This document provides details for a federal construction solicitation for replacement of the fuels storage complex at the Quonset Point Rhode Island Air National Guard Station. The solicitation will be issued by the U.S. Army Corps of Engineers New England District to replace the truck offload and fillstand positions, associated pumping and filtration equipment, and construct a new 600 gallon per minute pumphouse with control room, offload skids, fuel pumps, filter/separator vessels, and truck fillstand equipment. The work will also include upgrades to the existing refueler parking area and reuse of existing storage tanks with the new system. Construction will be phased to allow continued operation of the existing system until most of the new system is completed. The work is estimated to cost between $5-10 million and will be set aside for small businesses using best value tradeoff procedures. The NAICS code is 236220.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HIGH FLOW
FLOW
E STOP
LOW FLOW
R
NO FLOW
R
S T
A R
T
S T
O P
G
RUNNING
G
ON
OFF
PROVER
GROUND
2" GLOBE VALVE
M-503
VERTICAL AIR ELIMINATOR
FLOW CONTROL VESSEL
2" AIR BLOCK/ CHECK
CONTROL VALVE
1" BALL VALVE
1" DRAIN
2" METER PROVING
CONNECTIONS
Scale:
A
TRUCK OFFLOAD PIPING ELEVATION
1/2" = 1'-0"
MANUAL AIR VENT
M-501
4" SS PIPING
SS CS
0-150
PSIG
300 GPM POSITIVE
DISPLACEMENT METER
300 GPM OFFLOAD PUMP
" FLANGED FLOW SWITCH
2" PRESSURE/ VACUUM VENT
ELECTRICAL CONTROL PANEL
A
B O
V E
P
A D
2" VENT PIPING
30" WG VAC. TO 60 PSIG
6" STRAINER W/ DRAIN
OVERFILL PROTECTION
VALVE
3" x 2" REDUCER
4" ALUMINUM CAM TYPE
QUICK DISCONNECT WITH
PLUG AND RING
4" FUEL HOSE,
10'-0" LONG (TYP-5)
HOSE HANGING RACK
4" AIR BLOCK/ CHECK
CONTROL VALVE (AB/CV)
PIPING SHOWN
HERE FOR CLARITY
MAV
SEE NOTE 2
CANOPY COLUMN
M I N
4" SIGHT FLOW INDICATOR
(INSTALL ROTATED 45°)
4" FULL PORT
BALL VALVE
PIPE SUPPORT BY SKID
MANUFACTURER
Scale:
B
SECTION
1/2" = 1'-0"
FS
Scale:
C
TRUCK FILLSTAND PIPING ELEVATION
1/2" = 1'-0"
MANUAL AIR VENT
M-501
4" SS PIPING
4" BASKET STRAINER
W/ DRAIN
FLOW SWITCH
M-501
" CHECK VALVE AND PIPING
FOR THERMAL RELIEF
4" TRUCK LOADING
CONTROL VALVE
4" POSITIVE
DISPLACEMENT METER
TYPICAL PIPE
SUPPORT
M-502
PRESSURE
GAUGE (TYP)
M-501
4" SS
6" LOOP PIPING IN
TRENCH
SEE NOTE 2
SEE NOTE 1
CANOPY COLUMN
M I N
6" PIPING IN TRENCH
6" x 4" TEE
4" SS PIPING
SEE NOTE 1
SAMPLE
CONNECTION
M-501
D-2 NOZZLE AND
DRYBREAK DISCONNECT
3" SS
3"
LPD
Scale:
D
TRUCK FILLSTAND PANTOGRAPH ELEVATION
1/2" = 1'-0"
3"
PANTOGRAPH SUPPORT
PROVIDED BY
MANUFACTURER
F I L
N
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D
2 3
C
4 5
A
B
D A
T E
F I L
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
S M
B L
D E
S C
R I P
T I O
N
C O
N T
R A
C T
O
SHEET
IDENTIFICATION
D A
T E
A P
P R
US Army Corps of Engineers
U S
A
R M
Y
C
O R
S
F
E
N G
I N
E E
R S
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
--S E
P T
E M
B E
R
A N
S I
D
OMAHA DISTRICT
S E
A L
D E
S C
S
R
E P
L A
C
U E
L
F
A C
I L
I T
I E
S
Q U
O N
S E
T
A
I R
T
I O
N A
L
G
U A
R D
B
S
E
N O
R T
H
K
I N
G S
T O
W N
R
H O
D
I
L A
N D
R
READY TO ADVERTISE (RTA)
M-302
F U
E L
I N
G
S
Y S
T E
M
P
I P
I N
G
E L
E V
A T
I O
M
S
O U
P R
A Y
E N
M
S
O U
P R
A Y
E N M
F
U R
R
C
L A
Y S
O N
M
D
W G
GRAPHIC SCALE
SCALE: 1/2" = 1'-0"
2 0 2 4
NOTES:
1. SEE SHEET 7/ C-503 FOR TRENCH DETAIL AND SHEET S-505 FOR
PIPE SUPPORT IN TRENCH.
2. SEE SHEET C-412 FOR EXTERIOR PIPE SUPPORT SCHEDULE.