This standard operating procedure outlines preventative maintenance requirements for mini-split air conditioning units at the US Navy Medical Research Unit Six facility in Puerto Maldonado, Peru. The contractor must perform quarterly and annual preventative maintenance on ten mini-split units of varying capacities and brands. Required preventative maintenance tasks include cleaning evaporator coils and condensers, adjusting refrigerant levels, replacing insulation, cleaning air filters, verifying temperature sensors and leak detection, belt and bearing inspection, electrical safety checks, and annual CAD drawing updates. The contractor is responsible for providing trained technicians, all necessary equipment and materials, and weekly and completion reporting to the NAMRU-6 facilities department.
This solicitation seeks proposals for the operation, maintenance, and support services of US Navy Medical Research Unit Six facilities in Lima and other locations in Peru. The firm-fixed-price contract will include preventative, predictive, demand, and emergency maintenance of architectural, mechanical, electrical, and instrumentation systems. Grounds maintenance is also required. The contractor must be knowledgeable in medical research facility maintenance and minimize disruption to laboratory operations. Facilities include BSL-2 and BSL-3 laboratories, vivariums, administrative spaces, and utilities. The contractor may be subject to security and health screening. The size standard is $41.5M average annual revenue. The solicitation is available at the provided SAM.gov website and will not be issued in paper format.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD OPERATING PROCEDURE (SOP) – QUARTERLY PREVENTIVE
MAINTENANCE ACTIVITIES FOR HVAC SYSTEM IN PUERTO
MALDONADO SITE
General Requirements for Lima, Iquitos and Puerto Maldonado
NAMRU-6 at Puerto Maldonado has 10 ductless mini-split air conditioning units, as described in table below:
Item Room name Quantity Type Capacity Brand Refrigerant
1 Laboratory #3 1 mini-split 18,000BTU/H LG R-22
2 Laboratory #2 1 mini-split 18,000 BTU/H YORK R-22
3 Conference room 1 mini-split 24,000 BTU/H LG R-22
4 Laboratory #1 2 mini-split 24,000 BTU/H YORK R-22
5 Files room 1 mini-split 12,000 BTU/H YORK R- 410A
6 UPS - Electrical room 1 mini-split 24,000 BTU/H YORK R-410A
7 Office #1 1 mini-split 12,000 BTU/H LG R-22
8 Office #2 1 mini-split 12,000 BTU/H LG R-22
9 Office #3 1 mini-split 12,000 BTU/H YORK R-410A
TOTAL 10
Contractor shall provide the names and certification of the technicians performing preventive maintenance tasks. Only qualified technicians shall perform preventive and corrective maintenance tasks.
Contractor shall perform quarterly and annual preventive maintenance activities to all of the air conditioning units specified in this document. It is the responsibility of the contractor to perform a full inspection of the systems and collect all required information to provide a quality preventive maintenance. In addition, contractor shall review operation manuals for the equipment of the systems under this contract and include any recommended preventive maintenance activities by the manufacturer not mentioned in this document.
Contractor shall elaborate, review and update the drawings in AUTOCAD of the HVAC system in Puerto Maldonado sites on an annual basis.
Section J - Exhibit 11.2.2 SOP-FAC 016
Contractor shall include all materials, tools and personal protective equipment necessary to perform preventive and corrective maintenance work. Contractor must use the necessary and appropriate equipment to delimit the work area and not allow the pedestrian traffic. The contractor’s staff shall use the appropriate PPE for the activity to perform. NAMRU-6 will not provide any materials, tools nor PPE to the contractor to perform their work.
The contractor shall provide a weekly progress report to the NAMRU-6 facilities department, as well as a completion report when completing the maintenance work to include: activities performed with pictures, recommendations, conclusion and future needed corrective maintenance tasks. When a corrective maintenance work is required, the contractor shall submit a report detailing the problem encountered, with a quotation of the solution.
The preventive maintenance work will be coordinated between NAMRU-6 facilities staff and the staff assigned by the contractor.
