W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 012 Fire Protection System.pdf
PDF 3 MB Posted
- Solicitation number
- W9127822R0005
About this file
This federal contract opportunity solicitation seeks operation and maintenance services for the US Navy Medical Research Unit Six facilities in Peru. Requirements include preventative, predictive, demand, and emergency maintenance of architectural, mechanical, electrical, and instrumentation systems at medical research laboratories, vivarium facilities, administrative spaces, and supporting structures and utilities in Lima and satellite locations. Services must be provided continuously 24/7. The firm-fixed-price contract will include a base year and four option years. Offerors must check the https://sam.gov/ website for solicitation details and changes, as the solicitation will only be issued as a direct download and not in paper format. The NAICS code is 561210 with a $41.5 million size standard. Defense Base Act insurance will be required as applicable.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD OPERATING PROCEDURE (SOP) – ANNUAL PREVENTIVE
MAINTENANCE ACTIVITIES TO FIRE PROTECTION SYSTEM IN LIMA SITE
General Requirements for Lima
The fire protection system of NAMRU-6 Lima is composed of an electric fire pump and a jockey pump, fire pipe lines, valves, manometers, etc. The fire pump and jockey pump are located inside a pump house built underground. A picture of the fire pump and jockey as well as specifications of each equipment can be found below:
Fire pump and jockey pump
FIRE PUMP DATA PLATE
» BRAND N. AURORA, IL
» TYPE 4 – 492 – 18
» SERIAL NO. 09 – 1783254
» G.P.M 500 » AT 115 PSI » R.P.M 1770
» P.S.I AT 150% 111.5 B.H.P 63 STAGES ONE
» MAX. PRESS 129 P.S.I
» MAX. B.H.P 80 AT MAX. SUCT. PSI 46
» IMP. DIA 16.690
Section J - Exhibit 11.2.2 SOP-FAC 012
JOCKEY PUMP DATA
Brand BALDOR RELIANCE Cat No. M11619 Spec. 35U302 – 0373C1
HP 2
Volts 208 – 230 / 460 Amps 5.9 – 5.6 / 2.8
RPM 3450
Frame 56CZ Hz 60 PH 3 SER. F. 1.15 Code H DES B CLASS B NEMA Nom. EFF 81.5 % PF 89 % Rating 40C AMB – CONT Cc Usable AT 208V 5.9 A Bearings DE 6205 ODE 6203 Encl. Open SN F0803044111
ELECTRICAL MOTOR PLATE DATA
BRAND WEG
PH 3 » HP 75(55) » Frame 364/5T V 230 / 460 » RPM 1780 » Hz 60
A 171 / 85.3 » » SF 1.15
Usable at 208V 189 A 50Hz CV2HP 380V 102A 1465RPM SF1.0
CONTROL DATA OF THE MAIN PUMP
Brand Metron Model No. MP430 – 75 – 240C MTS Serial No. NA – 09N40352 – 11 Electrical Rating 75 HP 240 VOLTS 3 PHASE 60 HZ
Suitable for use on a circuit capable of delivering not more than 100,000 RMS symmetrical amperes at 240 volts max.
Maximum operating pressure: 300 PSI To be used where temperature is not less than 40ºF(4.4ºC)
Enclosure – Environmental type 4
CONTROL DATA OF THE JOCKEY PUMP
Brand Metron Model No. M15B – 2 – 240 Serial No. HK – 09N40352 – 21
» 2 HP 240 VOLTS 30 AMPS 3 PHASE 60 HZ
Contractor shall provide the names and certification of the technicians performing preventive maintenance tasks. Only qualified technicians shall perform preventive and corrective maintenance tasks. Only qualified and trained personnel in maintenance and operation of fire protection systems who will have current insurance policy (known also as SCTR) and in compliance with local occupational health and safety laws and protocols can perform work at NAMRU-6 sites.
Contractor shall perform periodic preventive maintenance activities to all of the equipment specified in this document. It is the responsibility of the contractor to perform a full inspection of the systems and collect all required information to provide a quality preventive maintenance. In addition, contractor shall review operation manuals for the equipment of the systems under this contract and include any recommended preventive maintenance activities by the manufacturer not mentioned in this document. It is also the responsibility of the contractor to verify the quantity of all the devices listed that compose the fire alarm system in Lima and Iquitos. The charts provided above are only for reference.
Contractor shall elaborate, review and update the drawings in AUTOCAD of the fire protection system in Lima and Iquitos on an annual basis.
