This document provides the schedule of special inspections for the Quonset Point Fuels Storage Complex Replacement Construction project at the Rhode Island Air National Guard Station in North Kingstown, Rhode Island. The project includes replacing the truck offload and fillstand positions and associated pumping/filtration equipment to comply with UFC 3-460-01 Design: Petroleum Fuel Facilities and DoD Type III Hydrant System Standards. It will also construct a new 600 GPM capacity pumphouse with control room, offload skids, fuel pumps, filter/separator vessels, truck fillstand equipment, associated valves, piping and electrical equipment. The upgrades to the existing refueler parking area and reuse of existing storage tanks are also included. The schedule of special inspections outlines the inspection requirements for structural steel, welding, bolting, concrete, masonry, soils, deep foundations, fire protection systems and smoke control to ensure compliance with the International Building Code.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project:
Location:
Project #:
Date:
B III (Pumphouse) 140 (Pumphouse) Yes
Pipe supports Concrete and steel structures
Statement of Special Inspections Page 1 of 2
Slab diaphragm
Roof diaphragm or plan bracing
Roof diaphragm or plan bracing
Horizontal LFRS Elements Notes
Building roof framing and slab
Steel canopy roof framing and decking
Control room concrete roof slab
Tank foundations
Pre engineered and fully engineered structural systems
Pre engineered and fully engineered structural systems
Masonry walls
Wall and column footings
Ringwall and pedestals under tanks
Lateral Force Resisting System (LFRS) 2018 IBC 1704.3.2 and 1704.3.3
Following is a listing of critical main wind/seismic force resisting systems for this structure. Carefully inspect these elements as part of the roles and responsibilities of the Special Inspector (reference the Schedule of Special Inspections for inspection checklists).
Vertical LFRS Elements Notes Steel building and canopy structural columns and bracing
Steel canopy structural columns and bracing
Building load bearing walls
Canopy and building foundation system
Hazardous Occupancy or attached to such?
STATEMENT OF SPECIAL INSPECTIONS
Special Inspector of Record (SIOR) A Special Inspector of Record (SIOR)
SIOR Name (Registered Professional):
Professional Registration Number:
Consulting Firm Name (if any):
SIOR Office AND Mobile Phone Number:
IS
Group B & H2 Occupancies (2018 IBC, Section 415) required (per UFGS 01 45 35, Section 1.3.5)
Contractor to provide prior to start of construction
Replace Fuel Facilities Quonset Air National Guard Base, Rhode Island
DESC 20S1
08/29/2020
Project Seismic Design Category:
Project Risk Category:
Project Design Wind Speed (mph):
Number of Stories:
Structure Height Above Grade (ft):
II (Other Structures) 130 (Other Structures)
Project:
Location:
Project #:
Date:
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
08/29/2020
DESC 20S1
Quonset Air National Guard Base, Rhode Island Replace Fuel Facilities
Final Walk Down Inspection and Report
(UFC 3 301 01 SECTION 2 2.4.3)
Final Walk Down Inspection of non structural Designated Seismic Systems does not apply to this project (no Designated Seismic Systems)
Final Walk Down Report, Prepared by the Registered Design Professional in Responsible Charge, Must Include:
1. Record observations of Final Walk Down Inspection
2. Document that Inspections were performed in accordance with the Schedule of Special Inspections
3. Document that all Designated Seismic Systems are installed according to construction/manufacturer document requirements, and that Compliance Certificates have been collected (UFC 03 301 01, 2 13.2.2.1).
Statement of Special Inspections Page 2 of 2
Designated Seismic Systems (DSS) (2018 IBC 1705.12 (ASCE 7 16, 13.2.2, C13.2.2) (UFC 3-301-01, 2 -4.1, 2-5.3 & 2-5.4) DESIGNATED SEISMIC SYSTEMS DO NOT APPLY TO THIS PROJECT, due to
1. The Seismic Design Category being less than C.
2. S.DS (Spectral Response Acceleration at short periods) is less than 0.5 and the building height is less than 25 ft.
ELECTRICAL Designated Seismic Systems (DSS) Requiring a Certificate of Compliance
If additional space is required, append an additional sheet listing the remaining DSS
If additional space is required, append an additional sheet listing the remaining DSS
MECHANICAL/PLUMBING Designated Seismic Systems (DSS) Requiring a Certificate of Compliance
OTHER Designated Seismic Systems (DSS) Requiring a Certificate of Compliance
SCHEDULE OF SPECIAL INSPECTIONS (UFGS 01 45 35) REVISED FOR IBC 2018 ON 01/01/20
SCHEDULE OF SPECIAL INSPECTIONS
Reference UFGS 01 45 35 for all requirements not noted as part of this schedule.
