This document outlines a federal contract opportunity for operation and maintenance services at US Navy Medical Research Unit Six facilities in Peru. The solicitation seeks a contractor to provide all personnel, services, materials, and transportation necessary for continuous operation and maintenance of NAMRU-6 medical research laboratory facilities and support structures across sites in Lima and other dispersed locations in Peru. Requirements include preventive, predictive, demand, and emergency maintenance for architectural, mechanical, electrical, and instrumentation systems. Limited groundskeeping is also required. The contract type will be firm-fixed-price for a base year and four option years. The contractor must minimize laboratory disruption and comply with regulatory bodies such as AAALAC. Facilities include BSL-2 and BSL-3 research labs and support spaces. The solicitation number is W9127822R0005 and will be posted at https://sam.gov/. The size standard is annual average gross revenue not exceeding $41.5 million for the past three years under NAICS 561210.

View the file

Other files

File Type Posted
W9127822R0005 Solicitation-Amend 0006.pdf PDF
W9127822R0005 Second Site Visit Attendance List.pdf PDF
W9127822R0005 Solicitation-Amend 0004.pdf PDF
W9127822R0005 Solicitation-Amend 0003.pdf PDF
W9127822R0005 Pre-Proposal Conference Attendance List.pdf PDF
W9127822R0005 Pre-proposal Conference Slide Presentation.pdf PDF
W9127822R0005 Solicitation-Amend 0002.pdf PDF
W9127822R0005 Solicitation-Amend 0001.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 008 Boiler & Cage Washer.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.3 Site Plan Puerto Maldonado.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.13 Bid Schedule.xlsx XLSX spreadsheet
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 017 Landscape Maintenance.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 006 Grounding & Lightning Protection System.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 014 Building Automation System.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 016 HVAC System Puerto Maldonado.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 021 Sterilizer.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 018 Water Treatment Systems.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 015 HVAC System Iquitos.pdf PDF
W9127822R0005 Section J - List of Exhibits.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.11 Form W-14.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.5 US & Host Nation Holidays.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 012 Fire Protection System.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 010 X-Ray Security Scanner.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.9 RSO Personnel Screening Requirements.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.3 Site Plan Iquitos.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 011 Fire Alarm System.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 003 Generator.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.4 Unscheduled Maintenance Service Calls 2020 & 2021.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 007 UPS.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.7 Known Asbestos, Lead & Other Hazard Materials.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.3 Site Plan Lima .pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 001 Access Control CCTV & Public Address System.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 020 Exterior & Interior Building Maintenance.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 004 Auto Lighting System Animal Facilities.pdf PDF
W9127822R0005 Solicitation.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.1 Requirements List.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.8 NAMRU-6 Safety & Security Requirements.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.12 Instructions for Form W-14.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.10 List of Acronyms.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 019 Pest Control Disinfection of Areas.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 009 Elevators.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.4 NAMRU-6 Standard Service Calls.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 005 Electrical Substation & Main Panelboards.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.6 US Navy OEBGD.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 013 HVAC System Lima.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD OPERATING PROCEDURE (SOP) – QUARTERLY PREVENTIVE

MAINTENANCE ACTIVITIES FOR ABOVEGROUND DIESEL TANKS &

ASSOCIATED EQUIPMENT IN NAMRU-6 LIMA, IQUITOS AND PUERTO

MALDONADO SITES

General Requirements for Lima, Iquitos and Puerto Maldonado

NAMRU-6 has the following aboveground diesel tanks and associate equipment in Lima, Iquitos and Puerto Maldonado sites:

- Lima site:

• One 8,000 gallons double wall steel aboveground diesel tank, built under UL-142 and UL 2085 standards, manufactured in USA.

• One 100 gallons day tank for HVAC heater

• One 100 gallons day tank for Boiler

• Two 1,000 gallons day tanks for Generators

• Delivery and transfer pumps for the filling point

• Two submersible pumps and fuel pipes to distribute fuel from 8,000 gallons diesel tank to day tanks

• Electrical and control panels for leak detection, TS-550 console

• Cathodic protection and associated electrical panel

• Electric and control panels for operation of pumps

• Slab and concrete foundations where the tank is placed and perimeter metallic fencing to delimit the area

• Fuel spillage collection concrete vault with valve

• Emergency portable tank and manual pump and hose for spillage collection

• Solenoid valves in each day tank and level sensors

- Iquitos site:

• One 1,000 gallons day tank for Generator

- Puerto Maldonado site:

• One 100 gallons day tanks for Generator

• Diesel pipes from 100 gallons day tank to Generator

Contractor shall provide the names and certification of the technicians performing preventive maintenance tasks. Only qualified technicians shall perform preventive and corrective maintenance tasks. The diesel fuel type in the tanks, categorized in Peru, is DB-5.

Contractor shall perform quarterly and annual preventive maintenance activities to all of the tanks & associated equipment specified in this document. It is the responsibility of the contractor to perform a full inspection of the systems and collect all required information to provide a quality preventive maintenance. In addition, contractor shall review operation manuals for the

Section J - Exhibit 11.2.2 SOP-FAC 002 equipment of the systems under this contract and include any recommended preventive maintenance activities by the manufacturer not mentioned in this document.

Contractor shall elaborate, review and update the drawings in AUTOCAD of the diesel tank systems in Lima, Iquitos and Puerto Maldonado sites on an annual basis.

The tanks & associated equipment in Iquitos and Puerto Maldonado sites are only day tanks and pipes to store diesel for generators. The diesel system in Lima site is complex and consist of a main 8,000 aboveground diesel tank and submersible pumps mounted in the tank that fill the four day tanks (one for HVAC heater, one for Boiler and two for generators). These pumps work alternately according to the requirement of the day tanks and while one is working, the other is on standby mode. Each of the day tanks have a level measurement system, which determine the max and min filling levels in the day tanks. Solenoid valves in each tank run the submersible pumps to fill the day tanks. The pumps can also operate from the control panel (HMI touch operator screen) installed in the proximity of the main aboveground diesel tank. In addition, a console for the leak detection system and solenoid valves are installed in the system to advise when there is a fuel leak in the diesel system. A chatodic protection system protects only a portion of new diesel steel pipes recently installed from the main tank to a concrete box near the electrical and control panels. The filling of the day tanks is done in automatic mode.

More information of the operation of the automatic filling system can be found in the O&M manuals.

Contractor shall include all materials, tools and personal protective equipment necessary to perform preventive and corrective maintenance work. Contractor must use the necessary and appropriate equipment to delimit the work area and not allow the pedestrian traffic. The contractor’s staff shall use the appropriate PPE for the activity to perform. NAMRU-6 will not provide any materials, tools nor PPE to the contractor to perform their work.

