A-002 CODE ANALYSIS.pdf
PDF 957 KB Posted
- Solicitation number
- W912WJ20R0011
About this file
This document provides a code analysis for a proposed fuel facilities replacement project at Quonset Point Air National Guard Station in North Kingstown, Rhode Island. The project involves replacing truck offload and fillstand positions and associated pumping, filtration, and fuel handling equipment to comply with UFC 3-460-01 and DoD Type III Hydrant System standards. Specific work includes constructing a new 600 GPM capacity pumphouse with control room, offload skids, fuel pumps, filter/separator vessels, truck fillstand equipment, associated valves, piping and electrical work. Existing storage tanks will be reused. Construction will be phased to allow continued operation of the existing system until most of the new system is completed. The estimated value of construction work is between $5 million and $10 million. The New England District of the U.S. Army Corps of Engineers will solicit this as a small business set-aside using best value tradeoff procedures.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F I L E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D
2 3
C
4 5
A
B
D A
T E
F I L
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
S M
B L
D E
S C
R I P
T I O
N
C O
N T
R A
C T
O
SHEET
IDENTIFICATION
D A
T E
A P
P R
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
O
E
N G
I N
E E
R S
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
--S E
P T
E M
B E
R
A N
S I
D
OMAHA DISTRICT
S E
A L
D E
S C
S
R
E P
L A
C
U E
L
F
A C
I L
I T
I E
S
Q U
O N
S E
T
A
R
T
I O
N A
L
G
U A
R D
B
S
E
N O
R T
H
K
I N
G S
T O
W N
R
H O
S
L A
N D
R
READY TO ADVERTISE (RTA)
A-002
C O
A
L Y
S I S
M
H
I C
K S
M
H
I C
K S
M
H
I C
K S
C
L A
Y S
O N
A
D
W G
1,520 SF
22'-8" ±
II-B (UNPROTECTED)
BUILDING HEIGHT:
BUILDING DATA - PUMP SHELTER
NUMBER OF STORIES:
TOTAL BUILDING AREA:
CONSTRUCTION TYPE:
CODE REFERENCE / PROJECT DATA
INTERNATIONAL BUILDING CODE (IBC), 2018 EDITION
LIFE SAFETY CODE (LSC) - NFPA 101, 2018 EDITION
APPLICABLE CODES
ASHRAE 90.1 - 2013
ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS - ACCESSIBILITY
STANDARD FOR DEPARTMENT OF DEFENSE FACILITIES, 2015
ACCESSIBILITY:
LIFE SAFETY:
BUILDING:
REFERENCES
1. UNIFIED FACILITIES CRITERIA (UFC) - CURRENT EDITION OF EACH APPLICABLE INDIVIDUAL
DOCUMENT
2. DEPARTMENT OF DEFENSE PRESSURIZED HYDRANT FUELING SYSTEM TYPE III, JULY 2010
INTERNATIONAL MECHANICAL CODE, 2018 EDITIONMECHANICAL:
INTERNATIONAL PLUMBING CODE, 2018 EDITIONPLUMBING:
INTERNATIONAL ELECTRICAL CODE (NEC), 2020 EDITIONELECTRICAL:
INTERNATIONAL FUEL GAS CODE, 2018 EDITION
CODE ANALYSIS / LIFE SAFETY SUMMARY
STRUCTURE DESCRIPTION:
STRUCTURE IS A FULLY ENCLOSED BUILDING, CONTAINING EQUIPMENT TO BE USED FOR
PUMPING FUEL PRODUCT.
CONSTRUCTION
BUILDINGS, OR PORTION THEREOF, IN WHICH HAZARDOUS MATERIALS ARE STORED,
HANDLED OR USED SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE IBC.
OCCUPANCY SEPARATION
IBC 508.4 SEPARATED OCCUPANCIES
BUILDINGS OR PORTIONS OF BUILDINGS THAT COMPLY WITH PROVISIONS OF THIS SECTION
SHALL BE CONSIDERED AS SEPARATED OCCUPANCIES.
IBC 508.4.4 SEPARATION
INDIVIDUAL OCCUPANCIES SHALL BE SEPARATED FROM ADJACENT OCCUPANCIES IN
ACCORDANCE WITH TABLE 508.4
THE SEPARATION SHALL BE PROVIDED BY MEANS OF A FIREWALL (CONFORMING TO IBC,
SECTION 706). THE FIREWALL SHALL BE CONSTRUCTED OBSERVING THE EXCEPTION TO THE
VERTICAL CONTINUITY REQUIREMENT DENOTED IN 706.6.2
IBC OCCUPANCY CLASSIFICATION (CH 3)
THE MAJOR BUILDING OCCUPANCIES ARE CLASSIFIED AS:
BUSINESS (B) (IBC 304.1) - 363 S.F.
CONTROL ROOM
HIGH HAZARDOUS (H-2) (IBC 307.4) - 1,024 S.F.
PUMP ROOM
ACCESSORY OCCUPANCIES
IBC 508.2
ACCESSORY OCCUPANCIES ARE THOSE OCCUPANCIES THAT ARE ANCILLARY TO THE MAIN
OCCUPANCY OF THE BUILDING OR PORTION THEREOF.
