W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 004 Auto Lighting System Animal Facilities.pdf
PDF 3 MB Posted
- Solicitation number
- W9127822R0005
About this file
This document outlines the requirements for a federal contract solicitation to provide operation and maintenance services for the US Navy Medical Research Unit Six facilities in Peru. The solicitation seeks to award a firm-fixed-price contract for a base year and four option years to furnish all personnel, services, materials, and transportation necessary for the continuous operation and maintenance of NAMRU-6 medical research laboratory facilities and support structures. Requirements include preventive, predictive, demand, and emergency maintenance for architectural, mechanical, electrical, and instrumentation systems. Limited grounds keeping is also required. The facilities include BSL-2 and BSL-3 laboratories, vivariums, administrative spaces, and supporting utilities. Contractor personnel may require security and health screenings. The solicitation will be posted at https://sam.gov with no printed version provided. The size standard is $41.5M average annual gross revenue. The Army Corps of Engineers Engineering District Mobile is the contracting agency.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD OPERATING PROCEDURE (SOP) – SEMIANNUAL
PREVENTIVE MAINTENANCE ACTIVITIES FOR AUTOMATIC LIGHTING
SYSTEM OF NAMRU-6 LIMA SITE
General Requirements for Lima
NAMRU-6 has an automatic lighting system for the rooms of the animal facilities. The automatic lighting system is dimmable and simulates the sunrise and sunset in each room. The automatic lighting system has also an adaptability function which allows monkeys to adapt to their normal lighting conditions. The level of lighting of each rooms depends is 1100 luxe for monkey rooms and 325 luxe for mice rooms. The automatic lighting system has 3 levels of operation: in the first level the operation/control can be made manually in each room and also through a panel installed in each room, the second level is through sensors installed on each animal rooms and the third one is by using the graphic interface (building automation system) installed in the main computer.
A complete description of the design and operation of the lighting system can be found in annex 1, “maintenance & operation manual”. A drawing showing the layout of the lights fixtures can be found in annex 2.
The system consists of the following equipment:
a) Monkey rooms
- 33 hermetic lights, with 70W LED lights brand TROLL
- 33 drivers DALI 70W, brand TRIDONIC
b) Mice rooms:
- 06 lights fixtures with 40W LED lights brand TROLL
- 06 drivers DALI 48W
- 04 hermetic lights with 70W LED lights brand TROLL
- 04 drivers DALI 70W brand TRIDONIC
c) Anti-rooms of monkey rooms
- 16 hermetic lights with LED lights 2x16W brand PHILIPS
- 05 combine light and presence sensors ZSY-IP-ROU brand ZENNIO
d) Main hallway
- 01 module DALI, DALIBOX interface 64/23 ZDI-DLI, brand ZENNIO
- 01 actuator KNX, REG HM, brand JUNG
- 01 power source KNX 320mA, 20320REG brand JUNG
- 01 interface KNX-IP, ZSY-IP-ROU, brand ZENNIO
- 06 breakers brand SCHNEIDER ELECTRIC
- 01 touch screen KNX ZVI-Z41PRO brand ZENNIO
- 08 binary modules KNX 2076-2T brand JUNG
e) Main exit
- 03 combine light and presence sensors KNX, 3361-1 MWW, brand JUNG
Section J - Exhibit 11.2.2 SOP-FAC 004
f) Office room
- CPU brand DELL
- Monitor brand DELL
- Software Windows
- Software BMS
- Software EMS
Contractor shall provide the names and certification of the technicians performing preventive maintenance tasks. Only qualified technicians shall perform preventive and corrective maintenance tasks.
Contractor shall perform periodic preventive maintenance activities to all of the equipment specified in this document. It is the responsibility of the contractor to perform a full inspection of the systems and collect all required information to provide a quality preventive maintenance. In addition, contractor shall review operation manuals for the equipment of the systems under this contract and include any recommended preventive maintenance activities by the manufacturer not mentioned in this document.
Contractor shall elaborate, review and update the drawings in AUTOCAD of the automatic lighting system of the animal facilities in Lima site on an annual basis.
Contractor shall install an anti-virus, Microsoft software and Adobe Acrobat Reader in the main PC of the automatic lighting system and shall keep the software up to date. Contractor must check and/or update software of the PC clients once a month.