The contractor shall provide a weekly progress report to the NAMRU-6 facilities department, as well as a completion report when completing the maintenance work to include: activities performed with pictures, recommendations, conclusion and future needed corrective maintenance tasks. When a corrective maintenance work is required, the contractor shall submit a report detailing the problem encountered, with a quotation of the solution.

The preventive maintenance work will be coordinated between NAMRU-6 facilities staff and the staff assigned by the contractor.

Contractor shall perform operational testing of the systems at the completion of each preventive maintenance work. NAMRU-6 facilities department will assign a staff to participate in the operational testing and contractor shall prepare an operational testing form (checklist) to be signed by the facilities staff once testing is perform and accepted.

It is the responsibility of the contractor to dispose properly out of NAMRU-6 facilities all consumable materials and garbage generated by the contractor during the performance of the maintenance activities.

Contractor shall perform quarterly fuel tests for verifying the quality of diesel fuel DB5.

Contractor shall take special attention to detect water on fuel. Contractor to provide a written report of the test and certification provided by the company performing the test. In attachment one at the end of this document, find an example of the minimum parameters to include in the test (viscosity, sulfur, particle count, API gravity-density-relative humidity, V40, Biodiesel, PQI, etc.).

Applicable codes:

The following are applicable codes for the elaboration of the preventive maintenance plan, reports and activities mentioned in this document:

NACE

ANSI/NFPA 30

ANSI/NFPA 30A

ANSI/NFPA 31

ANSI/NFPA 37

ANSI/NFPA 1

ANSI/UL 142

ANSI/UL 2085

NFPA 77

NFPA 70

API RP 500

NEC

OSINERGMIN codes/norms/regulations

Description of work required in Lima

MAIN ABOVE GROUND DIESEL TANK (8,000 GALL) AND ASSOCIATED EQUIPMENT

The contractor shall perform the following preventive maintenance activities:

MAIN ABOVE GROUND DIESEL TANK (8,000 GALL) AND ASSOCIATED EQUIPMENT –

LIMA

Item Sub-system Task Frequency 1 Aboveground Diesel Tank Inspection and cleaning of diesel tank Quarterly

2 Aboveground Diesel Tank Check for visible signs of leakage from tank Quarterly

3 Aboveground Diesel Tank Check for visible signs of water o leakage into interstice of double walled tank Quarterly

4 Aboveground Diesel Tank Check for visible signs of water in primary tank Quarterly

5 Aboveground Diesel Tank Containment

Inspection and cleaning of tank containment Quarterly

6 Aboveground Diesel Tank Containment

Inspection and cleaning of secondary containment drain Quarterly

7 Aboveground Diesel Tank Containment

Inspection and cleaning of pathways and entry into tank containment Quarterly

8 Aboveground Diesel Tank Containment

Inspection and cleaning of metallic perimeter fence Quarterly

9 Aboveground Diesel Tank Containment

Inspection and cleaning of concrete bollards Quarterly

10 Aboveground Diesel Tank Containment Inspection and cleaning of concrete walls Quarterly

11 Aboveground Diesel Tank Containment

Inspection and cleaning of concrete foundations Quarterly

12 Aboveground Diesel Tank Containment

Inspection and cleaning of concrete stairs and handrails to access to tank containment

Quarterly

13 Aboveground Diesel Tank Containment

Inspection and cleaning of emergency stop button and pole Quarterly

14 Aboveground Diesel Tank Containment

Inspection and cleaning of exterior power outlet and pole Quarterly

15 Aboveground Diesel Tank Containment

Inspection and cleaning of concrete box diesel fuel leak storage Quarterly

16 Aboveground Diesel Tank Containment

Inspection and cleaning of concrete box diesel fuel leak storage, metal cover and valves

Quarterly

17 Aboveground Diesel Tank Containment

Check for visible signs of leakage onto surrounding soil Quarterly

18 Aboveground Diesel Tank Containment

Check for visible signs of leakage into tank containment Quarterly

19 Aboveground Diesel Tank Attachments Inspection and cleaning of ladders Quarterly

20 Aboveground Diesel Tank Attachments

Inspection and cleaning of platforms and handrails Quarterly

21 Aboveground Diesel Tank Attachments

Inspection and cleaning of pipes and attachments (emergency and normal vents, manhole, valves, tank connections, sensors, level and every other device physically connected to the tank).

Quarterly

22 Aboveground Diesel Tank Attachments

Inspection and cleaning of submersible pumps Quarterly

23 Aboveground Diesel Tank Attachments

Check for visible signs of leakage in valves, tank drain, tank fill box and tank fill box drain

Quarterly

24 Aboveground Diesel Tank Attachments

Check operation of liquid level sensing devices Quarterly

25 Aboveground Diesel Tank Attachments

Check for visible signs of leak in pipe connections Quarterly

26 Aboveground Diesel Tank Attachments

Check operation of overfill prevention equipment Quarterly

27 Aboveground Diesel Tank Attachments

Inspect and tight and/or seal tank openings properly Quarterly

28 Aboveground Diesel Tank Attachments

Check operation of automatic tank gauge system Quarterly

29 Panel TBC – Control Of Diesel Fuel Pumps Inspection and cleaning of exterior panel Quarterly

30 Panel TBC – Control Of Diesel Fuel Pumps

Inspection and cleaning of interior panel and devices Quarterly

31 Panel TBC – Control Of Diesel Fuel Pumps

Inspection and tighten of all electrical connections inside the panel Quarterly

32 Panel TCA – Control Of Alarms Inspection and cleaning of exterior panel Quarterly

33 Panel TCA – Control Of Alarms

Inspection and cleaning of interior panel and devices Quarterly

34 Panel TCA – Control Of Alarms

Inspection and tighten of all electrical connections inside the panel Quarterly

35 Panel TS550 – Leak Detection System Inspection and cleaning of exterior panel Quarterly

36 Panel TS550 – Leak Detection System

Inspection and cleaning of interior panel and devices Quarterly

37 Panel TS550 – Leak Detection System

Inspection and tighten of all electrical connections inside the panel Quarterly

Tank Filling System

Simplex– Smartpump With Large Control Box

Inspection and cleaning of metal panel to include filling box and leak collection platform

