This file contains details regarding a federal contract opportunity and related power diagrams and schedules for the Quonset Point Fuels Storage Complex Replacement project at the Rhode Island Air National Guard Station.
The federal contract opportunity solicitation is for the construction of a new fuels storage complex to replace the existing facility. Work will include replacing the truck offload and fillstand positions and associated pumping/filtration equipment, constructing a new 600 GPM pumphouse with control room and offload skids, upgrading the refueler parking area, and reusing existing storage tanks with the new system. The NAICS code is 236220 and the estimated value is between $5-10 million. The requirement will be solicited as a small business set-aside using Best Value tradeoff procedures.
The power diagrams and schedules provide technical specifications for the electrical work. They show electrical plans and details for the motor control center, generators, transformers, panels, pumps and other equipment for the new fuels storage complex.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F I L E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D
2 3
C
4 5
A
B
D A
T E
F I L
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
S M
B L
D E
S C
R I P
T I O
N
C O
N T
R A
C T
O
SHEET
IDENTIFICATION
D A
T E
A P
P R
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
O
E
N G
I N
E E
R S
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
--S E
P T
E M
B E
R
A N
S I
D
OMAHA DISTRICT
S E
A L
D E
S C
S
R
E P
L A
C
U E
L
F
A C
I L
I T
I E
S
Q U
O N
S E
T
A
R
T
I O
N A
L
G
U A
D
B
S
E
N O
R T
H
K
I N
G S
T O
W N
R
H O
D
L A
N D
R
READY TO ADVERTISE (RTA)
PROFESSIONAL
G EO R G I A
D O
UG L A S P . E NG
E
L
ENG I NE ER
REGI STERED
No. 41840
EP601
P O
W E
R
D
I A
G R
A M
S
A
N D
S C
H E
D U
L E
S
D
E
N G
E L
E
J A
C K
S O
N M
K
L U
T T
Z
C
L A
Y S
O N
E
P D
W G
R
G
HOA
NEW 200kW/250kVA
MIN. 275 KVA SITE ALT.
R5
R9 R10 R11
60A/330A/3
100AF/3
100AT
GFI
FVNR
NEMA 1
RVSS
NEMA 4
RVSS
NEMA 4
RVSS
NEMA 4
PANEL HP
200A MLO
FILLSTAND
ISSUE PUMP
IP-1
30 HP
FILLSTAND
ISSUE PUMP
IP-2
30 HP
FILLSTAND
ISSUE PUMP
IP-3
30 HP
MAX. 15' 6"
M
A X
MM M
G
GENERAL NOTES:
1. THE HORSEPOWERS INDICATED ARE APPROXIMATE. MOTORS ARE TO BE SIZED IN ACCORDANCE WITH
PERFORMANCE INFORMATION GIVEN IN OTHER PORTIONS OF THE PLANS AND SPECIFICATIONS.
NOTIFY CONTRACTING OFFICER IF MOTORS, OR OTHER COMPONENTS OR EQUIPMENT ARE
FURNISHED IN SIZES OTHER THAN INDICATED
2. CONTRACTOR SHALL SUPPLY CAPACITORS OF THE SIZE RECOMMENDED BY THE MANUFACTURES FOR
MOTORS INDICATED TO HAVE CAPACITORS.
3. SEE SHEET EP604 FOR CONDUIT AND CABLE SCHEDULES, FOR POWER AND CONTROLS
REQUIREMENTS.
4. PROVIDE ARC FLASH WARNING SIGNS ON SWITCHBOARDS, PANELBOARDS, INDUSTRIAL CONTROL
PANELS, METER SOCKET ENCLOSURES, PUMP CONTROL PANEL AND MOTOR CONTROL CENTERS AS
REQUIRED PER NFPA 70 (NEC) ARTICLE 110.16,. REFERENCE NFPA 70 ARTICLE 110.16, NFPA 70e
ARTICLE 130.3, AND UFC 3-560-01, ELECTRICAL SAFETY, O&M.
GENERATOR
R8
FUEL TRANSFER
PUMP FTP-1
5 HP
M
SPD/TVSS
400AF / 400AT
LS
SPARE
100A/3
SPARE
225A/3
SPACE
KEYED NOTES:
1. SEE 1/EP503 FOR CONTROLS DIAGRAM.
2. SEE 2/EP503 FOR CONTROLS DIAGRAM.
3. SIZE POWER FACTOR CORRECTION CAPACITORS PER MANUFACTURER RECOMMENDATIONS.
4. KEYED HOA SWITCHES IN THE MCC SHALL BE KEYED ALIKE WITH THE CORRESPONDING
KEYED HAND-OFF SWITCHES LOCATED NEAR THE MOTORS. SEE SHEET EP-501 FOR WIRING
DIAGRAM AND EP101 FOR LOCATIONS
5. PROVIDE REDUCED VOLTAGE AUTO-TRANSFORMER STARTERS (RVAT) WITH SEVERE /
EXTREME DUTY RATING FOR OVERLOAD AND CONSTANT CURRENT. STARTERS ARE TO BE
INITIALLY SET TO 80% RATING
6. PROVIDE FAULT CURRENT; ARC FLASH AND COORDINATION STUDIES AS REQUIRED PER
SPECIFICATION SECTION 26 28 01.00 10. UTILIZE ACTUAL RATINGS OF EQUIPMENT PROVIDED
FOR THE PROJECT IN STUDIES.
