and control equipment. Provide a new 20A, 1 pole bolt-on circuit breaker to be installed in Panel P1 which is a Square D Type NQOB panelboard.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

WAGE DETERMINATION

"General Decision Number: RI20200001 08/14/2020

Superseded General Decision Number: RI20190001

State: Rhode Island

Construction Types: Building, Heavy (Heavy and Marine) and Highway

Counties: Rhode Island Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY, HIGHWAY AND MARINE

CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 02/21/2020

3 03/06/2020 4 03/13/2020 5 05/01/2020 6 05/22/2020 7 06/05/2020 8 06/19/2020 9 07/24/2020 10 08/14/2020

ASBE0006-006 12/01/2019

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 36.60 22.40

ASBE0006-008 09/01/2019

Rates Fringes

Asbestos Worker/Insulator Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems.$ 43.60 29.90

BOIL0029-001 01/01/2017

Rates Fringes

BOILERMAKER......................$ 42.42 24.92

BRRI0003-001 06/01/2020

Rates Fringes

Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 42.55 28.02

BRRI0003-002 03/01/2020

Rates Fringes

Marble Setter, Terrazzo Worker & Tile Setter.............$ 40.78 28.92

BRRI0003-003 03/01/2020

Rates Fringes

Marble, Tile & Terrazzo Finisher.........................$ 34.10 27.88

CARP0330-001 06/05/2020

Rates Fringes

CARPENTER (Includes Soft Floor Layer).....................$ 39.13 28.60 Diver Tender.....................$ 40.13 28.60

DIVER............................$ 50.73 28.60

Piledriver.......................$ 39.13 28.60

WELDER...........................$ 40.13 28.60

FOOTNOTES:

When not diving or tending the diver, the diver and diver tender shall receive the piledriver rate. Diver tenders shall receive $1.00 per hour above the pile driver rate when tending the diver.

Work on free-standing stacks, concrete silos & public utility electrical power houses, which are over 35 ft. in height when constructed: $.50 per hour additional.

Work on exterior concrete shear wall gang forms, 45 ft. or more above ground elevation or on setback: $.50 per hour additional.

The designated piledriver, known as the ""monkey"": $1.00 per hour additional.

CARP1121-002 01/06/2020

Rates Fringes

MILLWRIGHT.......................$ 39.07 29.15

ELEC0099-002 06/01/2020

Rates Fringes

ELECTRICIAN......................$ 41.61 57.24%

Teledata System Installer........$ 31.21 13.10%+14.93

FOOTNOTES:

Work of a hazardous nature, or where the work height is 30

ft. or more from the floor, except when working OSHA-approved lifts: 20% per hour additional.

Work in tunnels below ground level in combined sewer outfall:

20% per hour additional.

ELEV0039-001 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 53.25 34.765+a+b

FOOTNOTES:

A. PAID HOLIDAYS: New Years Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

B. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0057-001 06/01/2020

Rates Fringes

Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, wind turbines, subterranean & other marine and heavy construction work) GROUP 1.....................$ 42.55 26.95+a GROUP 2.....................$ 40.55 26.95+a GROUP 3.....................$ 36.17 26.95+a GROUP 4.....................$ 33.32 26.95+a GROUP 5.....................$ 39.60 26.95+a GROUP 6.....................$ 30.40 26.95+a GROUP 7.....................$ 24.40 26.95+a GROUP 8.....................$ 36.25 26.95+a GROUP 9.....................$ 40.17 26.95+a

a. BOOM LENGTHS, INCLUDING JIBS:

150 feet and over + $ 2.00 180 feet and over + $ 3.00 210 feet and over + $ 4.00 240 feet and over + $ 5.00 270 feet and over + $ 7.00 300 feet and over + $ 8.00 350 feet and over + $ 9.00 400 feet and over + $10.00

a. PAID HOLIDAYS:

New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTES:

Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks

GROUP 2: Digging machine, Ross Carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, graders, front end loader (3 yds.

and over), vibratory hammer & vacuum truck, roadheaders, forklifts, economobile type equipment, tunnel boring machines, concrete pump and on site concrete plants.

GROUP 3: Oilers on cranes.

GROUP 4: Oiler on crawler backhoe.

GROUP 5: Bulldozer, bobcats, skid steer loader, tractor, scraper, combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile-powered sweeper (3-yd. capacity), 8-ft. sweeper minimum 65 HP).

GROUP 6: Well-point installation crew.

GROUP 7: Utility Engineers and Signal Persons

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator and light plant, gas and electric driven pump and air compressor.

GROUP 9: Boat & tug operator.