Contractor shall perform operational testing of the systems at the completion of each preventive maintenance work. NAMRU-6 facilities department will assign a staff to participate in the operational testing and contractor shall prepare an operational testing form (checklist) to be signed by the facilities staff once testing is perform and accepted.
It is the responsibility of the contractor to dispose properly out of NAMRU-6 facilities all consumable materials and garbage generated by the contractor during the performance of the maintenance activities.
Applicable codes:
The following are applicable codes for the elaboration of the preventive maintenance plan, reports and activities mentioned in this document:
NACE
ASHRAE
IMC-International Mechanical Code BMBL 6th edition (Biosafety in Microbiological & Biomedical Laboratories) OEBGD (Overseas Environmental Baseline Guidance Document) DoD UFC (Unified Facilities Criteria)
NFPA 77
NFPA 70
NEC (National Electrical Code) Local (Host Country) regulations RNE (Peruvian National Building Code) IBC (International Building Code)
NACE
AWWA
IPC (International Plumbing Code)
Description of work required in Puerto Maldonado
HVAC systems in Puerto Maldonado
The contractor shall perform the following preventive maintenance activities:
HVAC system – Puerto Maldonado Item Sub-system Task Frequency
1 Mechanical system of HVAC units
Cleaning of evaporator coils and condenser coils, internal and external, with pressurized liquid.
Quarterly
2 Mechanical system of
Cleaning of condensate tray (tray), to avoid plugging the condensation water discharge.
Quarterly
3 Mechanical system of
Cleaning of motor blades, grids, condensers and turbines.
Quarterly
4 Mechanical system of
Adjustment of charge and refrigerant gas
R-22, according to equipment design.
(Alternatively, ecological refrigerant as applicable).
Quarterly
5 Mechanical system of
Change of insulating sleeve (armaflex) in copper pipe, if necessary Quarterly
6 Mechanical system of
Cleaning of air filters Quarterly
7 Mechanical system of
Verification of temperature of the conditioned areas. Temperature sensor ohm value reading.
Quarterly
8 Mechanical system of HVAC units
Verification and, where appropriate, correction to the compressor duty cycle. Quarterly
9 Mechanical system of HVAC units
Verification and, where appropriate, correction of leaks. Quarterly
10 Mechanical system of HVAC units
Cleaning of thermostat, verifying that it works correctly, in its stop, start and automatic cut by temperature.
Quarterly
11 Mechanical system of HVAC units
Verification of the conditions and trajectory of the ducts of the air conditioning system. Quarterly
12 Mechanical system of HVAC units Repair of leaks in external ducts (foil). Quarterly
13 Mechanical system of HVAC units
Verification of belts, pulleys and bearings;
adjustment, cleaning, lubrication and leveling.
Quarterly
14 Mechanical system of
Guarantee that the equipment works 24 hours. Quarterly
15 Mechanical system of HVAC units
Change of service valve, o-wheels, seals, according to their condition. Quarterly
16 Mechanical system of HVAC units
Check working parameters, voltage, temperature, etc. Perform testing to demonstrate equipment is working in good conditions.
17 Electrical system of HVAC units
Review of the electrical supply from the panel to the unit, tightening the terminals forthe driver's arrival and the output of the thermal pad, before and after providingpreventive maintenance service to the unit.
Quarterly
18 Electrical system of HVAC
Review of arrival of electrical power to the terminals of the equipment, before andafter providing preventive maintenance service to the unit.
Quarterly
19 Electrical system of HVAC
Measurement of current consumption at start-up and work, normal voltage Quarterly
20 Electrical system of HVAC
Verify the incoming voltage to the control board, which is the design of the unit,before and after providing preventive maintenance service to the unit.
Quarterly
21 Electrical system of HVAC
Verify consumption amperage, before and after giving preventive maintenance serviceto the unit.
Quarterly
22 Electrical system of HVAC
Cleaning contactors and control panel relays with dielectric liquid.