7. ELECTRIC METER SHALL PROVIDE HISTORICAL KILO-WATT-HOUR AND KILO-WATT-DEMAND
INFO. IT SHALL BE ACCESSIBLE REMOTELY.
8. THE CONTRACTOR SHALL INSTALL ALL TRANSFORMERS SUCH THAT THE SECONDARY
CONDUCTORS ARE NO LONGER THAN 25FT BEFORE TERMINATING IN A SINGLE
OVERCURRENT DEVICE PER NEC 240.21.C.6.
2 1 1 1
R3
100AF/3
100AT
GFI
100AF/3
100AT
GFI
MCC SINGLE LINE DIAGRAM
SCALE: NTS
MOTOR CONTROL CENTER PLAN VIEW
SCALE: NTS
800AF/800AT
K
42KAIC, GFI
IC / LSG
DRAW-OUT
K
42KAIC,
IC / LSG
DRAW-OUT
800AF/400AT
SURGE
PROTECTIVE
DEVICE
AS A
VS V
METERING
K K
PANEL HP
INCOMING
MAIN
BREAKER
INCOMING
GEN
BREAKER
M
A X
GROUND BUS
NEUTRAL BUS
R2
T-1
R1
9kV
50 AMP
SURGE
ARRESTOR
500 KVA, 3 PHASE, 2.0% Z (MIN.)
12,470V - 480Y/277V
PAD MOUNTED TRANSFORMER
MOTOR CONTROL CENTER (MCC)
800A MAIN BUS, 480/277V, 3 PHASE, 4 WIRE, 42KAIC FULLY RATED
600 AMP VERTICAL AND GROUND BUS
SERVICE ENTRANCE RATED FRONT ACCESSABLE ONLY
100AF/3
100AT
GFI
TRUCK
OFFLOAD
SKID WITH
PUMP OP-1
25 HP
TRUCK
OFFLOAD
SKID WITH
PUMP OP-2
25 HP
MOTOR CONTROL CENTER ELEVATION
SCALE: NTS
WATER
HEATER
100AF/3
100AT
GFI
CONTRACTOR'S PROTECTIVE
COORDINATION STUDY
SHALL VERIFY FUSE SIZE PER
SPEC SECTION 26 28 01.00 10
200 AMP LOAD BREAK,
4-WAY DISCONNECT
#4/0 TO COUNTERPOISE /
GROUND RING
GROUND GIRDLE FOR GENERATOR
PAD SIMILAR TO DETAIL 3/EG502
#4/0 TO
COUNTERPOISE /
GROUND RING
#2/0
#4/0
R6
WH-1
63 KW INST. WATER
HEATER IWH-1
IN RISER ROOM
100/3
3R
80A/3
SPACE
BLDG 14
20"20"25"20"
25" 25"
FTP-1
250AF/3
200AT
SPACE
OFFLOAD 1
25" 25"
EXISTING 12.47KV TERMINAL CABINET TC#6.
UTILIZE SPARE SET OF SPADES FOR CONNECTION OF NEW
ELECTRICAL SERVICE. SEE ES-402 AND ES-403 FOR LOCATION.
S P
A R
E
HO
R
HOA
HO
R12 R13 R4
R6
PROVIDE EACH MV CABLE WITH A 200 AMP
LOAD BREAK ELBOW, OR PER BASE
REQUIREMENTS, FOR CONNECTION TO
EXISTING SECTIONALIZER CABINET SPADES.
R14
4 4 4 4
5 5 5
TO TERMINAL
CABINET TC#10
TO TERMINAL
CABINET TC#5
TO TERMINAL
CABINET TC#8
EXISTING 12.47KV TERMINAL CABINET TC#7 .
WHEN THE TRANSFORMER SERVING BLDG #18 IS DISCONNECTED,
THIS CABINET WILL HAVE ONE SET OF SPARE SPADES.
TO TRANSFORMER
T#3
TO BLDG #18
KWH
KWD
EXISTING BLDG #18 75KVA PAD MOUNT TRANSFORMER.
DISCONNECT AND TURN OVER TO THE BASE AT THE
COMPLETION OF THE PROJECT.
BACKFEED
TO BLDG 14
EXIST.
PANEL P1
BLDG 14
125A MCB
45KVA,
480-208Y/120V
DRY TYPE
MINIMUM 5% Z
PANEL
PP1
125A MCB
SPD/TVSS
80A/3
FILLSTAND
ISSUE PUMP
IP-1
30 HP
FILLSTAND
ISSUE PUMP
IP-2
30 HP
FILLSTAND
ISSUE PUMP
IP-3
30 HP
SPARE
PANEL PP1
100A/3
R14
PANEL
PP2
125A MCB
SPD/TVSS
80A/3
PANEL PP2
EXIST.
PANEL P2
BLDG 14
100A MLO
42KAIC,
#4
R4A
#4#4
R14A R14A
33,500A RMS SYM
20,200A RMS SYM
6 6 6
100/3
3R
45KVA,
480-208Y/120V
DRY TYPE
MINIMUM 5% Z
45KVA,
480-208Y/120V
DRY TYPE
MINIMUM 5% Z
8 8
OFFLOAD 2
SPACE
A
M E
N D
M E
T
D
P E
SURGE
PROTECTIVE
DEVICE
P
| Sheets and Views |
| EP601 POWER DIAGRAMS AND SCHEDULES |
File details come from the government source that posted it. Updated .