ENGI0057-002 05/01/2020

Rates Fringes

Power Equipment Operator (highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects that do not span water) GROUP 1....................$ 35.70 26.95+a GROUP 2....................$ 30.40 26.95+a GROUP 3....................$ 24.40 26.95+a

GROUP 4....................$ 30.98 26.95+a GROUP 5....................$ 34.68 26.95+a GROUP 6....................$ 34.30 26.95+a GROUP 7....................$ 29.95 26.95+a GROUP 8....................$ 31.33 26.95+a GROUP 9....................$ 33.28 26.95+a

a. FOOTNOTE: a. Any employee who works three days in the week in which a holiday falls shall be paid for the holiday.

a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Digging machine, crane, piledriver, lighter, locomotive, derrick, hoist, boom truck, John Henry's, directional drilling machine, cold planer, reclaimer, paver, spreader, grader, front end loader (3 yds. and over), vacuum truck, test boring machine operator, veemere saw, water blaster, hydro-demolition robot, forklift, economobile, Ross Carrier, concrete pump operator and boats

GROUP 2: Well point installation crew

GROUP 3: Utlity engineers and signal persons

GROUP 4: Oiler on cranes

GROUP 5: Combination loader backhoe, front end loader (less than 3 yds.), forklift, bulldozers & scrapers and boats

GROUP 6: Roller,skid steer loaders, street sweeper

GROUP 7: Gas and electric drive heater, concrete mixer, light plant, welding machine, pump & compressor

GROUP 8: Stone crusher

GROUP 9: Mechanic & welder

ENGI0057-003 06/01/2020

BUILDING CONSTRUCTION

Rates Fringes

Power Equipment Operator GROUP 1....................$ 41.82 26.95+a GROUP 2....................$ 39.82 26.95+a GROUP 3....................$ 39.60 26.95+a GROUP 4....................$ 35.60 26.95+a GROUP 5....................$ 32.75 26.95+a

GROUP 6....................$ 38.90 26.95+a GROUP 7....................$ 38.47 26.95+a GROUP 8....................$ 35.79 26.95+a a.BOOM LENTHS, INCLUDING JIBS:

150 ft. and over: + $ 2.00 180 ft. and over: + $ 3.00 210 ft. and over: + $ 4.00 240 ft. and over: + $ 5.00 270 ft. and over: + $ 7.00 300 ft. and over: + $ 8.00 350 ft. and over: + $ 9.00 400 ft. and over: + $10.00

a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTE: Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks.

GROUP 2: Digging machine, Ross carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer and vacuum truck

GROUP 3: Telehandler equipment, forklift, concrete pump & on-site concrete plant

GROUP 4: Fireman & oiler on cranes

GROUP 5: Oiler on crawler backhoe

GROUP 6: Bulldozer,skid steer loaders,bobcats, tractor, grader, scraper,combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile powered sweeper (3 yds. capacity), 8-ft. sweeper (minimum 65 hp)

GROUP 7: Well point installation crew

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator for light plant, gas and electric driven pump & air compressor

IRON0037-001 09/16/2019

IRONWORKER.......................$ 36.27 28.98

LABO0271-001 06/02/2019

BUILDING CONSTRUCTION

Rates Fringes

LABORER

GROUP 1.....................$ 31.80 25.05

GROUP 2.....................$ 32.05 25.05

GROUP 3.....................$ 32.55 25.05

GROUP 4.....................$ 32.80 25.05

GROUP 5.....................$ 33.80 25.05

LABORERS CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems]

GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator

GROUP 3: Pre-Cast Floor & Roof Plank Erectors

GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster

GROUP 5: Toxic Waste Remover

LABO0271-002 06/02/2019

HEAVY AND HIGHWAY CONSTRUCTION

Rates Fringes

LABORER

COMPRESSED AIR

Group 1....................$ 49.23 23.50 Group 2....................$ 38.75 23.50 Group 3....................$ 51.23 23.50

FREE AIR

Group 1....................$ 41.30 23.50 Group 2....................$ 38.75 23.50 Group 3....................$ 43.30 23.50

LABORER

Group 1....................$ 31.80 23.05 Group 2....................$ 32.05 23.05 Group 3....................$ 32.80 23.05 Group 4....................$ 25.30 23.05 Group 5....................$ 33.80 23.05

OPEN AIR CAISSON,

UNDERPINNING WORK AND

BORING CREW

Bottom Man.................$ 37.80 23.05 Top Man & Laborer..........$ 36.85 23.05

TEST BORING

Driller....................$ 38.25 23.05 Laborer....................$ 36.85 23.05