Quarterly
23 Electrical system of HVAC
Cleaning, washing and drying (dielectric spray, moisture displacer) of the main controlelectronic card.
Quarterly
24 Electrical system of HVAC
Lubrication and engine cleaning. Quarterly
25 Electrical Panelboards of HVAC units Inspection and cleaning of exterior panel Quarterly
26 Electrical Panelboards of HVAC units Inspection and cleaning of interior panel Quarterly
27 Electrical Panelboards of HVAC units
Inspection and cleaning of interior devices using appropriate dielectric solvent Quarterly
28 Electrical Panelboards of HVAC units
Check operation of each contactor and breaker Quarterly
29 Electrical Panelboards of
Inspection and tighten of all electrical connections inside the panel Quarterly
30 Electrical Panelboards of HVAC units
Check and install missing labels of wires and breakers Quarterly
31 Electrical Panelboards of HVAC units
Provide and replace new signs and labels mounted in the panels Quarterly
Electrical Panelboards of
HVAC units Check and provide missing electrical drawings and/or circuit’s description card in the panels
Quarterly
33 General Update CAD drawings of HVAC systems Annual
Contractor will also include requirements per O&M manuals and any additional requirements not mentioned in this document but required or recommended by manufacturer as preventive maintenance activities to perform quarterly or annually.
ADDITIONAL INFORMATION
ANNEX 1: LOCATION OF AIR CONDITIONERS IN NAMRU-6 PUERTO MALDONADO
ANNEX 2: 2020 PREVENTIVE MAINTENANCE TO HVAC IN PUERTO MALDONADO
ANNEX 3: 2021 CORRECTIVE MAINTENANCE TO HVAC IN PUERTO MALDONADO
ANNEX 1
ANNEX 2
RUC:10415548520
UNA ALTERNATIVA DIFERENTE DE AIRE ACONDICIONADO Y REFRIGERACION
SERVICIO DE MANTENIMIENTO Y REPARACION DE EQUIPOS DE REFRIGERAOON Y AIRE
ACONDICIONADO-VENTA DE REPUESTOS Y EQUIPOS DE AIRE ACONDICIONA0O EN
GENERAL
N. Q 0001
A
De
Asunto
Fecha
Embajada Americana (NAMRU-6).
Rafael Gutierrez Cruz Oefe de taller) lnforme mantenimiento preventivo y estado de aire acondicionados marca LG. orden # 19PE5019P0755
Puerto Maldonado, 04 de agosto de 2020
Con respecto al documento es un honor dirigirme a Ud. para saludarlo e informar lo siguiente:
INTRODUCCION
En el presente informe es por mantenimiento preventivo y estado de 4 equipos de aire acondicionado en las oficinas N.'2 1 {A/AC 12000 BTU), N'22 (A/AC 12000 BTU), sala conferencia (A/AC 24000 BTU) y laboratorio (A/AC 18000 BTU), que por el tiempo de vida y por sonidos inadecuados y vibraciones, chillidos de los ventiladores y por usos de refrigerantes no eco16gicos (R22) en la unidad de condensacion y en las unidades evaporadoras fallas de control remoto, fUtros de malla para polvo deteriorado, carcaza exterior resecos y amarillentos. Los equipos actualmente estan operativos dado que tienen un mantenimiento preventive y correctivo, pero dado el deterioro de algunos componentes extemos e internos, tomamos la decision de informarle que si tuvieran un funcionamiento continua los equipos presentarfan diferentes fallas que saldrfan de la mano de los tecnicos poder solucionarlos por los desperfectos ya mencionados.
OBJETIVO
Se sugiere el cambio de dichos equipos por equipos ecol6gicos mas amigables con el medio ambiente
(R410) y que a su vez tengan la opci6n de REINICIO AUTOMATICO, ya que al estar en una zona de apagones intempestivos ya sea por factor�s_ huma nos o naturales, puedan encender con un reinicio automatico sin necesidad de un usuario