INSPECTION DEFINITIONS:
PERFORM: Perform these tasks for each weld, fastener or bolted connection, and noted verification.
OBSERVE: Observe these items randomly during the course of each work day to insure that applicable requirements are being met. Operations need not be delayed pending these inspections at risk.
DOCUMENT: Document, with a report, that the work has been performed in accordance with the contract documents. This is in addition to any other reports required in the Special Inspections guide specification.
CONTINUOUS: Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.
SCHEDULE OF SPECIAL INSPECTIONS (UFGS 01 45 35) REVISED FOR IBC 2018 ON 01/01/2020
A. STRUCTURAL STEEL WELDING SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
STEEL INSPECTION PRIOR TO WELDING VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360 16: Table C N5.4 1
TASK INSPECTION TYPE1 DESCRIPTION
1. Verify that the welding procedures specification (WPS) is available
PERFORM
2. Verify manufacturer certifications for welding consumables are available
PERFORM
3. Verify material identification PERFORM Type and grade.
4. Welder Identification
System PERFORM The fabricator or erector, as applicable, shall maintain a system by which a welder who has welded a joint or member can be identified. Stamps, if used, shall be the low stress type.
5. Fit up of groove welds (including joint geometry)
OBSERVE Joint preparation Dimensions (alignment, root opening, root face, bevel) Cleanliness (condition of steel surfaces) Tacking (tack weld quality and location) Backing type and fit (if applicable)
6. Configuration and finish of access holes
OBSERVE
7. Fit up of fillet welds OBSERVE Dimensions (alignment, gaps at root) Cleanliness (condition of steel surfaces) Tacking (tack weld quality and location)
STEEL INSPECTION DURING WELDING VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360 16: Table C N5.4 2
TASK INSPECTION TYPE DESCRIPTION
8. Use of qualified welders PERFORM Welding by welders, welding operators, and tack welders who are qualified in conformance with requirements.
9. Control and handling of welding consumables OBSERVE Packaging
Electrode atmospheric exposure control
10. No welding over cracked tack welds
OBSERVE
11. Environmental conditions OBSERVE Wind speed within limits Precipitation and temperature
12. Welding Procedures Specification followed
OBSERVE Settings on welding equipment Travel speed Selected welding materials Shielding gas type/flow rate Preheat applied Interpass temperature maintained (min./max.)
Proper position (F, V, H, OH) Intermix of filler metals avoided
13. Welding techniques OBSERVE Interpass and final cleaning Each pass within profile limitations Each pass meets quality requirements
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need not be delayed pending these inspections at risk.
A. STRUCTURAL STEEL WELDING SECTION (CONTINUED)
STEEL INSPECTION AFTER WELDING VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 2015 1705.2.1, AISC 360 16: Table C N5.4 3
TASK INSPECTION TYPE 1 DESCRIPTION
14. Welds cleaned OBSERVE
15. Size, length, and location of all welds PERFORM Size, length, and location of all welds conform to the requirements of the detail drawings.
16. Welds meet visual acceptance criteria
PERFORM AND
DOCUMENT
Crack prohibition Weld/base metal fusion Crater cross section Weld profiles Weld size Undercut Porosity
17. Arc strikes PERFORM
18. k area PERFORM When welding of doubler plates, continuity plates or stiffeners has been performed in the k area, visually inspect the web k area for cracks.
19. Backing removed, weld tabs removed and finished, and fillet welds added where required
PERFORM
20. Repair activities PERFORM AND
DOCUMENT
21. Document acceptance or rejection of welded joint or member
PERFORM
END SECTION
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.