Contractor shall include all materials, tools and personal protective equipment necessary to perform preventive and corrective maintenance work. Contractor must use the necessary and appropriate equipment to delimit the work area and not allow the pedestrian traffic. The contractor’s staff shall use the appropriate PPE for the activity to perform. NAMRU-6 will not provide any materials, tools nor PPE to the contractor to perform their work. The underground vault where the fire pump is located is designated as a “confined space” by NAMRU-6 safety department. Contractor shall follow safe procedures related to “permit requirements for confined spaces”.
The contractor shall provide a weekly progress report to the NAMRU-6 facilities department, as well as a completion report when completing the maintenance work to include: activities performed with pictures, recommendations, conclusion and future needed corrective maintenance tasks. When a corrective maintenance work is required, the contractor shall submit a report detailing the problem encountered, with a quotation of the solution. All reports shall be performed and signed by a certified NFPA inspector in fire alarm systems.
The preventive maintenance work will be coordinated between NAMRU-6 facilities staff and the staff assigned by the contractor.
Contractor shall perform operational testing of the systems at the completion of each preventive maintenance work. NAMRU-6 facilities department will assign a staff to participate in the operational testing and contractor shall prepare an operational testing form (checklist) to be signed by the facilities staff once testing is perform and accepted.
It is the responsibility of the contractor to dispose properly out of NAMRU-6 facilities all consumable materials and garbage generated by the contractor during the performance of the maintenance activities.
Applicable codes:
The following are applicable codes for the elaboration of the preventive maintenance plan, reports and activities mentioned in this document:
NFPA 20
NFPA 25
NFPA 72
NFPA 77
NFPA 70
NEC
Peruvian National Electrical Code 2006 IEEE Standards Peruvian Building Code 2006 (RNE) IEC – International Electrotechnical Commission Local codes and regulations
Description of work required in Lima and Iquitos
The contractor shall perform the following preventive maintenance activities to the fire alarm systems in NAMRU-6 Lima and Iquitos:
Fire Alarm Systems – Lima and Iquitos Item Sub-system Task Frequency
1 Fire pump
Inspection and testing of fire pump system. Contractor shall check condition of alarms and simulate alarm incidents to check for proper operation of alarms.
Contractor shall follow requirements for monthly testing in NFPA 20 & NFPA 25.
Monthly
2 Fire pump Visual inspection to all devices in fire pump house. Monthly
3 Fire pump Provide a report of the testing and inspection performed Monthly
4 Fire pump and jockey pump
Perform annual preventive maintenance following the specifications of the operation manuals, recommendations of manufacturer and the requirements of
NFPA 20 & 25.
Annual
5 Fire pump and jockey pump
Clean all electrical devices and connections inside the control board of the main pump, jockey pump and any other external electrical connections
Annual
6 Fire pump and jockey pump Perform visual inspection of equipment and accessories Annual
7 Fire pump and jockey pump Perform general inspection to the fire pump installation, suction, manometer, Annual discharge, relief valve, pressure line, metallic supports, etc.
8 Fire pump and jockey pump Inspection to packing and packing seal box of pump Annual
9 Fire pump and jockey pump Check tighten of all mechanical and electrical connections in general. Thigh if necessary.
Annual
10 Fire pump and jockey pump Lubricate bearings Annual
11 Fire pump and jockey pump Inspection to fire pump room valves and piping Annual
12 Fire pump and jockey pump Check alignment of flexible couple, lubricate if necessary. Annual
13 Fire pump and jockey pump Lubricate centrifugal pump shaft if necessary Annual
14 Fire pump and jockey pump Check the operation of the electric pump Annual 15 Fire pump and jockey pump Measure parameters of electric motor Annual
16 Fire pump and jockey pump Clean electric panel board and components Annual
17 Fire pump and jockey pump Check status of fuse and replace if necessary Annual
18 Fire pump and jockey pump Clean drain pipes and purge air valve Annual
19 Fire pump and jockey pump Inspection to relief valve and tight pipes and accessories Annual
20 Fire pump and jockey pump Inspection and cleaning to all electrical panel in fire pump room Annual
21 Fire pump and jockey pump Inspection of manometers. Check calibration and replace if necessary. Annual
22 Fire pump and jockey pump Measure insulation resistance of the motors of the fire pump and jockey pump Annual
23 Fire pump and jockey pump Check manual and automatic operation of pump from controller Annual
24 Fire pump and jockey pump Check starting pressure and shut down of pump Annual
25 Fire pump and jockey pump Check each one of the alarms of the controller Annual
26 Fire pump and jockey pump Check piping conditions and repair/paint if necessary. Color and painting shall be similar to existing.