Contractor shall include all materials, tools and personal protective equipment necessary to perform preventive and corrective maintenance work. Contractor must use the necessary and appropriate equipment to delimit the work area and not allow the pedestrian traffic. The contractor’s staff shall use the appropriate PPE for the activity to perform. NAMRU-6 will not provide any materials, tools nor PPE to the contractor to perform their work.
The contractor shall provide a weekly progress report to the NAMRU-6 facilities department, as well as a completion report when completing the maintenance work to include: activities performed with pictures, recommendations, conclusion and future needed corrective maintenance tasks. When a corrective maintenance work is required, the contractor shall submit a report detailing the problem encountered, with a quotation of the solution.
The preventive maintenance work will be coordinated between NAMRU-6 facilities staff and the staff assigned by the contractor.
Contractor shall perform operational testing of the systems at the completion of each preventive maintenance work. NAMRU-6 facilities department will assign a staff to participate in the operational testing and contractor shall prepare an operational testing form (checklist) to be signed by the facilities staff once testing is perform and accepted.
It is the responsibility of the contractor to dispose properly out of NAMRU-6 facilities all consumable materials and garbage generated by the contractor during the performance of the maintenance activities.
Contractor shall provide technical support by qualified technicians on the configuration and/or changes to the software and or set-up of the automatic system based on the user needs.
Applicable codes:
The following are applicable codes for the elaboration of the preventive maintenance plan, reports and activities mentioned in this document:
NFPA 77
NFPA 70
NEC
Local codes and regulations
Description of work required in Lima
The contractor shall perform the following preventive maintenance activities at the animal facilities in NAMRU-6 Lima:
AUTOMATIC LIGHTING SYSTEM – ANIMAL FACILITIES – LIMA
Item Sub-system Task Frequency
1 Main PC Install, check and/or update software of the PC (anti-virus, Microsoft software and Adobe Acrobat Reader)
Monthly
2 LED lights Visual inspection Quarterly
3 LED lights External cleaning of lights using appropriate tools following recommendations of O&M manual
Quarterly
4 LED lights Dissemble lights accessing all its parts and perform internal cleaning Quarterly
5 LED lights Check all connections and tight where needed Quarterly
6 LED lights Perform thermographic testing Quarterly
7 LED lights Perform lighting testing and measure light levels in room. Register information and provide a report.
Quarterly
8 Electrical panels Inspection and cleaning of exterior panel Quarterly
9 Electrical panels Inspection and cleaning of interior panel and devices Quarterly
10 Electrical panels Inspection and tighten of all electrical connections inside the panel Quarterly
11 KNX modules Visual inspection Quarterly
12 KNX modules External cleaning of lights using appropriate tools following recommendations of O&M manual
Quarterly
13 KNX modules perform internal cleaning Quarterly 14 KNX modules Perform operational testing Quarterly 15 HMI touchscreen Visual inspection Quarterly
16 HMI touchscreen External cleaning of lights using appropriate tools following recommendations of O&M manual
Quarterly
17 HMI touchscreen Perform operational testing Quarterly
18 Electrical panels Check and install missing labels of wires and breakers Annual
19 Electrical panels Provide and replace new signs and labels mounted in the panels Annual
20 Electrical panels Check and provide missing electrical drawings and/or circuit’s description card in the panels
Annual
21 Main PC Visual inspection Annual
22 Main PC External cleaning of PC using appropriate tools Annual
23 Dissemble PC accessing all its electronic parts Annual
24 Main PC Remove dust from all electronic parts. Annual 25 Main PC Cleaning of internal components Annual 26 Main PC Assemble PC Annual 27 Main PC Test operation of PC Annual 28 Main PC Perform final diagnosis to PC Annual
29 Main PC Elaborate, review and update drawings on AUTOCAD of the access control system Annual
Contractor will also include requirements per O&M manuals and any additional requirements not mentioned in this document but required or recommended by manufacturer as preventive maintenance activities to perform quarterly or annually.