B. STRUCTURAL STEEL BOLTING SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
VERIFY THE FOLLOWING ARE IN COMPLIANCESTEEL INSPECTION TASKS PRIOR TO BOLTING
IBC 1705.2.1, AISC 360 16: Table C N5.6 1
TASK INSPECTION TYPE 1 DESCRIPTION
1. certifications available for fastener materials
PERFORM
2. Fasteners marked in accordance with ASTM requirements
OBSERVE
3. Proper fasteners selected for joint detail (grade, type, bolt length if threads are to be excluded from shear plane)
OBSERVE
4. Proper bolting procedure selected for joint detail
OBSERVE
5. Connecting elements, including appropriate faying surface condition and hole preparation, if specified, meet applicable requirements
OBSERVE
6. Proper storage provided for bolts, nuts, washers, and other fastener components
OBSERVE
STEEL INSPECTION TASKS DURING BOLTING VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360 16: Table C N5.6 2
TASK INSPECTION TYPE 1 DESCRIPTION
7. Fastener assemblies of suitable condition, placed in all holes and washers (if required) are positioned as required
OBSERVE
8. Joint brought to the snug tight condition prior to pretensioning operation
OBSERVE
9. Fastener component not turned by the wrench prevented from rotating
OBSERVE
10. Bolts are pretensioned in accordance with RCSC Specification, progressing systematically from the most rigid point toward the free edges
OBSERVE
STEEL INSPECTION TASKS AFTER BOLTING VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360 16: Table C N5.6 3
TASK INSPECTION TYPE 1 DESCRIPTION
11. Document acceptance or rejection of all bolted connections
DOCUMENT
END SECTION
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need
DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.
C. STRUCTURAL STEEL NON DESTRUCTIVE TESTING SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
NONDESTRUCTIVE TESTING OF WELDED JOINTS VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360 16: Section N5.5
TASK INSPECTION TYPE 1 DESCRIPTION
1. Use of qualified nondestructive testing personnel
PERFORM Visual weld inspection and nondestructive testing (NDT) shall be conducted by personnel qualified in accordance with AWS D1.8 clause 7.2
2. CJP groove welds OBSERVE [NOTE: DOR must delete this row if section D (SEISMIC PROVISIONS SECTION) is checked] Dye penetrant testing (DT) and ultrasonic testing (UT) shall be performed on 20% of CJP groove welds for materials greater than (8mm) thick. Testing rate must be increased to 100% if greater than 5% of welds tested have unacceptable defects.
3. Welded joints subject to fatigue
OBSERVE Dye penetrant testing (DT) and Ultrasonic testing (UT) shall be performed on 100% of welded joints identified on contract drawings as being subject to fatigue.
4. Weld tab removal sites OBSERVE At the end of welds where weld tabs have been removed, magnetic particle testing shall be performed on the same beam to column joints receiving UT
END SECTION
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need
D. STRUCTURAL STEEL OTHER INSPECTIONS
THIS SECTION APPLICABLE IF BOX IS CHECKED:
OTHER STEEL INSPECTIONS VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 341 16: Tables J8 1 & J10 1
TASK INSPECTION TYPE 1 DESCRIPTION
1. Anchor rods and other embedments supporting structural steel
PERFORM Verify the diameter, grade, type, and length of the anchor rod or embedded item, and the extent or depth of embedment prior to placement of concrete.
2. Fabricated steel or erected steel frame
OBSERVE Verify compliance with the details shown on the construction documents, such as braces, stiffeners, member locations and proper application of joint details at each connection.
3. Reduced beam sections (RBS) where/if occurs
DOCUMENT Contour and finish Dimensional tolerances
4. Protected zones DOCUMENT No holes or unapproved attachments made by fabricator or erector
5. H piles where/if occurs DOCUMENT No holes or unapproved attachments made by the responsible contractor
END SECTION
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need
DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.
E. STRUCTURAL COLD FORMEDMETAL DECK PLACEMENT SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
METAL DECK INSPECTION PRIOR TO DECK PLACEMENT VERIFY THE FOLLOWING ARE IN COMPLIANCE SDI QA/QC 2017, Appendix 1, Table 1.1
TASK INSPECTION TYPE 1 DESCRIPTION
1. Verify compliance of materials
(deck and all deck accessories) with construction documents, including profiles, material properties, and base metal thickness
PERFORM
2. Document acceptance or rejection of deck and deck accessories
DOCUMENT
METAL DECK INSPECTION DURING DECK PLACEMENT VERIFY THE FOLLOWING ARE IN COMPLIANCE SDI QA/QC 2011, Appendix 1, Table 1.2
TASK INSPECTION TYPE 1 DESCRIPTION
3. Verify compliance of deck and all deck accessories installation with construction documents
PERFORM
4. Verify deck materials are represented by the mill certifications that comply with the construction documents
PERFORM
5. Document acceptance or rejection of installation of deck and deck accessories
DOCUMENT
METAL DECK INSPECTION AFTER DECK PLACEMENT VERIFY THE FOLLOWING ARE IN COMPLIANCE SDI QA/QC 2017, Appendix 1, Table 1.3
TASK INSPECTION TYPE 1 DESCRIPTION
6. Welding procedure specification
(WPS) available
PERFORM
7. Manufactures certifications for welding consumables available
OBSERVE
8. Material identification (type/grade)
OBSERVE
9. Check welding equipment OBSERVE
END SECTION
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need
DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.