Annual
27 Fire pump and jockey pump
Perform testing of performance of the pump, Flow vs Pressure vs Velocity.
Provide a chart of the fire pump performance curve at 0, 50%, 100% and 150% of rated capacity.
Annual
28 Fire pump and jockey pump Provide a full report of all the maintenance activities performed following NFPA 20 & 25 and manufacturer recommendations.
Annual
29 Fire pump and jockey pump Provide a certificate of operation valid for a year and signed by a NFPA certified inspector.
Annual
30 Fire pump and jockey pump Replace and calibrate all manometers in fire pump room (approximately 7) Annual
31 Fire pump and jockey pump
Perform vibration analysis. Provide a report showing and explaining the results.
Recommend corrections based on the report.
Annual
Fire water line pipes and related accessories (sprinklers, valves, etc.)
Perform visual inspection to pipes and all accessories. Annual
Fire water line pipes and related accessories (sprinklers, valves, etc.)
Check and clean all sprinklers Annual
Fire water line pipes and related accessories (sprinklers, valves, etc.)
Check and clean fire water line pipes.
Remove rust and paint if necessary.
Painting must be similar color and quality to the existing.
Annual
Fire water line pipes and related accessories (sprinklers, valves, etc.)
Check and clean manifold Annual
Fire water line pipes and related accessories (sprinklers, valves, etc.)
Check and clean valves Annual
Fire water line pipes and related accessories (sprinklers, valves, etc.)
Perform static and dynamic pressure simulating the worst-case scenario (furthest point of connection).
Annual
Fire water line pipes and related accessories (sprinklers, valves, etc.)
Check and clean manometers, calibrate and replace if necessary. Manometers must be UL and calibrated.
Annual
39 Fire pump room Visual inspection to access metal stairs and metal door/grill. Remove dust and paint if necessary.
Annual
40 Fire pump cistern Check operation of the level sensor of cistern. Replace if necessary. Annual
Contractor shall also include requirements per O&M manuals and any additional requirements not mentioned in this document but required or recommended by manufacturer as preventive maintenance activities to perform quarterly or annually at all sites.
SPECIAL REQUIREMENTS
Contractor shall provide a certificate of the operation of the fire protection system valid for one year after performing maintenance and testing of the fire pumps following NFPA procedures.
Certificate has to be prepared and signed by a certified NFPA inspector.
ADDITIONAL INFORMATION
ANNEX 1: 2021 PREVENTIVE MAINTENANCE TO FIRE PROTECTION SYSTEM IN LIMA
ANNEX 2: 2021 MONTHLY INSPECTION REPORT TO FIRE PROTECTION SYSTEM IN LIMA
ANNEX 3: REPORT OF INSULATION RESISTANCE TESTING TO FIRE PUMPS
ANNEX 4: REPORT OF VIBRATION ANALYSIS 2019
ANNEX 5: CERTIFICATE OF OPERATION OF FIRE PUMP AND OTHER RELATED
EQUIPMENT 2019-2020
ANNEX 1
F P
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
Jr. Las Balsas 208 Urb. San Juan Bautista de Villa Chorrillos - Lima
Teléfono: (+51) (1) 665 3666 www.3fp.biz
EMBAJADA USA NAMRU
INFORME TÉCNICO
Mantenimiento Preventivo de SCI
ELECTRICA
16/04/21
Referencia: N4485220P0141
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
Jr. Las Balsas 208 Urb. San Juan Bautista de Villa Chorrillos - Lima
Teléfono: (+51) (1) 665 3666 www.3fp.biz
ON JOC-20-069
1). BCI PRINCIPAL
INSTALACION DESCRIPCION REV. COMENTARIOS
Succión:
Valvula OSY .
Coplas ran. .
Plato Vortex .
Soportería No es visible
Descarga
Válvula Check .
Válvula OS&Y / Mariposa .
Coplas ranuradas .
Soportería
Linea de Prueba
Válvula Mariposa .
Medidor de flujo
Coplas ran. .
Soportería .
Válvula de Alivio
Válvula de alivio .
Waste cone .
Soportería .
Cuarto de BCI
Cerramiento .
Drenajes .