REQUIRED SEPARATION OF OCCUPANCIES (IBC TABLE 508.4 AND NFPA 101 (LSC) TABLE
6.1.14.4.1)
REQUIRED WITH EXCEPTION
H-2/B 3 HOUR 2 HOUR
IBC TABLE 508.4 GIVES AN EXCEPTION FOR BUILDING EQUIPPED THROUGHOUT WITH AN
AUTOMATIC SPRINKLER SYSTEM INSTALLED IN ACCORDANCE WITH SECTION 903.3.1.1.
OCCUPANT LOAD FACTORS
NFPA 101 (LSC) TABLE 7.3.1.2 AND IBC TABLE 1004.1.2
- HIGH HAZARD (INDUSTRIAL) - 100 SF/PERSON
- BUSINESS - 100 SF/PERSON
FIRE PROTECTION SYSTEM / EQUIPMENT
STRUCTURE PROVIDED WITH THE FOLLOWING:
- AUTOMATIC SPRINKLER SYSTEM
- FIRE ALARM SYSTEM
NOTE THAT THE CONTROL ROOM (B OCCUPANCY) WILL NOT BE PROVIDED WITH SPRINKLER
COVERAGE DUE TO THE PRESENCE OF ELECTRONIC EQUIPMENT NECESSARY TO THE
OPERATION OF THE FACILITY (INCLUDING FIRE PROTECTION SYSTEMS), AS PERMITTED
UNDER EXEMPTIONS 1,2, AND 4 OF SECTION 903.1.1.1.
CLASS OF CONTENTS OF HAZARD
HIGH-HAZARD
NOTE: THE PUMP ROOM CONTAINS JET A FUEL IN A CLOSED SYSTEM. JET A IS A CLASS II
COMBUSTIBLE LIQUID IN ACCORDANCE WITH NFPA 30. PUMP PRESSURE IS 175 PSIG SO THE PUMP
ROOM IS AN H-2 OCCUPANCY BASED ON IBC 307.4. VOLUME OF JET A CONTAINED IN PIPING AND
COMPONENTS IS ABOUT 26,500 GALLONS.
BUILDING HEIGHTS AND AREAS
FOR THE PURPOSE OF DETERMINING BASIC ALLOWABLE BUILDING HEIGHT AND FLOOR AREA,
THE ENTIRE BUILDING IS BEING CONSIDERED UNDER THE MOST RESTRICTIVE OCCUPANCY OF
H-2.
ALLOWABLE BUILDING HEIGHTS AND ALLOWABLE AREA
H-2 Aa = BUILDING HEIGHT - 55' (TABLE 503)
BUILDING AREA (TABLE 503) 7,000 SF
TYPE II-A CONSTRUCTION (TABLE 503 AND SECTION 602.2)
ACCORDING TO TABLE 601, OTHER THAN WHAT IS ASSOCIATED WITH THE FIREWALL,
DENOTED IN OCCUPANCY SEPARATION ABOVE, NO OTHER BUILDING ELEMENTS (ROOFS,
EXTERIOR BEARING /NON-BEARING EXTERIOR WALLS, ETC.) REQUIRE FIRE RESISTIVE
SEPARATION.
EGRESS REQUIREMENTS
EGRESS REQUIREMENTS ARE BASED UPON NFPA 101 LIFE SAFETY
CODE IN ACCORDANCE TO USE OF EACH MAJOR OCCUPANCY.
NFPA 101 (LSC) 11.2.2.1 GENERAL THE MEANS OF EGRESS PROVISIONS
OF APPLICABLE OCCUPANCY SHALL APPLY EXCEPT AS MODIFIED.
MEANS OF EGRESS
EXIT ACCESS TRAVEL DISTANCE (TABLE 1017.2)
- HIGH HAZARD (H-2) - 100'
- BUSINESS - 300' (NFPA TABLE A.7.6)
MINIMUM EXIT DOOR OPENING WIDTH: 32" (1010)
ABA ACCESSIBILITY
F203 GENERAL EXCEPTIONS
F203.1 GENERAL SITE, BUILDING,
FACILITIES AND ELEMENTS
ARE EXEMPT FROM THESE
REQUIREMENTS TO THE
EXTENT SPECIFIED BY F203.
F203.5 LIMITED ACCESS SPACES
F203.6 MACHINERY SPACES
PROJECT AUTHORITY
PROJECT LOCATION: QUONSET ANG, NORTH KINGSTON, RHODE ISLAND
GOVERNING AGENCY JURISDICTION: US ARMY CORPS OF ENGINEERS (USACE), OMAHA DISTRICT
FIRE:
ENERGY:
GAS:
OCCUPANCY AREA CALCULATION
SPACE
OCCUPANCY
SPACE
SQ. FT.
SQ. FT.
PER
OCC
OCC.
LOAD
EGRESS
REQ'D
EGRESS
PROV'D
REMARKS
PUMP ROOM H-2
1,024
100 11 N/A N/A
CONTROL ROOM B 363 100 4
NOTES:
SPACE SQUARE FOOTAGE NOTED REPRESENTS USABLE FLOOR NET AREA ONLY.
1.
AREA CALCULATIONS
(FOR ALL OCCUPIED AND PRIMARY SPACES)
PUMPHOUSE:
UFC 3-600-01 AND UFC 3-460-01
A M
E N
D M
E N
T
H M
H
S
P
RENEWAL DATE
2/28/2021
C-38283
H. MASON
HICKS, AIA
| Sheets and Views |
| A-002 CODE ANALYSIS |
File details come from the government source that posted it. Updated .