This document provides an amendment to a solicitation for the construction of a fuels storage complex replacement project at the Quonset Point Rhode Island Air National Guard Station. The amendment responds to bidder questions by clarifying technical specifications and drawings. The project scope includes replacing truck offload and fillstand positions, constructing a new 600 GPM pumphouse with control room and associated equipment, and upgrading an existing refueler parking area. The estimated value is between $5-10 million. The U.S. Army Corps of Engineers is the contracting agency. The solicitation will be set aside for small businesses and use a best value tradeoff evaluation.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to provide responses to bidder inquiries/request for information. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ20R0011
X 9B. DATED (SEE ITEM 11)
10-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Sep-2020
CODE
US ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA ROAD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ20R0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
Amendment 0004 RFIs
1. The spec requires an ANSI class 150 flanged meter with a working pressure of 275 psig at 300 gpm for the truck fillstands. The drawings require a 3" flanged meter. The standard single cased aluminum meter for 300 gpm only has a maximum working pressure of 150 psi, due to the square flange to ANSI class 150 adapters. A double cased outer steel meter is available with 275 psig working pressure. The spec doesn't provide material requirements. Is a double cased outer steel meter with internal Aluminum components allowed? (ProjNet ID 8763069)
GOVERNMENT RESPONSE: Provide 4" size control valve and meter, and transition to 3" piping downstream of meter.
2. In the factor 1 experience, are you keeping this as a general contractors experience with the major critical aspects or the key subcontractor? Just want to clarify that unless a General Contractor has done a project with airline jet fuel stations then the project won't qualify as relative to that part of the project. ProjNet ID (8767222)
GOVERNMENT RESPONSE: See solicitation etter E, Factors, letter b “Submission Requirements for Factor 1” starting on page 12 of 86.
3. What are the wage rates for this project? (ProjNet ID 8767665)
GOVERNMENT RESPONSE: Wage rates are in the Solicitation document starting on page 71 of 86.
4. Sheet E002 Plan (annotated copy attached) indicates, "Entire Volume of Pump Room To Be Considered Class 1 DIV 1 Hazardous Environment". Question: What is the Hazardous Environment rating of the space between the control room block wall and the interior side of the metal building siding? (ProjNet ID 8773881)
GOVERNMENT RESPONSE: Please see Architectural response to Question 8774040, below: The confined spaces between the Control Room CMU and the exterior Metal Panel (IMP) wall will be rendered non-hazardous with the measures described in the Architectural response to Question 8774040.
5. Information: Section 26 41 00 LIGHTNING PROTECTION SYSTEM paragraph 1.4.4 Lightning Protection System Inspection Certificate states in part, "Provide certification from a commercial third-party inspection company whose sole work is lightning protection, stating that the lightning protection system complies with NFPA 780 and AFI 32-1065. Third-party inspection company cannot be the system installer or the system designer. Alternatively, provide a UL Lightning Protection Inspection Master Label Certificate for each facility indicating compliance to NFPA 780 and AFI 32-1065. In either case, AFI 32- 1065 takes precedence over NFPA 780, whether or not it is more stringent. Inspection must cover every connection, air terminal, conductor, fastener, accessible grounding point and other components of the lightning protection system to ensure 100% system compliance. This includes witnessing the tests for the resistance measurements for ground rods with test wells, and for continuity measurements for bonds. It also includes verification of proper surge protective devices for power, data and telecommunication systems.
Random sampling or partial inspection of a facility is not acceptable."
A UL Lightning Protection Inspection Master Label Certificate for each facility indicating compliance to NFPA 780 will in fact not be available as there are surge suppression devices required beyond that indicated in the electrical design as provided, for example typically located at electrical PANEL PP1 and PANEL PP2, on runs to equipment exteriors to the building.
Questions:
#1 Is the UL Lightning Protection Inspection Master Label Certificate for each facility indicating compliance to NFPA 780 to be issued without expectation for surge protection devices?
#2 Are the locations for surge protective device the result on an engineering study, in which case UL Lightning Protection Inspection Master Label Certificate for each facility indicating compliance to NFPA 780 could be issued without exception. (ProjNet ID 8774149)
GOVERNMENT RESPONSE: #1: Surge Protection Devices shall be provided for the power service entrance; the fire alarm service entrance and the data service entrance for the Pumphouse as stipulated in NFPA 780 Paragraphs 4.20.1 & 4.20.2 and as described in the Contract Documents (drawings and Specs).