LABORER CLASSIFICATIONS

GROUP 1: Laborer; Carpenter tender; Cement finisher tender;

Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries

GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator;

Pipelayer; Pipe trench bracer

GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster

GROUP 4: Flagger & signaler

GROUP 5: Toxic waste remover

LABORER - COMPRESSED AIR CLASSIFICATIONS

GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air

GROUP 2: Change house attendant, powder watchperson, top person on iron

GROUP 3: Hazardous waste work within the ""HOT"" zone

LABORER - FREE AIR CLASSIFICATIONS

GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator

GROUP 2: Change house attendant, powder watchperson

GROUP 3: Hazardous waste work within the ""HOT"" zone

PAIN0011-005 06/01/2020

Rates Fringes

PAINTER

Brush and Roller............$ 35.62 22.55 Epoxy, Tanks, Towers, Swing Stage & Structural Steel.......................$ 37.62 22.55 Spray, Sand & Water Blasting....................$ 38.62 22.55 Taper.......................$ 36.37 22.55 Wall Coverer................$ 36.12 22.55

PAIN0011-006 06/01/2020

Rates Fringes

GLAZIER..........................$ 39.18 22.55

FOOTNOTES:

SWING STAGE: $1.00 per hour additional.

PAID HOLIDAYS: Labor Day & Christmas Day.

PAIN0011-011 06/01/2020

Rates Fringes

Painter (Bridge Work)...........$ 52.25 22.55

PAIN0035-008 06/01/2011

Rates Fringes

Sign Painter.....................$ 24.79 13.72

PLAS0040-001 06/03/2019

BUILDING CONSTRUCTION

CEMENT MASON/CONCRETE FINISHER...$ 36.00 27.15

FOOTNOTE: Cement Mason: Work on free swinging scaffolds under 3 planks width and which is 20 or more feet above ground and any offset structure: $.30 per hour additional.

PLAS0040-002 07/01/2019

HEAVY AND HIGHWAY CONSTRUCTION

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 32.85 22.20

PLAS0040-003 07/01/2019

Rates Fringes

PLASTERER........................$ 37.55 27.50

PLUM0051-002 03/02/2020

Rates Fringes

Plumbers and Pipefitters.........$ 43.69 30.05

ROOF0033-004 06/01/2020

Rates Fringes

ROOFER...........................$ 39.15 27.31

SFRI0669-001 01/02/2020

Rates Fringes

SPRINKLER FITTER.................$ 45.67 24.74

* SHEE0017-002 07/01/2020

Rates Fringes

Sheet Metal Worker...............$ 38.29 36.72

TEAM0251-001 05/01/2019

HEAVY AND HIGHWAY CONSTRUCTION

TRUCK DRIVER

GROUP 1....................$ 27.96 26.8525+A+B+C

GROUP 2....................$ 27.61 26.8525+A+B+C

GROUP 3....................$ 27.66 26.8525+A+B+C

GROUP 4....................$ 27.71 26.8525+A+B+C

GROUP 5....................$ 27.81 26.8525+A+B+C

GROUP 6....................$ 28.21 26.8525+A+B+C

GROUP 7....................$ 28.41 26.8525+A+B+C

GROUP 8....................$ 27.91 26.8525+A+B+C

GROUP 9....................$ 28.16 26.8525+A+B+C

GROUP 10....................$ 27.96 26.8525+A+B+C

FOOTNOTES:

A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, plus Presidents' Day, Columbus Day, Veteran's Day & V-J Day, providing the employee has worked at least one day in the calendar week in which the holiday falls.

B. Employee who has been on the payroll for 1 year or more but less than 5 years and has worked 150 Days during the last year of employment shall receive 1 week's paid vacation; 5 to 10 years - 2 weeks' paid vacation; 10 or more years - 3 week's paid vacation.

C. Employees on the seniority list shall be paid a one hundred dollar ($100.00) bonus for every four hundred (400) hours worked, up to a maximum of five hundred dollars ($500.00)

All drivers working on a defined hazard material job site shall be paid a premium of $2.00 per hour over applicable rate.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Pick-up trucks, station wagons, & panel trucks

GROUP 2: Two-axle on low beds

GROUP 3: Two-axle dump truck

GROUP 4: Three-axle dump truck

GROUP 5: Four- and five-axle equipment

GROUP 6: Low-bed or boom trailer.

GROUP 7: Trailers when used on a double hook up (pulling 2 trailers)

GROUP 8: Special earth-moving equipment, under 35 tons

GROUP 9: Special earth-moving equipment, 35 tons or over

GROUP 10: Tractor trailer

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)

File details come from the government source that posted it. Updated .