Quarterly

Tank Filling System

Simplex– Smartpump With Large Control Box

Inspection and cleaning of exterior panel Quarterly

Tank Filling System

Simplex– Smartpump With Large Control Box

Inspection and cleaning of interior panel and devices Quarterly

Tank Filling System

Simplex– Smartpump With Large Control Box

Inspection and tighten of all electrical connections inside the panel Quarterly

Diesel Fuel Pipes From

Main Diesel Tank To Day Tanks

Inspection and cleaning of pipes Quarterly

Diesel Fuel Pipes From

Main Diesel Tank To Day Tanks

Inspection and cleaning of manifold and metal box Quarterly

Diesel Fuel Pipes From

Main Diesel Tank To Day Tanks

Inspection and cleaning of concrete channels Quarterly

Electrical & Control Wires

From Pain Panels To Devices In Day Tanks

Inspection and cleaning of wires Quarterly

Electrical & Control Wires

From Pain Panels To Devices In Day Tanks

Inspection and tighten of all electrical connections to the devices Quarterly

Underground Pull Boxes For Feeders And

Concrete/Steel Boxes For Diesel Fuel Pipes

Inspection and cleaning of boxes and metal covers Quarterly

48 Cathodic Protection Preventive maintenance to cathodic protection. Quarterly

49 Grounding System Preventive maintenance to all grounding pits (static and dynamic). Quarterly

50 Electrical and Control Panels in general Visual inspection Quarterly

51 Electrical and Control Panels in general

External cleaning of panels using appropriate tools Quarterly

52 Electrical and Control Panels in general Remove dust from all electronic parts. Quarterly

53 Electrical and Control Panels in general

Cleaning of internal components, main contactors and circuits using appropriate cleaning tools

Quarterly

54 Electrical and Control Panels in general Check and organize cables if necessary Quarterly

55 Electrical and Control Panels in general Identification and labeling of cables Quarterly

56 Electrical and Control Panels in general Verify grounding Quarterly

57 Electrical and Control Panels in general

Verify operation of the printed circuit boards Quarterly

58 Electrical and Control Panels in general Test operation of the panels Quarterly

59 Others Perform inspections to identify areas for repair to the concrete foundations and/or the diesel tanks.

Quarterly

60 Others Check visible signs of leakage from tank Quarterly

61 Others Check visible signs of product leakage into containment Quarterly

62 Others Check visible signs of leakage onto surrounding soil Quarterly

63 Others Checks signs of product or water into interstice of double-walled tank Quarterly

64 Others Check sign of water in main primary tank Quarterly 65 Others Check valves show signs of fuel leakage Quarterly

66 Others Check operation of liquid level sensing devices Quarterly

67 Others Check that drain openings are liquid tight. Quarterly

68 Others Check the suction cartridge of the submersible pumps Quarterly

69 Others Check valves, accessories and fuel lines, if any dripping of fuel appears Quarterly

70 Others Disconnect power of all panels and tighten all connections to ensure proper operation Quarterly

71 Others

Carefully wipe the outer areas of the console (system of control of operation of submersible pumps and leak detection system) with a soft, damp cloth to remove any residue or build-up. Avoid spraying the console with chemicals that could damage the protective cover of the LCD display

Quarterly

72 Others

Ensure that data communications and electrical energy lines are segregated so that electrical interference will not induced into data transmission lines, or erroneous data returns could result

Quarterly

73 Others Check if the LCD touch screen is operating correctly and calibrate if necessary following O&M manual procedures

Quarterly

74 Others

Verify printer and change printer paper if necessary. Paper specifications are: type, thermal printer paper, width; 58mm (2.28”), FFS part #: TS-TP2.

Quarterly

75 Others Verify cabling is not corroded or in bad shape or deteriorated. Proceed to replace cabling if necessary.

Quarterly

76 Others Perform a fuel tests for verifying the quality of diesel fuel DB5 Quarterly

77 Aboveground Diesel Tank Inspection of diesel tank to verify if it is dented, buckled, bulging or cracked Annual

78 Aboveground Diesel Tank Check for visible signs of leakage from tank Annual

79 Aboveground Diesel Tank Check for visible signs of water o leakage into interstice of double walled tank Annual

80 Aboveground Diesel Tank Check for visible signs of water in primary tank Annual

81 Aboveground Diesel Tank Inspection of diesel tank roof. Verify if there are low points or standing water. Annual

82 Aboveground Diesel Tank

Remove deteriorated/corroded painting and paint all exterior shell, heads and roof of diesel tank. The existing painting of the tank is:

- First layer of coat: DEVOE BAR-

RUST 321 EPOXY PRIMER.

Minimum thickness of 3.0 mils

- Second layer of coat: DEVOE

DEVTHANE 379UVA ALIPHATIC

ACRYLIC POLYURETHANE.

Minimum thickness of 3.0 mils

Contractor shall apply second layer to all the exterior shell, heads and roof of diesel tank and the first layer only to the areas where the metal is exposed (corrosion, peeling, sanding). In any case, contractor must sand the surface following the recommendations of the painting manufacturer. Painting shall be the same or compatible to the existing painting.

Contractor shall remove painting using appropriate tools to avoid removing steel from the tank. Contractor shall provide a report to demonstrate the painting has been applied following recommendations of the manufacturer of the painting (humidity, etc.) and include pictures of the measurement of the coating thickness

Annual

83 Aboveground Diesel Tank

Inspection of diesel tank platform. Verify if there are low points or standing water. Annual

84 Aboveground Diesel Tank Containment

Inspection, cleaning and paint tank containment Annual

85 Aboveground Diesel Tank Containment

Inspection, cleaning and paint secondary containment drain Annual

86 Aboveground Diesel Tank Containment

Inspection, cleaning and paint metallic perimeter fence Annual

87 Aboveground Diesel Tank Containment

Inspection, cleaning and paint concrete bollards Annual

88 Aboveground Diesel Tank Containment

Inspection, cleaning and paint concrete walls Annual

89 Aboveground Diesel Tank Containment

Inspection and cleaning of concrete foundations Annual

90 Aboveground Diesel Tank Containment

Inspection, cleaning and paint concrete stairs and handrails to access to tank containment

Annual

91 Aboveground Diesel Tank Containment

Inspection, cleaning and paint emergency stop button and pole Annual

92 Aboveground Diesel Tank Containment

Inspection, cleaning and paint exterior power outlet and pole Annual

93 Aboveground Diesel Tank Containment

Inspection, cleaning and paint concrete box leak storage Annual

94 Aboveground Diesel Tank Containment

Inspection, cleaning and paint concrete box leak storage, metal cover and valves

95 Aboveground Diesel Tank Containment

Check for visible signs of leakage onto surrounding soil Annual

96 Aboveground Diesel Tank Containment

Check for visible signs of leakage into tank containment Annual

97 Aboveground Diesel Tank Containment

Paint applied to tank containment metal structures and others specified in this item 2 shall be epoxy painting approved to apply on steel structures. Contractor must remove deteriorated/corroded old painting and apply new painting. Minimum thickness of 6.0 mils. Painting applied to concrete shall be latex. Colors to be determine by user on site.

Annual

98 Aboveground Diesel Tank Containment

Perform repairs to cracks or failing of concrete found in concrete tank containment

Annual

99 Aboveground Diesel Tank Containment

Provide and replace new signs mounted in the metallic perimeter fence Annual

100 Aboveground Diesel Tank Containment

Inspection and cleaning of pathways and entry into tank containment Annual

101 Aboveground Diesel Tank Attachments Inspection, cleaning and paint of ladders Annual

102 Aboveground Diesel Tank Attachments

Inspection, cleaning and paint of platforms and handrails Annual

103 Aboveground Diesel Tank Attachments

Inspection, cleaning and paint of pipes and attachments (emergency and normal vents, manhole, valves, tank connections, sensors, level and every other device physically connected to the tank).