Tablero de Dsitribución electrica .
Sistema de bombeo eléctrico contra incendios CLIENTE
EMBAJADA USA
NAMRU
Informe de Mantenimiento Prevéntivo. Fecha 16/04/21
Bomba Marca: Aurora Modelo: 4-492-18 Serie: 09-1783254
Motor Modelo: 075180P3EFP365T Serie: 1030547953
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
Jr. Las Balsas 208 Urb. San Juan Bautista de Villa Chorrillos - Lima
Teléfono: (+51) (1) 665 3666 www.3fp.biz
DESCRIPCION REV COMENTARIOS
BOMBA Operativo.
Manómetro Descarga Operativo ( Calibrar ).
Mano vacuómetro Operativo ( Calibrar ).
Caja de estopas Se cambio por nuevo.
Drenajes de estopas Se cambio 01 drenaje por rotura de tubería, se coloco de pvc.
Eliminador de Aire Se realizo mantenimiento.
Bocina de eje Operativo.
Pernos .
Rodamientos Se engraso.
DESCRIPCION REV COMENTARIOS
MOTOR
Inspección General
Conexiones eléctricas .
Conexión a tierra Presenta.
Aislamiento L1: 266 L2: 255 L3: 270 L4: 269 L5: 268 L6: 261 MΩ
Estado Normal.
Alineamiento Verificado.
Acople Operativo.
Guarda acople .
PLACA
BASE DEL
MOTOR
Soportes .
Pernos y anclajes .
TABLERO
PRINCIPAL
CI
Gabinete .
Interruptor Principal .
Selector Modo Apagado
Controlador en Auto .
Interloock .
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
Jr. Las Balsas 208 Urb. San Juan Bautista de Villa Chorrillos - Lima
Teléfono: (+51) (1) 665 3666 www.3fp.biz contactores de arranque Se realizo mantenimiento.
Troides .
Palanca de arranque de Emergencia
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
Jr. Las Balsas 208 Urb. San Juan Bautista de Villa Chorrillos - Lima
Teléfono: (+51) (1) 665 3666 www.3fp.biz
S-C-I JOCKEY
Marca Pentair Modelo PVM2-80 Serie 1804739-20
DESCRIPCION
REV
COMENTARIOS
Succión: Válvula OS&Y .
Descarga Válvula Check .
Válvula Descarga Válvula OS&Y .
Válvula de Alivio Válvula Alivio .
EQUIPO DE BOMBEO ELÉCTRICO
Bomba Centrifuga Tipo Turbina Regenerativa tipo acople directo (no tiene acoplamiento)
BOMBA
BOMBA Operativo
Manómetro Desc. .
Sello mecánico .
Pernos .
Motor Eléctrico Tipo ODP
Marca Baldor Modelo M11619 Serie F0803044111
DESCRIPCION REV. COMENTARIOS
MOTOR
Carcaza Externa .
Aislamiento L1: 795 L2: 762 L3: 706 MΩ
Conexión a tierra Presenta.
Calentamiento Normal.
Consumos de amperaje L1: 4.6 L2: 4.5 L3: 4.2 Amp.
Ruido Normal.
Tablero Controlador Jockey Tipo
Marca Metron Modelo M15B-2-240 Serie HK-09N40352-21
DESCRIPCION REV. COMENTARIOS
CONTROLADOR
JOCKEY
Gabinete .
Sistema eléctrico de control .
Sistema eléctrico de Mando .
Ajuste de Terminales Se realizo.
Limpieza Se realizo.
Interruptores de conexión con fusibles
Operativo.
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
Jr. Las Balsas 208 Urb. San Juan Bautista de Villa Chorrillos - Lima
Teléfono: (+51) (1) 665 3666 www.3fp.biz
Mantenimiento de Contactor Se realizo mantenimiento.
Switch de presión Operativo.
Funcionamiento Manual Se realizo.
Funcionamiento Automático Se realizo.
Deshumedecedor No presenta.
2). BOMBA JOCKEY
Línea sensora de presión de Controlador Jockey
DESCRIPCION REV. COMENTARIOS
LINEA DE
SENSADO BOMBA
JOCKEY
Check orificio 1/2" .
Válvula Bola .
Tubería de cobre .
Manómetro Operativo ( Calibrar ).
Soportería .