F. STRUCTURAL COLD FORMEDMETAL DECK WELDING SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
METAL DECK INSPECTION DURING WELDING VERIFY THE FOLLOWING ARE IN COMPLIANCE
SDI QA/QC 2017, Appendix 1, Table 1.4
TASK INSPECTION TYPE 1 DESCRIPTION
1. Use of qualified welders OBSERVE
2. Control and handling of welding consumables
OBSERVE
3. Environmental conditions (wind speed, moisture, temperature)
OBSERVE
4. WPS followed OBSERVE
METAL DECK INSPECTION AFTER WELDING VERIFY THE FOLLOWING ARE IN COMPLIANCE
SDI QA/QC 2017, Appendix 1, Table 1.5
TASK INSPECTION TYPE 1 DESCRIPTION
5. Verify size and location of welds, including support, sidelap, and perimeter welds.
PERFORM
6. Welds meet visual acceptance criteria
PERFORM
7. Verify repair activities PERFORM
8. Document acceptance or rejection of welds
DOCUMENT
END SECTION
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need
DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.
G. STRUCTURAL COLD FORMEDMETAL DECK FASTENING SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
METAL DECK INSPECTION BEFORE MECHANICAL FASTENING VERIFY THE FOLLOWING ARE IN COMPLIANCE SDI QA/QC 2017, Appendix 1, Table 1.6
TASK INSPECTION TYPE 1 DESCRIPTION
1. Manufacturer installation instructions available for mechanical fasteners
OBSERVE
2. Proper tools available for fastener installation
OBSERVE
METAL DECK INSPECTION DURING MECHANICAL FASTENING VERIFY THE FOLLOWING ARE IN COMPLIANCE SDI QA/QC 2017, Appendix 1, Table 1.7
TASK INSPECTION TYPE 1 DESCRIPTION
3. Fasteners are positioned as required
OBSERVE
4. Fasteners are installed in accordance with manufacturer's instructions
OBSERVE
METAL DECK INSPECTION AFTER MECHANICAL FASTENING VERIFY THE FOLLOWING ARE IN COMPLIANCE SDI QA/QC 2017, Appendix 1, Table 1.8
TASK INSPECTION TYPE 1 DESCRIPTION
5. Check spacing, type, and installation of support fasteners
PERFORM
6. Check spacing, type, and installation of sidelap fasteners
PERFORM
7. Check spacing, type, and installation of perimeter fasteners
PERFORM
8. Verify repair activities PERFORM
9. Document acceptance or rejection of mechanical fasteners
DOCUMENT
END SECTION
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need
DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.
H. STRUCTURAL LIGHT GAUGE STEEL FRAMING AND/OR LIGHT GAUGE TRUSSES SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
LIGHT GAUGE STEEL CONSTRUCTION AND CONNECTIONS VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.2, 1705.11.2, 1705.11.3, UFC 4 023 03
TASK INSPECTION TYPE1 DESCRIPTION
1. Trusses spanning 60 feet or greater where/if applies
PERFORM Verify that temporary and permanent truss restraint/bracing is installed in accordance with approved truss submittal package.
2. Welded connections (seismic and/or wind resisting system)
OBSERVE Visually inspect all welds composing part of the main wind or seismic force resisting system, including shearwalls, braces, collectors (drag struts), and hold downs.
3. Connections (seismic and/or wind resisting system)
OBSERVE Visually inspect all screw attachment, bolting, anchoring and other fastening of components within the main wind or seismic force resisting system, including roof deck, roof framing, exterior wall covering, wall to roof/floor connections, braces, collectors (drag struts) and hold downs.