The surge protection devices included with the canopy lighting fixtures are sufficient protection for the canopy lighting branch circuits.
#2: The surge protection devices included on the Drawings and in the Specifications are intended to comply with NFPA 780. The requirement for Power Service Entrance Surge Protection Devices (SPD) can be found on the Single Line and in Spec 26 20 00; the Fire Alarm Service Entrance SPD requirements can be found in the Fire Alarm Specs 28 31 64; the Telecom Service SPD requirements can be found on the Telecom Backboard Detail and in Spec 27 10 00 which references Spec 26 20 00; and the Exterior Lighting Fixture SPD requirements can be found in the Exterior Lighting Specs 26 56 00.
6. Assuming steel sheeting is an acceptable alternative to the temporary timber retaining wall, could the steel sheeting be left in place permanently and cut off just below grade instead of re-mobilizing and pulling all sheeting? (ProjNet ID 8776331)
GOVERNMENT RESPONSE: No, we need a uniform graded/compacted area here. Infiltration may create stability problems on the non-retained side.
7. Will a copy of the sign in sheet from the site visit be made available? (ProjNet ID 8802240)
GOVERNMENT RESPONSE: The site visit sign-in sheet was released with Amendment 0002.
8. Information - Equipment connections and feeds Reference: Drawings ES401 and EP602
In the middle of Drawing ES401 there are 2 home runs are shown going to panel PP2 circuits 25 and 27. In the panel schedule on drawing EP602 these circuits are listed as spare 120 volt 20 amp circuits.
Questions:
a. What equipment is being feed from this circuit?
b. What size conduit and conductors are required?
(ProjNet ID 8802520)
GOVERNMENT RESPONSE:
A. Circuits PP2:25 & 27 serve the Scully Overfill/Ground Proving panels on Fillstands 1 & 2. See Detail 1 on dwg EP502 for more info. Panel Schedule PP2 will be updated to show this. The load is 60W each.
B. Each homerun should be 2#12&1#12G-3/4"C.
9. Information - Equipment and control wiring Reference drawing ES401 and EP604 In the middle of drawing ES401 there are 2 home runs going to PCP with no circuit designation.
Questions:
a. What equipment is being controlled?
b. What size conduit and conductors are required?
(ProjNet ID 8802556)
GOVERNMENT RESPONSE:
A. The homeruns to the Pump Control Panel from Fillstands 1 & 2 are associated with the Scully Overfill/Ground Proving panels, the start-stop stations and the EFSO stations. See Detail 1 on dwg EP502 for more info.
B. Actual number of conductors required will be defined by the Pump Control Panel Manufacturer and confirmed with approved shop drawings. We recommend a 1"C for ease of conductor installation.
10. Information - Equipment feed Reference: Drawing ES401 At the bottom of drawing ES401 there are 2 home runs from the MCC to what appears to be 2 - 40 horsepower motors. There is no circuit designation for the circuits in the MCC.
Questions:
a. What equipment is being controlled?
b. What size conduit and conductors are required?
(ProjNet ID 8802578)
GOVERNMENT RESPONSE:
A. The homeruns to the MCC from Offload Skids 1 & 2 should be marked R12 and R13.
B. See the Single Line Diagram on dwg EP601 and the MCC Schedule on dwg EP603 for conduit and conductors required.
B. The homerun should be marked 2#10&1#10G-3/4"C.
11. It is specified that we are to take down the 100' Light Mast and return to Owner. Is Division 26 responsible for transporting the two 50' sections to storage? If so where is it being stored? And are there any specifications or lifting diagrams available? (ProjNet ID 8802654)
GOVERNMENT RESPONSE: The Contract does not designate who is responsible for demolition and removal of the existing tower light pole. The Contractor shall remove the pole from Government property and take to a reputable recycling facility. There are several in the area. The Contractor shall provide waste disposal weights and costs to the Contracting Officer every 6 months and at the conclusion of the project.
See SECTION 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT for these requirement and other guidelines.
