ES507 PRODUCT RECOVERY TANK PLAN AND DETAIL.pdf
PDF 781 KB Posted
- Solicitation number
- W912WJ20R0011
About this file
This document contains details for an upcoming federal construction contract opportunity and the associated technical specifications. The U.S. Army Corps of Engineers New England District will issue a solicitation to replace the fuel storage complex at the Quonset Point Rhode Island Air National Guard Station for an estimated amount between $5 million to $10 million. The project scope involves replacing the truck offload and fillstand positions, associated pumping and filtration equipment, construction of a new 600 GPM capacity pumphouse and control room, upgrades to the refueler parking area, and reusing existing storage tanks. The work will be solicited as a small business set-aside using best value tradeoff procedures. The NAICS code for the work is 236220. Construction will be phased to allow the existing system to operate until most of the new system is completed. Technical specifications provide plans and details for the new product recovery tank, electrical systems, and related infrastructure.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F I L E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D
2 3
C
4 5
A
B
D A
T E
F I L
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
S M
B L
D E
S C
R I P
T I O
N
C O
N T
R A
C T
O
SHEET
IDENTIFICATION
D A
T E
A P
P R
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
O
E
N G
I N
E E
R S
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
--S E
P T
E M
B E
R
A N
S I
D
OMAHA DISTRICT
S E
A L
D E
S C
S
R
E P
L A
C
U E
L
F
A C
I L
I T
I E
S
Q U
O N
S E
T
A
R
T
I O
N A
L
G
U A
R D
B
S
E
N O
R T
H
K
I N
G S
T O
W N
R
H O
D
L A
N D
R
READY TO ADVERTISE (RTA)
PROFESSIONAL
G E O R G I A
D O
UG L A S P . E NG
E
L
ENG I NE ER
REG ISTERED
No. 41840
ES507
P R
O D
U C
T
R
E C
O V
E R
Y
T
A N
K
P
L A
N
A N
D
D
E T
A I L
D
E
N G
E L
E
J A
C K
S O
N M
F
U R
R
C
L A
Y S
O N
E
S D
W G
NOTES:
1. THE AREA AROUND THE PRODUCT RECOVERY TANK, PUMPS, ABOVE GROUND
PIPING, VENTS, AND CONTAINMENT CURB, SHALL BE CONSIDERED A CLASS 1
DIVISION 1, OR CLASS 1 DIVISION 2 HAZARDOUS LOCATION PER THE
REQUIREMENTS OF NEC ARTICLE 500 AND APPLICABLE UFC CRITERIA.
2. ALL HOMERUNS GO TO THE RESPECTIVE PANEL OR EQUIPMENT NOTED IN THE
PUMP SHELTER CONTROL ROOM.
3. FOR CONDUIT AND CONDUCTOR SCHEDULE, SEE SHEET EP603
PP2-16, 2#12, 1#12G
ATG-1
FTP-1
LD
WP-1
J
OV-1
30/3/(4X/8)
LADDER
DIA.
PULLBOX
NEMA 4X
POWER
PULL BOX
NEMA 4X
POWER
GENERAL NOTES:
1. PROVIDE A STEEL SUPPORT CONSTRUCTED OF TUBULAR STEEL (TS)
MINIMUM 2
" DIA x
" THICK USE WELDED CONSTRUCTION.
2. ALL CONDUITS ABOVE GRADE AND ALL ELBOWS BELOW GRADE SHALL
BE PVC COATED GALVANIZED RIGID STEEL.
3. LOCATE RACK A MINIMUM OF 10' FROM EDGE OF CONCRETE CURB,
PIPING, TANK, OR OTHER EQUIPMENT.
4. SEE STRUCTURAL PLANS AND SPECS FOR REQUIREMENTS OF
COMPRESSIVE STRENGTH OF CONCRETE FOUNDATION.
1'-4"
M
I N
HYDRANT FUELS
EMERGENCY
SHUTDOWN
PULL BOX
NEMA 4X
CONTROLS
G G G G G G G G G G G G G G G G
G G
G G
G G
G G
G G
G G
GGGGGGGGGGGGGGGG
G G
G G
G G
G G
G G
G G
TO PCP (LEAK DETECTION), 4/C #14
TO PP2-14 (WP-1), 2#10, 1#10G
TO MCC (FTP-1), R8 PLUS 2#12 FOR
HEATER AND 4/C #14 FOR CONTROLS
TO PCP (OVERFILL VALVE), 10#12, 1#12G
TO PCP (FLOAT SWITCHES), 10#12, 1#12G
TO ATG (CONTROLS), 4/C #14
TO ATG (POWER), 2#12,1#12G
TO EFSO PANEL, 4#14
ATG
POWER
ATG
CONTROL
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
C54
R40
C57
C58
R37
R39
C56
TYPICAL
FOUNDATION
SM/EP
PRODUCT RECOVERY TANK ELECTRICAL PLAN VIEW
SCALE: NTS
PRODUCT RECOVERY TANK CONTROL RACK ELEVATION
SCALE: NTS
CAP PLATE (TYP)
CONDUIT SEALS
AS REQUIRED
#2/0 BARE GROUND
WELDED TO RACK
#4/0 BARE GROUND TO
TANK GROUND RING
3/4"X10' COPPER CLAD
GROUND ROD
EPDS PUSHBUTTON AND
MARKING SIGN PER 8/ES501,
FRONT AND BACK
NEMA 4X JUNCTION
BOXES FOR ATG
PROVIDE A MINIMUM OF TWO
GROUND CONNECTIONS TO
TANK AND PLATFORM
LEAK
DETECTOR
WATER REMOVAL PUMP (WP-1) PROVIDE EXPLOSION
PROOF MOTOR RATED SWITCH WITH THE CAPABILITY
OF BEING LOCKED IN THE OFF POSITION, SEE 2/EP502
FOR ADDITIONAL INFORMATION ON SWITCH AND BOX.
EFSO
JUNCTION BOXES
CONTROL RACK PER 2/ES507,
LOCATE A MINIMUM OF 10' FROM
EDGE OF CONTAINMENT CURB,
SEE ES401 FOR LOCATION
TYPICAL CONDUIT SEAL
#4/0 BARE TINNED
COPPER GROUND TYP
GROUND CONNECTION TO
LADDER
OVERFILL VALVE LIMIT SWITCH
TANK PLATFORM
ATG/LEVEL INDICATORFLOAT SWITCHES
FUEL TRANSFER
PUMP (FTP-1)
TYPICAL BONDING CONDUCTOR
IS #2/0 BARE TINNED COPPER
FS
TYPICAL GROUND
CONNECTION TO ABOVE
GROUND PIPING, TYPICAL
OF 4 LOCATIONS
CONTINUE TO SITE
GROUND LOOP,
SEE DWG EG103
CONTINUE TO SITE
GROUND LOOP,
SEE DWG EG103
A
M E
N D
M E
T
D
P E
P
| Sheets and Views |
| ES507 PRODUCT RECOVERY TANK PLAN AND DETAIL |
File details come from the government source that posted it. Updated .