About this file

This document outlines payment items for a fuel storage complex replacement construction project at the Rhode Island Air National Guard Station in North Kingstown, Rhode Island. The project requires replacing the truck offload and fillstand positions and associated pumping and filtration equipment to comply with UFC 3-460-01 Design: Petroleum Fuel Facilities and DoD Type III Hydrant System Standards. Key work items include constructing a new 600 GPM pumphouse with control room, offload skids, fuel pumps, filter/separator vessels, and truck fillstand equipment. Additional work involves upgrades to the existing refueler parking area, reusing existing storage tanks with the new system, and phasing construction to allow continued operation of the existing system during replacement. Payment will be made for line items such as the fuel storage complex replacement, furnishing and delivering prestressed concrete piles, driving piles, load tests, canopy components, contaminated soil handling, asbestos and lead abatement, and warranty extensions. The estimated value is between $5-10 million. The U.S. Army Corps of Engineers New England District will issue the solicitation as a small business set-aside using best value tradeoff procedures.

View the file

Other files

File Type Posted
Amendment 0010.pdf PDF
A-202 BUILDING SECTIONS.pdf PDF
Amendment 0009 - G-009 PHASING PLAN 1.pdf PDF
M-603 FUEL SYSTEM FLOW DIAGRAM (2 OF 2).pdf PDF
M-302 FUELING SYSTEM PIPING ELEVATIONS (2 OF 2).pdf PDF
Amendment 0009 - ES403 ENLARGED SITE PLAN (3 OF 4).pdf PDF
EP101 PUMP HOUSE POWER PLAN.pdf PDF
Amendment 0009 - ES404 ENLARGED SITE PLAN (4 OF 4).pdf PDF
A-002 CODE ANALYSIS.pdf PDF
A-103 REFLECTED CEILING AND ROOF PLANS.pdf PDF
ES101 ELECTRICAL OVERALL SITE PLAN.pdf PDF
Amendment 0009 - EP601 POWER DIAGRAMS AND SCHEDULES.pdf PDF
Amendment 0009.pdf PDF
Amendment 0009 - ES508 STORAGE TANK ELECTRICAL ELEVATION.pdf PDF
EP602 ELECTRICAL SCHEDULES.pdf PDF
Amendment 0009 - 26 24 19.00 40.pdf PDF
EP603 ELECTRICAL SCHEDULES.pdf PDF
Amendment 0009 - Schedule of Special Inspections.pdf PDF
E-001 ELECTRICAL LEGEND AND ABBREVIATIONS.pdf PDF
M-403 TRUCK FILLSTAND PIPING LAYOUT PLAN AND ELEVATION.pdf PDF
Quonset Modified document and comments.pdf PDF
ES507 PRODUCT RECOVERY TANK PLAN AND DETAIL.pdf PDF
EP604 ELECTRICAL SCHEDULES.pdf PDF
A-302 WALL SECTIONS AND DETAILS.pdf PDF
A-101 FLOOR PLAN.pdf PDF
Amendment 0008 - 03 30 00.pdf PDF
Amendment 0008 - G-013 MISCELLANEOUS WORK ITEMS AND NOTES.pdf PDF
Amendment 0008.pdf PDF
Amendment 0008 - 32 13 13.06.pdf PDF
Amendment 0008 - ES401 ENLARGED SITE PLAN (1 OF 4).pdf PDF
Amendment 0008 - 33 52 43.11.pdf PDF
Amendment 0008 - C-407 PUMPHOUSE AND PRT GRADING AND DRAINAGE PLAN - PHASE 1.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006 - Wage Determination.pdf PDF
Amendment 0006 - 1802100MH-101-R1.pdf PDF
Amendment 0006 - 09 90 00 (Q - RTA - Bolded-2).pdf PDF
Amendment 0006 - 10 71 19.16 - Q - RTA - Bolded-2.pdf PDF
Amendment 0006.pdf PDF
Amendment 0006 - 33 56 19 - Q - RTA - Bolded-2.pdf PDF
Amendment 0006 - A-501 (SCHEDULES).pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Solicitation Drawing.zip ZIP file
Supplemental Price Breakdown to the Bidding Schedule.xlsx XLSX spreadsheet
Specs - Volume 1.pdf PDF
Specs - Volume 2.pdf PDF
W912WJ20R0011_Solicitation.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fuel Storage Replacement RTA Submittal Quonset, ANG Rhode Island May 15, 2020

SECTION 01 22 00

MEASUREMENT AND PAYMENT

04/94

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

1.2 JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.3 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.4 BIDDING SCHEDULE - PAYMENT ITEMS

Payment items for the work of this contract on which the contract progress payments will be based are listed in the BIDDING SCHEDULE and are described below. All costs for items of work, which are not specifically mentioned to be included in a particular Bidding Schedule job or unit price payment item, shall be included in the listed item most closely associated with the work involved.

a. Item Number 0001, " Fuel Storage Complex Replacement"

All costs for labor, equipment, and materials for a new POL Storage Complex , as shown on the contract drawings and technical specifications. This item includes all work associated with the new pump house and control room with issue and receipt pumps and filter/separators, two truck fill stand positions, two truck offload positions, and an aboveground product recovery tank. In addition the work will include modifications to the two existing 2,500 BBL aboveground storage tanks and improvements to the refueler parking positions. The project will also provide supporting facilities to include utilities and connections, site lighting, paving, parking, SECTION 01 22 00 Page 1 walks, fire protection, storm drainage/Low Impact Development (LID), information systems, site development, landscaping, fencing and signage. The Base bid also includes over-excavation of the Truck Fillstand/Off Load area as shown on the drawings. The base bid also includes the entire grounding grid associated with the fillstand/offload area. For conduit, junction boxes and wire in the Base Bid, see EL102 for further detail.