4. Cold formed steel (progressive collapse resisting system where/if applies)
OBSERVE Verify proper welding operations, screw attachment, bolting, anchoring and other fastening of components within the progressive collapse resisting system, including horizontal tie force elements, vertical tie force elements and bridging elements (UFC 4 023 03).
END SECTION
I. STRUCTURAL OPEN WEB STEEL JOISTS SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
OPEN WEB STEEL JOISTS AND JOIST GIRDERS VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC TABLE 1705.2.3
TASK INSPECTION TYPE 1 DESCRIPTION
1. Installation of open web steel joists and joist girders
OBSERVE End connections welded or bolted Bridging horizontal and diagonal
END SECTION
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need
J. STRUCTURAL CONCRETE CONSTRUCTION SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
CONCRETE CONSTRUCTION, INCLUDING COMPOSITE DECK VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC TABLE 1705.3 (ACI 318 REFERENCES NOTED IN IBC TABLE)
TASK INSPECTION TYPE 1 DESCRIPTION
1. Inspect reinforcement, including prestressing tendons, and verify placement.
OBSERVE Verify prior to placing concrete that reinforcing is of specified type, grade and size; that it is free of oil, dirt and unacceptable rust; that it is located and spaced properly; that hooks, bends, ties, stirrups and supplemental reinforcement are placed correctly; that lap lengths, stagger and offsets are provided; and that all mechanical connections are installed per the instructions and/or evaluation report.
2. Reinforcing bar welding OBSERVE Verify weldability of reinforcing bars other than
ASTM A 706
Inspect single pass fillet welds, maximum in accordance with AWS D1.4
3. All other welding CONTINUOUS Visually inspect all welds in accordance with AWS D1.4
4. Cast in place anchors and post installed drilled anchors (downward inclined)
OBSERVE Verify prior to placing concrete that cast in place anchors and post installed drilled anchors have proper embedment, spacing and edge distance.
5. Post installed adhesive anchors in horizontal or upward inclined orientations
CONTINUOUS AND
DOCUMENT
Inspect as required per approved ICC ES report Verify that installer is certified for installation of horizontal and overhead installation applications
Inspect proof loading as required by the contract documents
6. Verify use of required mix design OBSERVE Verify that all mixes used comply with the approved construction documents
7. Prior to concrete placement, fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete
CONTINUOUS At the time fresh concrete is sampled to fabricate specimens for strength test verify these tests are performed by qualified technicians.
8. Inspect concrete and/or shotcrete placement for proper application techniques
CONTINUOUS Verify proper application techniques are used during concrete conveyance and depositing avoids segregation or contamination. Verify that concrete is properly consolidated.
9. Verify maintenance of specified curing temperature and technique
OBSERVE Inspect curing, cold weather protection, and hot weather protection procedures.
10. Pre stressed concrete CONTINUOUS Verify application of prestressing forces and grouting of bonded prestressing tendons.
CONTINUED ON FOLLOWING PAGE
1 OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need not be delayed pending these inspections at risk.
DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.
CONTINUOUS: Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.
K. STRUCTURAL CONCRETE CONSTRUCTION (CONTINUED)
CONCRETE CONSTRUCTION, INCLUDING COMPOSITE DECK VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC TABLE 1705.3 (ACI 318 REFERENCES NOTED IN IBC TABLE)
TASK INSPECTION TYPE 1 DESCRIPTION
11. Inspect erection of precast concrete members
OBSERVE
12. Verify in situ concrete strength, prior to stressing of tendons in post tensioned concrete and prior to removal of shores and forms from beams and structural slabs.
OBSERVE
13. Inspect formwork for shape, location and dimensions of the concrete member being formed.
OBSERVE
END SECTION
1 OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need not be delayed pending these inspections at risk.
DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.
CONTINUOUS: Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.