ADDITIONAL INFORMATION
ANNEX 1: OPERATION AND MAINTENANCE MANUAL OF THE AUTOMATIC CONTROL
LIGHTING SYSTEM
ANNEX 2: LAYOUT OF LIGHTING FIXTURES OF THE AUTOMATIC LIGHTING SYSTEM IN
ANIMAL FACILITIES AT LIMA SITE
ANNEX 3: 2021 PREVENTIVE MAINTENANCE TO AUTOMATIC LIGHTING SYSTEM
ANNEX 1
ANNEX 2
GARDEN/
CUARTO SUCIO
A
1 2
NEW BOILER ROOM/
CALDERO
5 6 7 98 10 11 12
PASAJE
PASSAGE/
ANIMALES
CUARTO DE
DIRTY CAGE ROOM/
JARDIN
E
GARDEN/
B
JARDIN
C
D
CLEAN ROOM/
CUARTO LIMPIO
CASETA DE BOMBAS - C.M.NAVAL
PUMP HOUSE - CENTRO MEDICO NAVAL/
F
H
JARDIN
GARDEN/
PATIO DE SERVICIO
SERVICE AREA/
K
I
L
GARDEN/
LAB. PARASITOLOGIA
PARASITOLOGY LAB./
PREPARATION/
PREPARACION
CIRUGIA
SURGERY/
CUARTO DE ANIMALES
ANIMAL ROOM/
PASAJE CENTRAL
CENTRAL PASSAGE/
ANIMAL
CUARTO DE
ROOM/
ANIMALES
ANIMAL
ROOM/
ANIMAL
CUARTO DE
ROOM/
ANIMALES
OFFICE/
OFICINA
LAB. ENTOMOLOGIA
CUBICLE/
CUBICULO
ENTOMOLOGY LAB./
OFICINA
OFFICE/
HALL ENTRANCE/
INGRESO
PCR LAB./
LABORATORIO PCR
PASAJE
PASSAGE/
WOMEN'S WC/
SS.HH. MUJERESMEN'S WC/
SS.HH. VARONES
JARDIN
OFICINA
OFFICE/
WAREHOUSE/
ALMACEN GENERAL
764 5
INCINERADOR
INCINERATOR/
12111098
JARDIN
GARDEN/
CUARTO DE ENERGIA
ELECTRICAL ROOM/
A
E
RAMPA
RAMP /
B
C
D
LOADING AREA/
AREA DE CARGA
G
F
ALMACEN DE
FLAMMABLE LIQUIDS
INFLAMABLES
STORAGE/
LIQUIDOS
J
L
CUARTO DE ANIMALES
ANIMAL ROOM/
CUARTO DE ANIMALES
ANIMAL ROOM/
ANIMAL
ROOM/
CUARTO DE
ANIMALES
Naval Medical Research Institute Detachment Lima - Perú
N A M R I D
ARQ. MIRKA CIURLIZZA COELLO C.A.P. 6793
IE-01
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N.P.T.
AutoCAD SHX Text +0.60m.
AutoCAD SHX Text
AutoCAD SHX Text N.P.T.
AutoCAD SHX Text +0.60m.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 111A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 113A
AutoCAD SHX Text
AutoCAD SHX Text 109A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 107A
AutoCAD SHX Text
AutoCAD SHX Text 114C
AutoCAD SHX Text
AutoCAD SHX Text 114B
AutoCAD SHX Text 114A
AutoCAD SHX Text 114D
AutoCAD SHX Text
AutoCAD SHX Text 107B
AutoCAD SHX Text 105A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RAMPA/RAMP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RAMPA/RAMP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text T-2
AutoCAD SHX Text T-6
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text T-7
AutoCAD SHX Text T-3
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text T-1
AutoCAD SHX Text T-5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROYECCION CANALETA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
BUZON
AutoCAD SHX Text
TG
AutoCAD SHX Text 220 V.
AutoCAD SHX Text
TG
AutoCAD SHX Text 110 V.
AutoCAD SHX Text 110 V.
AutoCAD SHX Text 220 V.
AutoCAD SHX Text
1 DUCTO DE 4 VIAS VA A T.G. DE
AutoCAD SHX Text
EDIFICIO PRINCIPAL
AutoCAD SHX Text NYY - 3 x 120 mm2 (220 V.)
AutoCAD SHX Text NYY - 3 x 35 mm2 (110 V.)
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
TG
AutoCAD SHX Text
AutoCAD SHX Text 220 V
AutoCAD SHX Text h = 2.40 mts.