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
Jr. Las Balsas 208 Urb. San Juan Bautista de Villa Chorrillos - Lima
Teléfono: (+51) (1) 665 3666 www.3fp.biz
ARRANQUE BOMBA PRINCIPAL 95 PSI
APAGADO BOMBA PRINCIPAL MANUAL.
ARRANQUE BOMBA JOCKEY 120 PSI
APAGADO BOMBA JOCKEY 130 PSI
SETEO DE FORMA DE APAGADO AUTOMÁTICO.
SETEO VALVULA DE ALIVIO PRINCIPAL 130 PSI
ARRANQUE MANUAL ✔
APAGADO MANUAL ✔
PRESION REFRIGERACION N/A
HOROMETRO INICIO: N/A FIN: N/A
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
Jr. Las Balsas 208 Urb. San Juan Bautista de Villa Chorrillos - Lima
Teléfono: (+51) (1) 665 3666 www.3fp.biz
OBSERVACIONES
- Tablero Metron presenta lectura errónea (Cambiar).
- Bomba sumergible del pozo sumidero requiere mantenimiento y cambio de componentes internos (preventivo).
- Bomba sumergible no activa las boyas, el tablero que presenta no cuenta con selectores de encendido manual o automático ni led de encendido de energizado o falla, se realizó un encendido directo desde el contactor y se noto presencia de humo del tablero (Cambiar).
- Línea de descarga de bomba sumergible se regresa el flujo
(Cambiar válvula check).
RECOMENDACIONES
- Realizar pruebas mensuales por 10 minutos bajo norma NFPA.
- Se recomienda hacer un mantenimiento a las válvulas ossy de succión, presenta un goteo mínimo por los prensaestopas (se realizó un ajuste y dejo de gotear).
- Cambiar el tablero Metron por uno de características más funcionales actuales, para lo cual se alcanzará cotización.
CONCLUSIONES
- El equipo queda operativo y en automático.
- Curva de performance esta dentro de los valores bajo NFPA.
F P ire rotection luid umps iltering rocess
PRUEBAS DE FLUJO
SERIE: 09-1783254 FECHA 17/04/2021
CAUDAL
PRESIÓN
SUCCIÓN
PRESIÓN
DESCARGA
PRESIÓN
NETA
PRESION ( DATOS
DE PLACA )
CAUDAL
CORREGIDO
PRESIÓN
CORREGIDA
VARIACIÓN
GPM PSI PSI PSI PSI GPM PSI %
0 0 4 131 1790 127 129.00 0.00 124.18 -3.74
500 100 3 120 1786 117 115.00 495.52 114.91 -0.08
750 150 2 110 1771 108 111.50 749.58 107.88 -3.25
CURVA COMPARATIVA - BOMBA CONTRA INCENDIOS
PROYECTO
AURORA PUMP
ENBAJADA U.S.A - NAMRU
RPM DE FABRICA 1770
NOMINAL
RPM
BOMBA CONTRA INCENDIOS
N°
PRUEBA
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
0 100 200 300 400 500 600 700 800
Fabrica Prueba de campo
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
Jr. Las Balsas 208 Urb. San Juan Bautista de Villa Chorrillos - Lima
Teléfono: (+51) (1) 665 3666 www.3fp.biz
Registro Fotográfico
Limpieza de bocina externa Mantenimiento a prensa estopas.
Verificación de alineamiento Cambio de cordón de estopas.
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
Jr. Las Balsas 208 Urb. San Juan Bautista de Villa Chorrillos - Lima
Teléfono: (+51) (1) 665 3666
Mantenimiento a eliminadora Obstrucción a tapa de eliminador de aire. de aire.
Megado de motor principal. Megado de motor jockey.
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
Jr. Las Balsas 208 Urb. San Juan Bautista de Villa Chorrillos - Lima
Mantenimiento de contactor Mantenimiento de contactor de tablero principal. jockey.
Engrasado de rodajes. Cambio de grasa en válvulas.
ANNEX 2
ANNEX 3
F P ire rotection luid umps
INFORME TÉCNICO
NAMRU - 6
30-05-2018
Referencia: INF18-VVM-115
OBJETIVO.
Megado de cables que alimentan la línea contra incendios.
ANTECEDENTE.
Este Trabajo se realizó porque durante las pruebas de funcionamiento de la bomba contra incendios se encontró que existía una diferencia de aproximadamente 20 amperios entre la línea 01 y 03 cuando la bomba funcionaba al 150%
DETALLE DE ACTIVIDADES.
