Amendment 0006 - A-501 (SCHEDULES).pdf
PDF 152 KB Posted
- Solicitation number
- W912WJ20R0011
About this file
This document provides schedules and details for the construction of a new fuels storage complex at the Quonset Point Rhode Island Air National Guard Station. The construction work includes replacing truck offload and fillstand positions and associated pumping, filtration, and control room equipment. A new 600 gallon per minute pumphouse will be constructed along with offload skids, fuel pumps, filter/separator vessels, truck fillstand equipment, valves, piping, and electrical components. Existing storage tanks will be reused. The work will be conducted in phases to allow continued operation of the existing system. The solicitation for the project, issued by the U.S. Army Corps of Engineers New England District, is number W912WJ20R0011. The work is estimated to cost between $5-10 million and will be set aside for small businesses using best value tradeoff procedures. The NAICS code for the project is 236220.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F I L E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D
2 3
C
4 5
A
B
D A
T E
F I L
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
S M
B L
D E
S C
R I P
T I O
N
C O
N T
R A
C T
O
SHEET
IDENTIFICATION
D A
T E
A P
P R
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
O
E
N G
I N
E E
R S
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
--S E
P T
E M
B E
R
A N
S I
D
OMAHA DISTRICT
S E
A L
D E
S C
S
R
E P
L A
C
U E
L
F
A C
I L
I T
I E
S
Q U
O N
S E
T
A
R
T
I O
N A
L
G
U A
R D
B
S
E
N O
R T
H
K
I N
G S
T O
W N
R
H O
D
S
L A
N D
R
READY TO ADVERTISE (RTA)
DOOR SCHEDULE
OPENING
DOOR DATA FRAME DATA DETAIL MISCELLANEOUS
REMARKS
TYPE WIDTH HEIGHT MATERIAL GLASS PAINT TYPE MATERIAL FINISH HEAD JAMB SILL FIRE LABEL HDW SET
101A SL PR 3'-0" 7'-0" HM GL-1 PT 2 HM PT G/A-503 H/A-503 J/A-503 - HW-1
101B SL 3'-0" 7'-0" HM GL-1 PT 1 HM PT G/A-503 H/A-503 J/A-503 HW-2
101C SL 3'-0" 7'-0" HM GL-1 PT 1 HM PT G/A-503 H/A-503 J/A-503 - HW-2
102A SL PR 2'-6" 7'-0" HM GL-1 PT 4 HM PT A/A-503 B/A-503 C/A-503 - HW-1
102B SL 3'-0" 7'-0" HM GL-1 PT 3 HM PT A/A-503 B/A-503 C/A-503 HW-2
103 F 3'-0" 7'-0" HM PT 3 HM PT D/A-503 E/A-503 F/A-503 HW-2
DOOR TYPE DESIGNATION: ABBREVIATIONS:
FINISH SCHEDULE
SPACE NAME
FLOOR BASE NORTH WALL SOUTH WALL EAST WALL WEST WALL CEILING
REMARKS
MATERIAL FINISH MATERIAL MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH HEIGHT
101 PUMP ROOM CONC SC CMU PT CMU PT CMU PT CMU PT EXP VARIES NOTE 1
102 CONTROL ROOM CONC VCT RB GYP BD PT GYP BD PT GYP BD PT GYP BD PT ACT MMF 9'-0"
NOTE 2, 3
103 RISER ROOM CONC SC CMU CMU CMU CMU EXP
ROOM
NUMBER
SCHEDULE ABBREVIATIONS: FINISH SCHEDULE NOTES:
SCHEDULE ABBREVIATIONS:
STL STEEL
MMF MANUFACTURER FINISH
LOUVER SCHEDULE
LOUVER
NUMBER
LOUVER FRAME DATA DETAIL
REMARKS
WIDTH HEIGHT DIAMETER MATERIAL FINISH HEAD JAMB SILL
LV-1 1'-6" 8" STL MMF R/A-504 S/A-504 T/A-504
LV-2 1'-6" 8" STL MMF R/A-504 S/A-504 T/A-504
WINDOW SCHEDULE
WINDOW
WINDOW FRAME DATA DETAIL REMARKS
WIDTH HEIGHT GLASS MATERIAL FINISH HEAD JAMB SILL
01 3'-4" 4'-0" GL-2 HM PT K/A-504 L/A-504 M/A-504
VIEW
WINDOW
WINDOW FRAME DATA DETAIL REMARKS
WIDTH HEIGHT GLASS MATERIAL FINISH HEAD JAMB SILL
1 3'-4" 4'-0" GL-3 HM PT N/A-504 P/A-504 Q/A-504 120-MINUTE FIRE RATED ASSEMBLY
SCHEDULE ABBREVIATIONS:
MMF MANUFACTURER FINISH
HM HOLLOW METAL
PT PAINT
GLASS SCHEDULE
GL-1
" TEMPERED VISION GLAZING
GL-2 1" INSULATED GLAZING
GL-3 3/4" FIRE RESISTIVE GLAZING
ACT ACOUSTICAL CEILING TILE
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
EPX EPOXY COATING
EXP EXPOSED
GYP BD GYPSUM BOARD
MMF MANUFACTURER FINISH
PT PAINT
RB RUBBER BASE
SC SEALED CONCRETE
VCT VINYL COMPOSITE TILE
1.
2.
3.
FLOOR FINISH. INSTALL NON-SKID ADDITIVE TO PROVIDE A SLIP
RESISTANT FINISH ON THE FLOOR.
COATING. INSTALL FUEL RESISTANT EPOXY COATING ON CONTROL
ROOM CONCRETE ROOF.
COATING. INSTALL FUEL RESISTANT EPOXY COATING ON PUMP ROOM
SIDE OF CONTROL ROOM BUILDING EAST WALL.
F FLUSH
SL SIDE LIGHT
GL GLASS
HM HOLLOW METAL
PR PAIR
A-501
S C
H E
D U
L E
S
M
H
I C
K S
M
H
I C
K S
M
H
I C
K S
C
L A
Y S
O N
A
D
W G
A M
E N
D M
E N
T
S
P
H M
H
RENEWAL DATE
2/28/2021
C-38283
H. MASON
HICKS, AIA
| Sheets and Views |
| A-501 SCHEDULES |
File details come from the government source that posted it. Updated .