All work will be performed in Phases as shown on the Drawings and fueling operations will continue throughout construction with a Temporary Fueling system provided by the Contractor in Phase 2.

Unit of Measure: Job

b. Item Number 0002, "Furnishing and Delivering Prestressed Concrete Piles"

All costs for labor, equipment, and materials for furnishing and delivering prestressed concrete piles. There are a total of 40 piles at 40-feet embedded into soil and 3 foot cut-off as shown on Drawing S-307. Cost per pile shall be based on 40 feet embedded in depth for a total of 1600 LF.

Unit of Measure: Linear Foot

c. Item Number 0003, "Driving Prestressed Concrete Piles"

All costs for labor, equipment, and materials for driving and performing the cut-off prestressed concrete piles. Cost per pile shall be based on 40 foot embeddment in depth for a total of 1600 LF.

Unit of Measure: Linear Foot

d. Item Number 0004, "Prestressed Concrete Pile Compressive Load Tests"

All costs for labor, equipment, and materials for prestressed concrete pile compressive load tests. There are a total of 2 required Pile Compressive Load tests.

Unit of Measure: Each

Option Items

e. Item Number 0005, "Canopy Foundation"

All costs for labor, equipment, and materials for the foundation for the Canopy, all conduits associated with the canopy utilities as shown on the contract drawings and in accordance with the technical specifications. Utility Items for the canopy include the following:

1. Underground (HDPE) storm drain lines from the canopy downspout location to connection point as shown on drawing C-419.

2. For conduit, junction boxes and wire to the Canopy in this option, see EL102 for further detail.

3. For canopy grounding requirements see Drawing EG 103.

Unit of Measure: Job

SECTION 01 22 00 Page 2

f. Item Number 0006, "Canopy Superstructure"

All costs for labor, equipment, and materials for the Canopy Superstructure as shown on the drawings, including lighting and lightning protection. For lightning protection requirements in this option, see EG104. For conduit, junction boxes and wire to the Canopy in this option, see EL102 for further detail.

Unit of Measure: Job

g. Item Number 0007, "Contaminated Soil, Cost of Testing and Stockpiling of Contaminated Soil"

All work associated with stockpiling, handling, testing and proper disposal of petroleum contaminated soil and notification to regulatory agencies for petroleum contaminated soil that cannot be reused onsite for backfill purposes. This option work is separated into four categories for pricing:

First 20 CY suspected soil testing and incidental cost associated with stockpiling.

Over 20 CY suspected soil testing and incidental cost associated with Stockpiling up to 40 CY.

Unit of Measure: CY

h. Item Number 0008, "Contaminated Soil, Cost of transporting and disposal of contaminated soil"

First 20 CY contaminated soil disposal.

Over 20 CY contaminated soil disposal up to 40 CY.

Unit of Measure: CY

i. Item Number 0009, "Asbestos Containing Gasket"

All work gaskets associated with proper removal and disposal of asbestos containing gaskets. See Specification Section 02 82 00 Asbestos Remediation. Each unit price should include the PPE and polyethylene sheeting used during abatement, and could include the adjacent flanges if the asbestos containing materials cannot be removed without becoming friable. This option work is separated into two categories for pricing:

First ten asbestos gaskets

Over ten asbestos gaskets up to 20 asbestos gaskets

Unit of Measure: Each

j. Item Number 0010, "Transite Pipe"

Includes the removal and disposal of one linear foot of 6/8 inch transite water line pipe). See Specification Section 02 82 00 Asbestos Remediation. Each unit price should include the PPE and polyethylene sheeting used during abatement. This option work is

SECTION 01 22 00 Page 3 separated into two categories for pricing:

First ten linear feet transite pipe

Over ten linear feet transite pipe up ro 20 linear feet

Unit of Measure: LF

k. Item Number 0011, "Lead Contaminated Material"

All work associated with the proper removal and disposal of lead contaminated materials. See Specification Section 02 83 00. A unit price per ton will be required. Lead contaminated material, if present, would likely be painted metal piping and appurtenances.

Disposal of lead contaminated materials would include the painted components (piping and appurtenances), and the PPE and polyethylene sheeting used during abatement. This option work is separated into two categories for pricing:

First 3 tons

Over 3 tons up to 10 tons

Unit of Measure: Tons

l. Item Number 0012: "ATG" Related Work

Includes all costs for labor, equipment, and materials for relocating two existing ATG panels from current locations to the new control room. New conduit and control wiring from each tank ATG unit to the new control room, interconnections to relocated panels and final ATG system testing and commissioning.

Unit of Measure: Job

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

SECTION 01 22 00 Page 4

m. Item Number 0013, "Additional Year of Overall Warranty of Construction"

Includes all costs associated with providing an additional year, for a total of two years from the point of completion and acceptance of work, of overall warranty of construction, as described in Specification Section 01 78 00.

Unit of Measure: Job