Debido a que el tiempo de corte de energía eléctrica tiene un máximo de 90 minutos, se procedió a dividir el trabajo en dos días, el primero fue ubicar el lugar exacto de donde salía las líneas de alimentación hacia el tablero metron y el segundo día a realizar las medidas correspondientes.
TRABAJOS REALIZADOS
- El día 01 se realizo el corte programado y luego de revisar los tableros se encontró que la conexión está directamente a las barras de alimentación eléctrica, es decir no hay ninguna llave que pueda independizar un posible corte al tablero.
Cables encontrados que están conectados directamente a las barras de alimentación
Las líneas de alimentación contra incendios son las que están en la parte posterior a las placas de cobre
- El día 02 se realizó el megado y los resultados están en el siguiente protocolo.
REGISTRO 3FP SAC.
CONTROL DE CALIDAD Revisión : 1
PRUEBAS ELECTRICAS DE CONDUCTORES & CIRCUITOS
ELECTRICOS
Fecha : 20/05/18 Página : 1 de 1
CODIGO Y NOMBRE DEL PROYECTO: Naval Medical Research Unit No. 6 N˚ CORRELATIVO:
CLIENTE : Naval Medical Research Unit No. 6 FECHA: 20/05/2018 DIRECCIÓN : Av. Venezuela Cuadra 36 S/N - Hospital Naval – Callao
TRAMO : TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA HACIA TABLERO DE BOMBA CONTRA INCENDIOS DESCRIPCIÓN : MEGADO DE CABLES DE LINEA QUE ALIMENTA AL TABLERO DE LA BOMBA CONTRA INCENDIOS.
GENERALES
N˚de conductores : 03 + 01T Calibre (AWG): Voltaje Nominal de Funcionamiento (VAC):230
INFORMACION DE LA PRUEBA
EQUIPO DE PRUEBA
Medición de Continuidad: Instrumento : PINZA AMPERIMETRICA
Marca : FLUKE Modelo : 376 FC S/N 37910015W8
Medición de Aislamiento Instrumento : MEGOMETRO
Marca : FLUKE Modelo : 1507 S/N 16070331
MEDICIÓN DE RESISTENCIA DE CONTINUIDAD Y AISLAMIENTO DE CIRCUITOS
Voltaje de Prueba(V): 500 VAC Tiempo de Aplicación (min): 1
IDENTIFICACIÓN MEDICIONES
FASE ID COLOR PARAMETRO L1 L2 L3 N/Sh GND Conforme L1
A,X,R,U,R AZUL Continuidad (Ω) OK - - - - OK
Aislamiento (MΩ)
550 MΩ 550 MΩ - 550 MΩ OK
L2 B,Y,S,V,W
NEGRO Continuidad (Ω) OK - - OK
550 MΩ - 319 MΩ OK
L3 C,Z,T,W,B
ROJO Continuidad (Ω) OK - OK
- 550 MΩ OK
NEUTRO Continuidad (Ω) - - -
Aislamiento (MΩ) - -
OBSERVACIONES
Se concluye que no hay perdida de aislamiento debido a que los valores están dentro de los rangos esperados
REPRESENTANTE DE NAMRU REPRESENTANTE 3FP SAC
Firma:
Firma:
Cargo: Cargo: SUPERVISOR DEPARTAMENTO CONTRA INCENDIOS Nombre: Nombre: VICTOR VILLACREZ MESTANZA Fecha: Fecha: 20-05-2018
Luego de las medidas se reconecto, se realizaron los ajustes necesarios y nuevamente se probó la bomba contra incendios donde se encontró que la diferencia de amperajes no sobre pasaba los 10 amperios
CONCLUSION
- No existe perdida de aislamiento en los cables de alimentación del sistema conra incendios
- La explicación de la mejora en el amperaje es por que se ajusto el empalme del cable con con las placas de cobre.
- El panel de lectura del tablero metron da lecturas erróneas, superando los 30 amperios de desface de amperaje.
RECOMENDACIÓN.
- Cambiar panel de lectura y toroides del tablero para no tener lecturas erróneas de amperaje.
- Colocar llave térmica en el tablero de distribución para poder realizar mantenimiento, esta debe tener una capacidad de 6 veces el amperaje del motor.
Atentamente
Ing. Victor Villacrez M.
Supervisor Dpto Contra Incendios
3FP SAC.