12. Could you please define the symbols noted? (ProjNet ID 8802658)
GOVERNMENT RESPONSE: The symbols identified in the attachment EP101 Pump House RFI depict the following:
1. A "diamond with an S in it" depicts a solenoid valve operator with flexible conduit as the final connection. All devices mounted to piping shall include flexible conduit. The conductors and conduit to each solenoid valve operator shall be 6#12&1#12G-3/4"C Type TW and shall be homerun to the Pump Control Panel. These homeruns will be added to the Conduit and Cable Schedule (Controls) as C26, C27 & C28
2. Each resonating horn and vibrating horn location should include a homerun marked C4 (not C5). The C4 homerun conduit and conductors are defined in the Conduit and Cable Schedule (Controls). The horn connections in the PCP are shown in TB-3 OUT on dwg EI401.
13. The circuiting shown on the drawings for the two items does not match the destination or originating location. Could you please clarify? (ProjNet ID 8802663)
GOVERNMENT RESPONSE: Each resonating horn and vibrating horn location should include a homerun marked C4 (not C5). The C4 homerun conduit and conductors are defined in the Conduit and Cable Schedule (Controls). The horn connections in the PCP are shown in TB-3 OUT on dwg EI401.
14. In the Fire Alarm spec section 28 31 64.00 10 Page 3 under Qualifications it mentions a Registered Professional Engineer, are we to carry the costs for an engineer if we do not have one on staff? Is one required since the fire alarm drawings were already designed by an engineer? (ProjNet ID 8802674)
GOVERNMENT RESPONSE: The design fire alarm drawings are conceptual only. A registered professional engineer is required to stamp the fire alarm installation drawings, in accordance with the specs.
15. In the same section it mentions the requirements for NICET certified fire alarm installers and supervisor.
Since our electrical licensing in Rhode Island encompasses the work and our field personal all have their licenses and vast experience with the installation of fire alarm systems will the NICET certifications still be a requirement? (ProjNet ID 8802677)
GOVERNMENT RESPONSE: The NICET certifications described in the spec are required.
16. On EP501 Detail #2 shows that MCC and PCP mounted on 8" Tall by 6" wide curbs to allow access to the seal-off fittings, who will provide the curbs and what material would they be made from? (ProjNet ID 8802685)
GOVERNMENT RESPOSNE: The Contractor shall supply the curbs. Construction of the curbs is shown in Sections 2 & 3 on Structural Dwg S-302. A section of the MCC curbs with the 2" Rigid board insulation is shown in Section C on Architectural Dwg A-202.
17. On EP502 the pump connection details call for the motor starter to be a specific physical size, will a starter with a larger or smaller physical size be acceptable if those specific sizes are not available? (ProjNet ID 8802688)
GOVERNMENT RESPONSE: The details being referenced are standard Military details. Starters and their associated explosion proof enclosures larger than indicated will be considered.
18. Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS paragraph 1.7 LICENSES AND PERMITS states, "Obtain licenses and permits required for the construction of the project and in accordance with FAR 52.236-7 Permits and Responsibilities. Notify the Government of all general use permitted equipment the Contractor plans to use on site. This paragraph supplements the Contractor's responsibility under FAR 52.236-7 Permits and Responsibilities. a. The following permits have been obtained or may be required by the Government: (1) Stormwater Construction Permit and Water Quality Certification; (2) Minor Source Air Permit (for emission sources); (3) Rhode Island (RI) Coastal Resources Management Council Assent; Federal Consistency Determination.
Question:
Please advise specifically what prior noted permits have been obtained or may be required by the Government, and further as to what specific permits are to be obtained by the contractor:
(1) Stormwater Construction Permit and Water Quality Certification
(2) Minor Source Air Permit (for emission sources)
(3) Rhode Island (RI) Coastal Resources Management Council Assent; Federal Consistency Determination.
(ProjNet ID 8802689)
GOVERNMENT RESPONSE: The contractor is not responsible for obtaining the permits listed. However, the contractor is responsible for any other necessary permits in accordance with FAR 52.236-7.
19. Note #2 specifies all above conduit and underground elbows to be PVC Coated GRC. Is that just for this detail or does that apply project wide? (ProjNet ID 8802691)
GOVERNMENT RESPONSE: PVC coated galvanized rigid conduit shall be used underground as specified in Spec Section 337102 - Underground Electrical Distribution. Electrical metallic tubing is not allowed outdoors per Spec Section 262000 - Interior Distribution System. All above grade exterior conduit shall be galvanized rigid conduit. PVC coating of exterior conduit above grade is n t required.
(End of Summary of Changes)