Annual

104 Aboveground Diesel Tank Attachments

Inspection, cleaning and paint of submersible pumps Annual

105 Aboveground Diesel Tank Attachments

Check for visible signs of leakage in valves, tank drain, tank fill box and tank fill box drain

Annual

106 Aboveground Diesel Tank Attachments

Check operation of liquid level sensing devices Annual

107 Aboveground Diesel Tank Attachments

Check for visible signs of leak in pipe connections Annual

108 Aboveground Diesel Tank Attachments

Check operation of overfill prevention equipment Annual

109 Aboveground Diesel Tank Attachments

Inspect and tight and/or seal tank openings properly Annual

110 Aboveground Diesel Tank Attachments

Check operation of automatic tank gauge system Annual

111 Aboveground Diesel Tank Attachments

Paint applied to tank attachments metal structures and others specified in this item 3 shall be epoxy painting approved to apply on steel structures. Contractor must remove deteriorated/corroded old painting and apply new painting. Minimum thickness of 6.0 mils. Painting applied to concrete shall be latex. Colors to be determine by user on site.

112 Aboveground Diesel Tank Attachments

Check operation of automatic tank gauge system Annual

113 Aboveground Diesel Tank Attachments

Provide and replace suction cartridge filters of submersible pumps Annual

114 Aboveground Diesel Tank Attachments

Provide and replace bearings of submersible pumps motor Annual

115 Aboveground Diesel Tank Attachments

Measure insulation resistance of pump motors Annual

116 Aboveground Diesel Tank Attachments Measure amperage of pumps Annual

117 Panel TBC – Control Of Diesel Fuel Pumps Inspection and cleaning of exterior panel Annual

118 Panel TBC – Control Of Diesel Fuel Pumps Inspection and cleaning of interior panel Annual

119 Panel TBC – Control Of Diesel Fuel Pumps

Inspection and cleaning of interior devices using appropriate dielectric solvent Annual

120 Panel TBC – Control Of Diesel Fuel Pumps

Inspection and tighten of all electrical connections inside the panel Annual

121 Panel TBC – Control Of Diesel Fuel Pumps

Check and install missing labels of wires and breakers Annual

122 Panel TBC – Control Of Diesel Fuel Pumps

Provide and replace new signs and labels mounted in the panels Annual

123 Panel TBC – Control Of Diesel Fuel Pumps

Check and provide missing electrical drawings and/or circuit’s description card in the panels

Annual

124 Panel TCA – Control Of Alarms

Inspection and cleaning of exterior panel Annual

125 Panel TCA – Control Of Alarms Inspection and cleaning of interior panel Annual

126 Panel TCA – Control Of Alarms

Inspection and cleaning of interior devices using appropriate dielectric solvent Annual

127 Panel TCA – Control Of Alarms

Check operation of each contactor and breaker Annual

128 Panel TCA – Control Of Alarms

Inspection and tighten of all electrical connections inside the panel Annual

129 Panel TCA – Control Of Alarms

Check and install missing labels of wires and breakers Annual

130 Panel TCA – Control Of Alarms

Provide and replace new signs and labels mounted in the panels Annual

131 Panel TCA – Control Of Alarms

Check and provide missing electrical drawings and/or circuit’s description card in the panels

Annual

132 Panel TCA – Control Of Alarms

Check operation of PLC and display calibrate if necessary Annual

133 Panel TS550 – Leak Detection System Inspection and cleaning of exterior panel Annual

134 Panel TS550 – Leak Detection System

Inspection and cleaning of interior panel and devices Annual

135 Panel TS550 – Leak Detection System

Inspection and tighten of all electrical connections inside the panel Annual

Panel TS550 – Leak

Detection System

Perform simulation of leak and check operation of leak detection system. Provide a report with results. Leak simulation shall be perform using one submersible pump at a time. Report shall include procedure elaborated to simulate the leak and response of leak detection system.

Annual

Tank Filling System

Simplex– Smartpump With Large Control Box

Inspection and cleaning of exterior panel Annual

Tank Filling System

Simplex– Smartpump With Large Control Box

Inspection and cleaning of interior panel Annual

Tank Filling System

Simplex– Smartpump With Large Control Box

Inspection and cleaning of interior devices using appropriate dielectric solvent Annual

Tank Filling System

Simplex– Smartpump With Large Control Box

Check operation of each contactor and breaker Annual

Tank Filling System

Simplex– Smartpump With Large Control Box

Inspection and tighten of all electrical connections inside the panel Annual

Tank Filling System

Simplex– Smartpump With Large Control Box

Check and install missing labels of wires and breakers Annual

Tank Filling System

Simplex– Smartpump With Large Control Box

Provide and replace new signs and labels mounted in the panels Annual

Tank Filling System

Simplex– Smartpump With Large Control Box

Check and provide missing electrical drawings and/or circuit’s description card in the panels

Annual

Tank Filling System

Simplex– Smartpump With Large Control Box

Check operation of PLC and display calibrate if necessary Annual

146 Cathodic Protection Inspect and check operation of galvanic cathodic protection system, including wiring and connections and rectifier.

Annual

147 Cathodic Protection

Perform testing to cathodic protection: test continuity of pipe, test pipe to soil voltage potential, test voltage output of the anode and measure of the current flow from the anode to the pipe. Provide a report performed by a certified engineer and use calibrated equipment to perform the test

Annual

Emergency Portable Tank And Manual Pump With

Hose

Inspection, cleaning and paint of emergency portable tank Annual

Emergency Portable Tank And Manual Pump With

Hose Perform maintenance to manual pump Annual

150 Grounding System Perform maintenance to all grounding pits (static and dynamic) Annual

151 Grounding System

Perform testing to grounding system using a certified tellurometer. A certified engineer by the college of engineers of Peru shall sign grounding testing report.

Annual

Underground Pull Boxes For Feeders And

Concrete/Steel Boxes For Diesel Fuel Pipes

Inspect and perform general cleaning Annual

Underground Pull Boxes For Feeders And

Concrete/Steel Boxes For Diesel Fuel Pipes

Repair and paint all steel/metal boxes, covers using epoxy painting. Minimum thickness 6.0 mils.

Annual

Diesel Fuel Pipes From

Main Diesel Tank To Day Tanks

Inspect and perform general cleaning Annual

Diesel Fuel Pipes From

Main Diesel Tank To Day Tanks

Repair and paint all steel pipes using epoxy painting. Minimum thickness 6.0 mils Annual

Electrical & Control Wires

From Pain Panels To Devices In Day Tanks

Inspection and cleaning of wires Annual

Electrical & Control Wires

From Pain Panels To Devices In Day Tanks

Measure insulation resistance of wires Annual

Contractor will also include requirements per O&M manuals and any additional requirements not mentioned in this document but required or recommended by manufacturer as preventive maintenance activities to perform quarterly or annually.