ANNEX 4
Jr. Las Balsas N° 208 Urb. San Juan Bautista de Villa - Chorrillos
Teléfono: (+51)(1) 665 3666 www.3fp.biz
F P F P
F P ire ro te c t io n lu id u mp s ilte rin g ro c e ss
EMBAJADA USA - NAMRU
INFORME DE CAMBIO DE
ACOPLE DE
ELECTROBOMBA
CONTRAINCENDIO
INFORME ELABORADO
POR:
3FP SAC
Lima 04 de noviembre 2019
F P ire rotection luid umps http://www.3fp.biz/ www.3fp.biz
F P F P
F P ire ro te c t io n
INDICE
I. GENERALIDADES
1.1. Antecedentes
1.2. Objetivo
II. ACTIVIDADES REALIZADAS
III. SITUACION ENCONTRADA
IV. OBSERVACIONES
V. RECOMENDACIONES
VI. CONCLUSIONES
www.3fp.biz
F P F P
F P ire ro te c t io n
INFORME DEL ACOPLE SISTEMA CONTRAINCENDIO
I. GENERALIDADES
1.1 Antecedentes
La Empresa NAMRU entra en contacto con nuestra empresa 3FP S.A.C, para realizar el Servicio de cambio de acople y alineamiento de electrobomba contra incendio. Al término del servicio se enviará un Informe por los trabajos realizados.
El cliente en conformidad de lo informado envía orden de servicio.
1.2 Objetivo
➢ Cambio de acople de motor y bomba
➢ Dejar equipo operativo y en buenas condiciones.
II. ACTIVIDADES A REALIZAR
El presente informe da cuenta de las actividades y ocurrencias desarrolladas durante el servicio:
❖ Realizar los permisos correspondientes para poner inoperativo el equipo.
❖ Inspección visual de electrobomba.
❖ Cambio de acople de electrobomba.
❖ Alineamiento con láser.
❖ Análisis vibracional de electrobomba.
❖ Verificación de giro de la electrobomba en el sentido correcto.
❖ Pruebas del buen funcionamiento.
www.3fp.biz
F P F P
F P ire ro te c t io n
III. IMÁGENES DEL DESARROLLO DEL SERVICIO
CAMBIO DE ACOPLE DE ELECTROBOMBA
Retiro de acople antiguo Ejes de motor y bomba sin acople
Instalación de acople nuevo Alineamiento de electrobomba www.3fp.biz
F P F P
F P ire ro te c t io n
IV. OBSERVACIONES:
➢ No se realizó curva de performance, se realizará en la próxima inspección con el mantenimiento programado.
V. RECOMENDACIONES:
➢ N/A
VI. CLONCUSIONES:
➢ El equipo queda operativo y en automático.
➢ Se realizaron pruebas del equipo y funciono en buenas condiciones.
Tec. Johan Ramos
3FP SAC
F P ire rotection luid umps
Rev00
Pág. 1 de 5
REPORTE DE ALINEAMIENTO LASER DE EJES
Motor / Marca: WEG Modelo: Tipo de Base: Flexible
Velocidad: 1770 RPM Potencia: 40 HP Tipo de Acople: Flexible
GRAFICA EXPLICATIVA:
Valores de Alineamiento
Plano Tolerancias Recomendadas ± Rango de Velocidad de la
Maquina
HORIZONTAL VERTICAL BUENA EXCELENTE
DESPLAZAMIENTO mm Inicial - -
0.10 0.05 1000 – 2000
RPM
Final 0.05 0.04
ANGULAR mm/100 Inicial - -
0.08 0.05 Final 0.01 0.01
Observaciones y conclusiones:
• Los ajustes de alineamiento de ejes son aceptables según tabla de tolerancias
• Los valores de vibraciones post alineamiento son aceptables, ver reporte
Recomendaciones:
• Monitorear vibraciones cada 180 días de operación
Equipo Utilizado:
Sistema D450 – Easy Laser / Damalini Suecia
Solicitado por: Miguel Yucra Supervisado por: Realizado por:
Informe Nº: 0732-19 Fecha del Servicio: 30-octubre-2019
Cliente: NAMRU Ubicación: Lima
Planta: Hospital Naval Unidad:
Equipo: BOMBA CENTRIFUGA SCI TAG:
DATOS TECNICOS:
Pág. 2 de 5
ANALISIS DE VIBRACIONES A BOMBA DE SISTEMA CONTRA INCENDIO
I. OBJETIVO DEL SERVICIO
• Monitorear los niveles de vibraciones al motor y bomba post alineamiento de ejes
• Identificar mediante análisis espectral las frecuencias de falla y limitaciones de operación
• Asegurar la confiabilidad del equipo.