K. STRUCTURAL MASONRY CONSTRUCTION SECTION (ALL RISK CATEGORIES)
THIS SECTION APPLICABLE IF BOX IS CHECKED:
MASONRY CONSTRUCTION VERIFY THE FOLLOWING ARE IN COMPLIANCE AT START OF CONSTRUCTION
IBC 1705.4 (TMS 402/602-16 TABLE 3.1.2 & 3.1.3)
TASK INSPECTION TYPE 1 DESCRIPTION
1. Compliance with approved submittals prior to start OBSERVE
2. Proportions of site mixed mortar. OBSERVE
3. Grade and type of reinforcement, anchor bolts, and prestressing tendons and anchorages
OBSERVE
4. Prestressing technique OBSERVE
5. Properties of thin bed mortar for AAC masonry OBSERVE
MASONRY CONSTRUCTION VERIFY THE FOLLOWING ARE IN COMPLIANCE PRIOR TO GROUTING
IBC 1705.4 (TMS 402/602-16 TABLE 3.1.2 & 3.1.3)
TASK INSPECTION TYPE 1 DESCRIPTION
6. Grout space OBSERVE
7. Proportions of site prepared grout and prestressing grout for bonded tendons
OBSERVE
8. Proportions of site mixed grout and prestressing grout for bonded tendons
OBSERVE
9. Placement of masonry units and mortar joints OBSERVE
10. Welding of reinforcement CONTINUOUS
MASONRY CONSTRUCTION VERIFY THE FOLLOWING ARE IN COMPLIANCE DURING CONSTRUCTION
IBC 1705.4 (TMS 402/602-16 TABLE 3.1.2 & 3.1.3)
TASK INSPECTION TYPE 1 DESCRIPTION
11. Size and location of structural elements is in compliance
OBSERVE
12. Preparation, construction, and protection of masonry during cold weather (temperature below 40oF (4.4oc) or hot weather (temp above 90oF (32.2oC))
OBSERVE
13. Application and measurement of prestressing force CONTINUOUS
14. Placement of grout and prestressing grout for bonded tendons
CONTINUOUS
15. Placement of AAC masonry units and construction of thin bed mortar joints
CONTINUOUS Continuous for first 5000 square feet only (465 square meters).
16. Observe preparation of grout specimens, mortar specimens, and/or prisms
OBSERVE
17. Type, size and placement of reinforcement, connectors, anchor bolts and prestressing tendons and anchorages, including details of anchorage of masonry to structural members, frames, or other construction
OBSERVE
END SECTION
1 OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need
CONTINUOUS: Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.
L. GEOTECHNICAL SOILS INSPECTION SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
SOILS INSPECTION VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.6
TASK INSPECTION TYPE 1 DESCRIPTION
1. Materials below shallow foundations are adequate to achieve the design bearing capacity.
OBSERVE
2. Excavations are extended to proper depth and have reached proper material
OBSERVE
3. Verify use of proper materials, densities and lift thicknesses during placement and compaction of compacted fill
CONTINUOUS
4. Prior to placement of compacted fill, inspect subgrade and verify that site has been prepared properly.
OBSERVE During fill placement, the special inspector shall verify that proper materials and procedures are used in accordance with the provisions of the approved geotechnical report
END SECTION
M. GEOTECHNICAL CAST IN PLACE DEEP FOUNDATION ELEMENTS SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
CAST IN PLACE DEEP FOUNDATION ELEMENTS VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.8
TASK INSPECTION TYPE 2 DESCRIPTION
1. Inspect drilling operations and maintain complete and accurate records for each element.
CONTINUOUS
2. Verify placement locations and plumbness, confirm element diameters, bell diameters (if applicable), lengths, embedment into bedrock (if applicable and adequate end bearing strata capacity. Record concrete or grout volumes
CONTINUOUS
END SECTION
1 OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need not be delayed pending these inspections at risk.
CONTINUOUS: Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.
2 CONTINUOUS: Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.
N. FIRE PROTECTION FIRE RESISTANT PENETRATIONS AND JOINTS SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
FIRE RESISTANT PENETRATIONS AND JOINTS VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.17
TASK INSPECTION TYPE 1 DESCRIPTION
1. Inspections of penetration firestop systems conducted in accordance with ASTM E 2174.
OBSERVE
2. Inspections of fire resistant joint systems conducted in accordance with ASTM E 2393
OBSERVE
END SECTION
O. FIRE PROTECTION SMOKE CONTROL SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED:
SMOKE CONTROL VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.17
TASK INSPECTION TYPE 1 DESCRIPTION
1. Verify device locations and perform leakage testing OBSERVE Perform during erection of ductwork and prior to concealment
2. Pressure difference testing, flow measurements and detection and control verification
OBSERVE Perform prior to occupancy and after sufficient completion
END SECTION
1 OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need