DAY TANKS

The contractor shall perform the following preventive maintenance activities on each one of the day tanks:

DAY TANKS – LIMA

Item Sub-system Task Frequency

1 Aboveground Diesel Tank Inspection and cleaning of diesel tank Quarterly

2 Aboveground Diesel Tank Check for visible signs of leakage from tank Quarterly

3 Aboveground Diesel Tank Check for visible signs of water o leakage into interstice of double walled tank Quarterly

4 Aboveground Diesel Tank Check for visible signs of water in primary tank Quarterly

5 Aboveground Diesel Tank

Drain water and other debris accumulated at the bottom of the fuel tanks and disposed of them properly. This will also require draining a small portion of diesel fuel (no more than 2 liters). Contractor must prepare a procedure to perform safely this task without leaking diesel to the surrounding prior to execute the work.

Quarterly

6 Aboveground Diesel Tank Containment

Inspection and cleaning of tank containment Quarterly

7 Aboveground Diesel Tank Containment

Inspection and cleaning of secondary containment drain Quarterly

8 Aboveground Diesel Tank Containment

Inspection and cleaning of pathways and entry into tank containment Quarterly

9 Aboveground Diesel Tank Containment

Inspection and cleaning of concrete foundations Quarterly

10 Aboveground Diesel Tank Containment

Check for visible signs of leakage onto surrounding areas Quarterly

11 Aboveground Diesel Tank Containment

Check for visible signs of leakage into tank containment Quarterly

12 Aboveground Diesel Tank

Inspect and tight and/or seal tank openings properly Quarterly

13 Aboveground Diesel Tank Attachments Check operation of solenoid valves Quarterly

14 Aboveground Diesel Tank Attachments Check operation of level controls Quarterly

15 Aboveground Diesel Tank Attachments Check operation of emergency stop button Quarterly

16 Aboveground Diesel Tank Attachments

Inspection and cleaning of pipes and attachments (emergency and normal vents, manhole, valves, tank connections, sensors, level and every other device physically connected to the tank).

Quarterly

17 Aboveground Diesel Tank Attachments

Check for visible signs of leakage in valves and tank drain Quarterly

18 Aboveground Diesel Tank Attachments

Check operation of liquid level sensing devices Quarterly

19 Aboveground Diesel Tank Attachments

Check for visible signs of leak in pipe connections Quarterly

20 Aboveground Diesel Tank Attachments

Check operation of overfill prevention equipment Quarterly

21 Others Perform inspections to identify areas for repair to the concrete foundations and/or the diesel tanks.

Quarterly

22 Others Check visible signs of leakage from tank Quarterly

23 Others Check visible signs of product leakage into containment Quarterly

24 Others Check visible signs of leakage onto surroundings Quarterly

25 Others Checks signs of product or water into interstice of double-walled tank Quarterly

26 Others Check sign of water in main primary tank Quarterly 27 Others Check valves show signs of fuel leakage Quarterly

28 Others Check operation of liquid level sensing devices Quarterly

29 Others Check that drain openings are liquid tight. Quarterly 30 Others Check the cartridge/filters if applicable Quarterly

31 Others Check valves, accessories and fuel lines, if any dripping of fuel appears Quarterly

32 Others

Verify control cabling is not corroded or in bad shape or deteriorated. Proceed to replace cabling if necessary (cabling from solenoid valves to main electrical panels)

Quarterly

33 Aboveground Diesel Tank Inspection of diesel tank to verify if it is dented, buckled, bulging or cracked Annual

34 Aboveground Diesel Tank Check for visible signs of leakage from tank Annual

35 Aboveground Diesel Tank Check for visible signs of water o leakage into interstice of double walled tank Annual

36 Aboveground Diesel Tank Check for visible signs of water in primary tank Annual

37 Aboveground Diesel Tank Inspection of diesel tank roof. Verify if there are low points or standing water. Annual

38 Aboveground Diesel Tank

Drain water and other debris accumulated at the bottom of the fuel tanks and disposed of them properly. This will also require draining a small portion of diesel fuel (no more than 2 liters). Contractor must prepare a procedure to perform safely this task without leaking diesel to the surrounding prior to execute the work.

Annual

39 Aboveground Diesel Tank

Remove deteriorated/corroded old painting and paint all exterior shell, heads and roof of diesel tank and pipes with epoxy painting approved for steel:

- Minimum thickness of 6.0 mils.

Contractor shall remove deteriorated/corroded painting using appropriate tools to avoid removing steel from the tank.

Contractor shall provide a report to demonstrate the painting has been applied following recommendations of the manufacturer of the painting (humidity, etc.) and include pictures of the measurement of the coating thickness

Annual

40 Aboveground Diesel Tank Containment

Inspection, cleaning and paint tank containment Annual

41 Aboveground Diesel Tank Containment

Inspection and cleaning of pathways and entry into tank containment Annual

42 Aboveground Diesel Tank Containment

Inspection, cleaning and paint concrete walls Annual

43 Aboveground Diesel Tank Containment

Inspection and cleaning of concrete foundations Annual

44 Aboveground Diesel Tank Containment

Check for visible signs of leakage onto surrounding areas Annual

45 Aboveground Diesel Tank Containment

Check for visible signs of leakage into tank containment Annual

46 Aboveground Diesel Tank Containment

Paint applied to tank containment metal structures and others specified in this item 2 shall be epoxy painting approved to apply on steel structures. Contractor must remove deteriorated/corroded old painting and apply new painting. Minimum thickness of 6.0 mils. Painting applied to concrete shall be latex. Colors to be determine by user on site.

47 Aboveground Diesel Tank

Perform repairs to cracks or failing of concrete found in concrete tank containment

Annual

48 Aboveground Diesel Tank Containment

Provide and replace new signs installed in the tank Annual

Aboveground Diesel Tank

Inspection, cleaning and paint of pipes and attachments (emergency and normal vents, manhole, valves, tank connections, sensors, level and every other device physically connected to the tank).

Annual

50 Aboveground Diesel Tank Attachments

Check for visible signs of leakage in valves and tank drain Annual

51 Aboveground Diesel Tank Attachments

Check operation of liquid level sensing devices Annual

52 Aboveground Diesel Tank Attachments

Check for visible signs of leak in pipe connections Annual

53 Aboveground Diesel Tank Attachments

Check operation of overfill prevention equipment Annual

54 Aboveground Diesel Tank Attachments

Inspect and tight and/or seal tank openings properly Annual

55 Aboveground Diesel Tank Attachments

Paint applied to tank attachments metal structures and others specified in this item 3 shall be epoxy painting approved to apply on steel structures. Contractor must remove deteriorated/corroded old painting and apply new painting. Minimum thickness of 6.0 mils. Painting applied to concrete shall be latex. Colors to be determine by user on site.