II. EQUIPO UTILIZADO
• Analizador de Vibraciones DSP Logger MX300 Marca: SEMAPI
• Software DSP Data Management, vers 11.0
III. ALCANCE DEL SERVICIO
• Bomba SCI - Medición en 4 puntos de apoyo (motor + bomba)
IV. PROCEDIMIENTOS
Todas las mediciones son realizadas en los puntos de apoyo, utilizando:
• Análisis espectral FFT por Envolvente de Aceleración (Estado de rodamientos)
• Análisis espectral FFT en modo velocidad (Evaluación Mecánica)
• Evaluación de vibración a condiciones normales de trabajo según norma ISO 10816-3
V. NORMATIVA EMPLEADA
ISO 10816-3:1995 Evaluación de vibración de máquina y mediciones en partes no rotantes.
Tabla N°1 – ISO 10816-3
VI. ORIENTACION DE LOS PUNTOS MEDIDOS
Pág. 3 de 5
VII. Tabla de Resumen de los Valores de vibración globales – RMS
PUNTOS
Vrms
[ mm/s] gE
H 1.15
0.02 V 1.35
Ax 1.90
H 1.77
0.02 V 1.96
Ax 1.90
H 1.20
0.05 V 1.48
Ax 1.97
H 1.13
0.07 V 0.91
Ax 1.13
Tolerancias de vibración [mm/s] Según ISO 10816-3 – Grupo 1
Alarma 7.10 mm/s y Parada 11.0 mm/s
VIII. CONCLUSIONES DE LOS VALORES RMS OBTENIDOS;
Velocidad de la vibración:
• Niveles vibratorios totales dentro de los recomendados por la Norma ISO 10816-3, Tabla Nº1
• No se observa picos relacionados a fallas de montaje, ver espectro N°1,2,3 y 4 Aceleración:
• No se observa picos relacionados a desgaste en los rodamientos
IX. RECOMENDACIONES:
• Hacer seguimiento vibracional cada 180 días de operación para establecer tendencia de vibración total.
• Continuar con la frecuencia de lubricación
Pág. 4 de 5
Principales Espectros
Espectro 1 – Punto 1H
Espectro 2 – Punto 2H
Pág. 5 de 5
Espectro 3 – Punto 3H
Espectro 4 – Punto 4H
ANNEX 5
F P ire ro te c t io n
Certificado de Operatividad: Nº: BCI -003-3FP19
Certifica que en la locación: NAMRU
Dirección: HOSPITAL NAVAL – AV. VENEZUELA
Se ha realizado la Puesta en marcha de:
Sistema de Bombeo Contra Incendio, que incluye Bomba principal, Tableros, Bomba Jockey y accesorios pertenecientes al sistema Contra Incendio existente, cuyos principales datos son los siguientes:
BOMBA CONTRA INCENDIO
FABRICANTE : AURORA PUMPS
PROCEDENCIA : U.S.A.
TIPO DE SISTEMA : ELECTROBOMBA
MODELO : 4-492-18
S/N : 09-1783254
MOTOR ELECTRICO
MARCA : WEG
MODELO : CC028A
S/N : 1030547953
CONTROLADOR PRINCIPAL
FABRICANTE : METRON
MODELO : MP430-75-240C MTS
S/N : NA-09N40352-11
BOMBA JOCKEY
MARCA : PENTAIR
MODELO : PVM-2-80
SERIE : 18-04739-20
TIPO : MULTIETÁPICA
F P ire ro te c t io n
CONTROLADOR JOCKEY
MARCA : METRON
MODELO : M15-B-2-240
SERIE : HK-09N40352-21
HP / VOLTAJE : 2 HP / 240 V
ACCESORIOS:
Válvula OS&Y de succión, válvula mariposa de descarga, válvula check, válvulas mariposa de línea de prueba.
Mediante el presente documento se certifica que los equipos descritos líneas arriba han aprobado todos los procedimientos descritos en la NFPA 20.
Quedando el sistema de bombeo en buenas condiciones de operación.
Vigencia: Fecha de Próxima Inspección:
Se expide el presente certificado para los fines que crea conveniente.
Lima, 12 de noviembre de 2019
Atentamente, 1 AÑO 08 de noviembre 2020
File details come from the government source that posted it. Updated .