Annual

56 Aboveground Diesel Tank Attachments Provide and replace filters Annual

57 Aboveground Diesel Tank Attachments

Check operation and calibrate level controls Annual

58 Aboveground Diesel Tank Attachments

Check operation and calibrate solenoid valves Annual

Description of work required in Iquitos and Puerto Maldonado

Day tanks

The contractor shall perform the following preventive maintenance activities on each one of the day tanks:

DAY TANKS – LIMA

Item Sub-system Task Frequency

1 Aboveground Diesel Tank Inspection and cleaning of diesel tank Quarterly

2 Aboveground Diesel Tank Check for visible signs of leakage from tank Quarterly

3 Aboveground Diesel Tank Check for visible signs of water o leakage into interstice of double walled tank Quarterly

4 Aboveground Diesel Tank Check for visible signs of water in primary tank Quarterly

5 Aboveground Diesel Tank

Drain water and other debris accumulated at the bottom of the fuel tanks and disposed of them properly. This will also require draining a small portion of diesel fuel (no more than 2 liters). Contractor must prepare a procedure to perform safely this task without leaking diesel to the surrounding prior to execute the work.

Quarterly

6 Aboveground Diesel Tank Containment

Inspection and cleaning of tank containment Quarterly

7 Aboveground Diesel Tank Containment

Inspection and cleaning of secondary containment drain Quarterly

8 Aboveground Diesel Tank Containment

Inspection and cleaning of pathways and entry into tank containment Quarterly

9 Aboveground Diesel Tank Containment

Inspection and cleaning of concrete foundations Quarterly

10 Aboveground Diesel Tank Containment

Check for visible signs of leakage onto surrounding areas Quarterly

11 Aboveground Diesel Tank Containment

Check for visible signs of leakage into tank containment Quarterly

12 Aboveground Diesel Tank Attachments

Inspect and tight and/or seal tank openings properly Quarterly

13 Aboveground Diesel Tank Attachments Check operation of solenoid valves Quarterly

14 Aboveground Diesel Tank Attachments Check operation of level controls Quarterly

15 Aboveground Diesel Tank Attachments Check operation of emergency stop button Quarterly

16 Aboveground Diesel Tank Attachments

Inspection and cleaning of pipes and attachments (emergency and normal vents, manhole, valves, tank connections, sensors, level and every other device physically connected to the tank).

Quarterly

17 Aboveground Diesel Tank Attachments

Check for visible signs of leakage in valves and tank drain Quarterly

18 Aboveground Diesel Tank Attachments

Check operation of liquid level sensing devices Quarterly

19 Aboveground Diesel Tank Attachments

Check for visible signs of leak in pipe connections Quarterly

20 Aboveground Diesel Tank Attachments

Check operation of overfill prevention equipment Quarterly

21 Others Perform inspections to identify areas for repair to the concrete foundations and/or the diesel tanks.

Quarterly

22 Others Check visible signs of leakage from tank Quarterly

23 Others Check visible signs of product leakage into containment Quarterly

24 Others Check visible signs of leakage onto surroundings Quarterly

25 Others Checks signs of product or water into interstice of double-walled tank Quarterly

26 Others Check sign of water in main primary tank Quarterly 27 Others Check valves show signs of fuel leakage Quarterly

28 Others Check operation of liquid level sensing devices Quarterly

29 Others Check that drain openings are liquid tight. Quarterly 30 Others Check the cartridge/filters if applicable Quarterly

31 Others Check valves, accessories and fuel lines, if any dripping of fuel appears Quarterly

32 Others

Verify control cabling is not corroded or in bad shape or deteriorated. Proceed to replace cabling if necessary (cabling from solenoid valves to main electrical panels)

Quarterly

33 Others Perform a fuel tests for verifying the quality of diesel fuel DB5 Quarterly

34 Aboveground Diesel Tank Inspection of diesel tank to verify if it is dented, buckled, bulging or cracked Annual

35 Aboveground Diesel Tank Check for visible signs of leakage from tank Annual

36 Aboveground Diesel Tank Check for visible signs of water o leakage into interstice of double walled tank Annual

37 Aboveground Diesel Tank Check for visible signs of water in primary tank Annual

38 Aboveground Diesel Tank Inspection of diesel tank roof. Verify if there are low points or standing water. Annual

39 Aboveground Diesel Tank

Drain water and other debris accumulated at the bottom of the fuel tanks and disposed of them properly. This will also require draining a small portion of diesel fuel (no more than 2 liters). Contractor must prepare a procedure to perform safely this task without leaking diesel to the surrounding prior to execute the work.

Annual

40 Aboveground Diesel Tank

Remove deteriorated/corroded old painting and paint all exterior shell, heads and roof of diesel tank and pipes with epoxy painting approved for steel:

- Minimum thickness of 6.0 mils.

Contractor shall remove deteriorated/corroded painting using appropriate tools to avoid removing steel from the tank.

Contractor shall provide a report to demonstrate the painting has been applied following recommendations of the manufacturer of the painting (humidity, etc.) and include pictures of the measurement of the coating thickness

41 Aboveground Diesel Tank Containment

Inspection, cleaning and paint tank containment Annual

42 Aboveground Diesel Tank Containment

Inspection and cleaning of pathways and entry into tank containment Annual

43 Aboveground Diesel Tank Containment

Inspection, cleaning and paint concrete walls Annual

44 Aboveground Diesel Tank Containment

Inspection and cleaning of concrete foundations Annual

45 Aboveground Diesel Tank Containment

Check for visible signs of leakage onto surrounding areas Annual

46 Aboveground Diesel Tank Containment

Check for visible signs of leakage into tank containment Annual

47 Aboveground Diesel Tank Containment

Paint applied to tank containment metal structures and others specified in this item 2 shall be epoxy painting approved to apply on steel structures. Contractor must remove deteriorated/corroded old painting and apply new painting. Minimum thickness of 6.0 mils. Painting applied to concrete shall be latex. Colors to be determine by user on site.

Annual

48 Aboveground Diesel Tank Containment

Perform repairs to cracks or failing of concrete found in concrete tank containment

Annual

49 Aboveground Diesel Tank Containment

Provide and replace new signs installed in the tank Annual

Aboveground Diesel Tank

Inspection, cleaning and paint of pipes and attachments (emergency and normal vents, manhole, valves, tank connections, sensors, level and every other device physically connected to the tank).

Annual

51 Aboveground Diesel Tank Attachments

Check for visible signs of leakage in valves and tank drain Annual

52 Aboveground Diesel Tank Attachments

Check operation of liquid level sensing devices Annual

53 Aboveground Diesel Tank Attachments

Check for visible signs of leak in pipe connections Annual

54 Aboveground Diesel Tank Attachments

Check operation of overfill prevention equipment Annual

55 Aboveground Diesel Tank Attachments

Inspect and tight and/or seal tank openings properly Annual

56 Aboveground Diesel Tank Attachments

Paint applied to tank attachments metal structures and others specified in this item 3 shall be epoxy painting approved to apply on steel structures. Contractor must remove deteriorated/corroded old painting and apply new painting. Minimum thickness of 6.0 mils. Painting applied to concrete shall be latex. Colors to be determine by user on site.

57 Aboveground Diesel Tank Attachments Provide and replace filters Annual

58 Aboveground Diesel Tank Attachments

Check operation and calibrate level controls Annual

59 Aboveground Diesel Tank Attachments

Check operation and calibrate solenoid valves Annual

SPECIAL REQUIREMENTS

Contractor shall elaborate an initial plan for the execution of work in the diesel tank area with special attention to the classified zones by electric risk prior to the beginning of the preventive maintenance activities. Contractor shall avoid the use of tools that could cause a fire in the area of the aboveground diesel tanks. Contractor will not start work unless Facilities Department reviews and approves the initial plan. The initial plan shall include the PPE, materials, description of work with dates and risk associated to the preventive maintenance activities perform by the contractor and ways to mitigate it.

Contractor shall provide diesel fuel DB5 for Iquitos and Puerto Maldonado sites on a quarterly basis as described below:

- 60 gallons of diesel fuel DB5 to fill the day tank of the Generator in Puerto Maldonado site.

- 350 gallons of diesel fuel DB5 to fill the day tank of the Generator in Iquitos site.

ADDITIONAL INFORMATION

ANNEX 1: QUALITY TESTING TO FUEL DIESEL DB5

ANNEX 2: 2020 PREVENTIVE MAINTENANCE TO DIESEL TANKS IN LIMA

ANNEX 3: 2021 PREVENTIVE MAINTENANCE TO DIESEL TANKS IN LIMA

ANNEX 4: MAIN ABOVEGROUND DIESEL TANK DRAWINGS

ANNEX 1

EMBAJADA USA CLIENTE :

FAX:

ORDEN DE TRABAJO :

NÚMERO DE EQUIPO :

LUGAR DE TRABAJO :

MARCA :

MODELO :

NÚMERO DE SERIE :

COMPONENTE :

RUT TRUNCADO :

# CONTROL LAB :

NUMERO DE GARANTIA

EXTENDIDA :

NAMRU-6

TANQUE - DIESEL B5 (S-50)

OTHER

LABORATORIO SOS - LIMA

NAMRU-6

TANQUE_OTHER

Pedro Davila

FONO:

EMBAJADA DE LOS ESTADOS UNIDOS AMERICA

FFECHA DE TERMINO

GARANTIA EXTENDIDA :

FUEL TIPO DE MUESTRA:

TIPO DE FLUIDO :

LIM LA15591

BIODIESEL

Laboratorio S.O.S. Análisis de Fluidos

Av. Industrial 675 - LIMA – PERU www.ferreyros.com.pe

6265197, 6264762 , 6264209

# CONTROL LABORATORIO HORÓMETROFECHA PROCESOFECHA MUESTREO

R080-49141-5015 26-Apr-2019 0

VISCOSIDAD A 40°C EN EL RANGO ACEPTABLE. CONTENIDO DE AZUFRE MENOR A 50 PPM ( 8 PPM ). ¿SEGUN SU HOJA TÉCNICA CUAL ES EL CONTENIDO DE AZIUFRE QUE DEBER TENER SU COMBUSTIBLE?. % BIODIESEL( 5%). GRADO API (36.1 ) EN EL RANGO ACEPTABLE. Lectura de Contador de Particulas Estaria Ligeram/Alto. INSPECCIONAR POSIBLES FUENTES DE CONTAMINACION. Tener en cuenta que el Nivel De Limpieza Recomendado por Caterpillar para maquinas CAT Es 18/16/13.

21-May-2019

Seguimiento

R080-48327-5005 09-Nov-2018 0

NIVEL DE AZUFRE ES MENOR DE 50 PPM. NIVEL DE VISCOSIDAD ESTARIA DENTRO DEL RANGO. COMBUSTIBLE TENDRIA 5% DE BIODIESEL. GRADO API (34.9) ESTARIA DENTRO DEL RANGO.

Se detecta presencia de agua esto imposibilita la prueba de conteo de partículas. PQ indicaría presencia de partículas ferrosas. Se observa presencia de partículas visibles. La presencia de agua causa cavitación, corrosión de piezas. Purgar diariamente agua. Purgar sedimentos. Realizar lavado del tanque y respiradero.

23-Nov-2018

Urgente

R080-48257-5001 12-Sep-2018 0

NIVEL DE AZUFRE ES MENOR DE 50 PPM. NIVEL DE VISCOSIDAD ESTARIA DENTRO DEL RANGO. Lectura del conteo de particulas es lig alto. El nivel de limpieza del combustible recomendado por caterpillar para maquinas CAT es de 18/16/13.

14-Sep-2018

Seguimiento

R080-45268-5015 25-Sep-2015 0

EL COMBUSTIBLE PRESENTARIA UN CONTENIDO DE ASUFRE DE 0.0017%. SERIA UN S50. VISCOSIDAD ESTARIA DENTRO DEL RANGO. LECTURA DEL CONTEO DE PARTICULAS ESTA LIGERAM/ALTO. INSPECCIONAR POSIBLES FUENTES DE CONTAMINACION. EL NIVEL DE LIMPIEZA PARA COMBUSTIBLES RECOMENDADO POR CATERPILLAR ES DE 18/16/13.

25-Sep-2015

Seguimiento

Al Ba B Cd Ca Cr Cu Fe Pb Mg Mn Mo Ni P K Si Ag Na Sn Ti V Zn S SULF

R080-49141-5015 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 8 8

R080-48327-5005 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 15 15

R080-48257-5001 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14 14

R080-45268-5015 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 17

W V40 ISO PQI 4µ 6µ 10µ 14µ 18µ 21µ 38µ 50µ Biodiesel API Gravity

R080-49141-5015 N 3.4 19/17/14 37 3059 890 273 139 73 24 6 0 5.00 36.1

R080-48327-5005 P 3.4 62 5.00 34.9

R080-48257-5001 N 3.0 19/17/13 40 4568 1102 178 47 20 14 3 1 5.00 36.2

R080-45268-5015 N 2.0 21/19/16 41 12712 4286 1029 391 143 76 5 2

Prueba de combustible

Elementos de desgaste (ppm)

Ag = Plata, Al = Aluminio, B = Boro, Ca = Calcio, Cr = Cromo, Cu = Cobre, Fe = Hierro, P = Fósforo, K = Potasio, Mg = Magnesio, Mo04 or Moly = Molibdeno, Na = Sodio, Ni = Níquel, Pb = Plomo, S = Azufre, Si = Silicio, Sn = Estaño, Ti = Titanio, Zn = Zinc, A = Anticongelante, F = Combustible, W = Agua, P = Positivo, N = Negativo, E = Excesivo, NIT = Nitración, OXI = Oxidación, ST = Hollín, SUL = Sulfatación, ISO = Nivel de limpieza, PVI = Indicador de Volumen de Partículas, PQI = Indice de Quantificador de Partícula , NaW = Agua salada, FL Pt = Punto álgido, TAN = Número Total Acido, TBN = Número Total Básico, H2O = Karl Fisher, V100 = Viscosidad a100C, V40 = Viscosidad a 40C, VI = Indice de Viscosidad

Nota: El propósito de este análisis es únicamente para detectar desgastes mecánicos. No debe entenderse como garantía expresa o implícita de que no ocurra una falla del equipo o alguno de sus componentes.

ANNEX 2

INFORME Código SER-INF-2020-005

MANTENIMIENTO PREVENTIVO DEL SISTEMA DE

ALMACENAMIENTO DE COMBUSTIBLE DB-S50

NAMRU 6 – CENTRO MEDICO NAVAL

Fecha de aprobación 17.11.2020

Versión 01 Página 1 de 9 Elaborado SERMECO SRL

SER-INF-2020-008

MANTENIMIENTO PREVENTIVO DEL

SISTEMA DE ALMACENAMIENTO DE

COMBUSTIBLE DB-S50

NAMRU 6 – CENTRO MEDICO NAVAL

Orden de Compra#: N4485220P0136

ALMACENAMIENTO DE COMBUSTIBLE DB-S50

NAMRU 6 – CENTRO MEDICO NAVAL

Fecha de aprobación 17.11.2020

Versión 01

Página 2 de 9

Elaborado SERMECO SRL

ÍNDICE

1. OBJETIVO

2. EJECUCION DEL SERVICIO

ACTIVIDADES PREVIAS

MANTENIMIENTO PREVENTIVO DE EQUIPOS DEL SISTEMA DE COMBUSTIBLE

3. RECOMENDACIONES

4. RECURSOS UTILIZADOS

PERSONAL

EQUIPOS

EQUIPOS DE PROTECCION PERSONAL

5. FECHA REALIZADA EL TRABAJO

6. REPORTE FOTOGRAFICO

NAMRU 6 – CENTRO MEDICO NAVAL

Fecha de aprobación 17.11.2020

Versión 01

Página 3 de 9

1. OBJETIVO

Este documento tiene la intención de describir los trabajos realizados en el Mantenimiento Preventivo del Sistema de almacenamiento de combustible DB-S50 ubicado en las instalaciones de la entidad NAMRU 6 en el distrito de Bellavista - Callao.

2. EJECUCION DEL SERVICIO

ACTIVIDADES PREVIAS

• Se hicieron las coordinaciones con el personal encargado de la supervisión del trabajo, para el cual se solicito el permiso para el inicio de las actividades, verificando la utilización de todos los implementos de seguridad y herramientas a utilizar.

MANTENIMIENTO PREVENTIVO DE EQUIPOS DEL SISTEMA DE COMBUSTIBLE

Se realizaron los siguientes trabajos:

Área de Tanque Principal de 8,000 galones

Limpieza de cerco metálico Limpieza de postes de defensa Limpieza de baranda metálica de tanque principal Limpieza de plataforma metálica de tanque principal Limpieza de escalera y guarda hombre de tanque principal Limpieza de tablero simplex, cajuela de derrame de llenado Limpieza de tuberías de combustible ubicado en lomo de tanque, dique de tanque, manifold y buzón de empalmes Limpieza de cajuela de manifold Limpieza de muro perimetral de concreto del dique Limpieza de baranda de ingreso a dique Limpieza de poste de pulsador de parada de emergencia Limpieza de murete de tomacorriente Mantenimiento y limpieza de tanque principal Mantenimiento y limpieza de canaleta de drenaje, cajuela y rejilla del sistema de drenaje del dique Mantenimiento y limpieza de buzones eléctricos Mantenimiento y limpieza de bombas sumergibles

Área de tanques diarios

Limpieza de tanque diario G.E Limpieza de tuberías de combustible G.E Limpieza de tanque diario HVAC Limpieza de tuberías de combustible HVAC Limpieza de tanque diario Boiller Limpieza de tuberías de combustible Boiller Verificación y limpieza de filtro de combustible Limpieza de estanco de concreto de tanque diario

Área de tableros

Tablero TBC (Tablero de bombas de combustibles)

Limpieza y reajuste de borneras y terminales de cables

NAMRU 6 – CENTRO MEDICO NAVAL

Fecha de aprobación 17.11.2020

Versión 01

Página 4 de 9

Limpieza interna y externa de cajuela de tablero eléctrico

Tablero TCA (Tablero control de alarmas)

Tablero TDF (Tablero de control de fugas)

Tablero Simplex (Electrobomba)

3. RECOMENDACIONES

• Se debe realizar el pintado de las partes metálicas del sistema de almacenamiento de combustible (malla perimetral, tanque, tuberías, pernos, plataforma, escaleras y otros)

• Es necesario reemplazar los letreros de señalización ubicados en el área de almacenamiento, los actuales se encuentran deteriorados.

• Reemplazar tapones metálicos del tanque principal que se encuentran deterioradas.

• Cambio de control de nivel del tanque diario del grupo electrógeno.

• Reparación del Sistema de control automático de combustible, el cual no se encuentra operativo.

• Calibración de tablero Simplex y medidos electrónicos del tanque principal.

4. RECURSOS UTILIZADOS

PERSONAL

• 01 Supervisor

• 02 Operarios

EQUIPOS

• Comprensora eléctrica

• Equipo de medición de amperaje y voltaje

• Llaves stilson

• Llave francesa

• Bandeja antiderrame

• Desarmador plano y estrella

• Disolvente dieléctrico

• Grasa lubricante

• Escobas

• Trapo industrial

NAMRU 6 – CENTRO MEDICO NAVAL

Fecha de aprobación 17.11.2020

Versión 01

Página 5 de 9

• Solventes industriales.

• Lija fina al agua

• Limpiador abrillantador de acero inoxidable.

EQUIPOS DE PROTECCION PERSONAL

• Cascos de seguridad

• Botas de cuero c/punta de acero.

• Lentes de seguridad claros.

• Respirador para vapores.

• Chaleco con cintas reflectantes.

• Guantes de Cuero o badana

• Uniforme

5. FECHA REALIZADA EL TRABAJO

Del 28 de Octubre al 13 de Noviembre del…