AutoCAD SHX Text CAJA OCTOGONAL 4" x 2"
AutoCAD SHX Text
BAJA CONMUTACION
AutoCAD SHX Text P
AutoCAD SHX Text NYY - 2 x 6 mm2
AutoCAD SHX Text 2 x 6 mm2
AutoCAD SHX Text NYY - 3 x 6 mm2
AutoCAD SHX Text
0 1 1/4" PVC-SAP
AutoCAD SHX Text 3 x 6 mm2
AutoCAD SHX Text 2x6 mm2
AutoCAD SHX Text 6"x6"x4"
AutoCAD SHX Text h=.40
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T-4
AutoCAD SHX Text T-8
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MADE BY/ELABORADO POR :
AutoCAD SHX Text M.C.C.
AutoCAD SHX Text
DATE/FECHA
AutoCAD SHX Text
REVIEW/REVISION
AutoCAD SHX Text
PROJECT/PROYECTO :
AutoCAD SHX Text
DRAWING/PLANO :
AutoCAD SHX Text
LOCATION/UBICATION :
AutoCAD SHX Text
REVISED/REVISADO :
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SCALE/ESCALA :
AutoCAD SHX Text
AMPLIACION OFICINAS - BIOTERIO/ANIMAL HOUSE
AutoCAD SHX Text
FILE/ARCHIVO :
AutoCAD SHX Text
DATE/FECHA :
AutoCAD SHX Text
OCT. 2004
AutoCAD SHX Text
HOSPITAL NAVAL LIMA - PERU
AutoCAD SHX Text
ALUMBRADO - PRIMER PISO
AutoCAD SHX Text
SHEET/LAMINA :
AutoCAD SHX Text 1/50
AutoCAD SHX Text
REVIEW
AutoCAD SHX Text
REVIEW
AutoCAD SHX Text
REVIEW
AutoCAD SHX Text
REVIEW
AutoCAD SHX Text 07/91
AutoCAD SHX Text 07/93
AutoCAD SHX Text 08/04
AutoCAD SHX Text 10/90
AutoCAD SHX Text
AutoCAD SHX Text S
RivasCR Typewritten Text Attachment 8
RivasCR Typewritten Text
ANNEX 3
INFORME
TÉCNICO
AMERICAN
EMBASSY
INFORME TÉCNICO
FECHA: REV: FASE:
13.11.2021 01 01
SUB-PROYECTO:
MANTENIMIENTO PREVENTIVO DEL SISTEMA DE AUTOMATIZACIÓN DE LOS LABORATORIOS DE VETERINARIA
DISCIPLINA:
ELECTRÓNICA E ILUMINACIÓN
Elaborado por: Alan Delgado
Revisado por: Raúl Astete
Aprobado por: Antonio Montoya
IP-IFS-LE250620-NAM-EA6-SEV-MPIAM2
FECHA : 19 de noviembre del 2021.
ATENCIÓN : Departamento de mantenimiento.
RAZÓN SOCIAL : American Embassy -NAMRU 6.
REFERENCIA : Sistema Eléctrico.
Mantenimiento preventivo semestral del sistema de iluminación automatizada en laboratorio de veterinaria.
1. INTRODUCCIÓN
Con fechas 05/10/2021, 06/10/2021 y 07/10/2021 se realizó el servicio de mantenimiento preventivo al sistema de automatización de iluminación de los laboratorios de veterinaria, ubicado en el primer piso del Edificio Anexo en NAMRU
-6.
2. OBJETIVOS
Dar a conocer, a través del presente informe, las actividades realizadas que corresponden al mantenimiento preventivo del sistema de automatización de iluminación.
3. LABORES REALIZADAS
• Limpieza tanto interna como externa del tablero principal y gabinetes secundarios.
• Ajuste y limpieza de los contactos y bornes.
• Limpieza de la pantalla touch, gateway y sensores de luminosidad.
• Limpieza y ajuste de luminarias y sus accesorios.
• Verificación de software (no se realizaron ajustes de programación).
4. OBSERVACIONES Y CONCLUSIONES.
• Todas las luminarias están funcionando correctamente con excepción en el ambiente 113 que se detectó una luminaria averiada, como medida correctiva se enviará presupuesto para uniformizar con nuevas luminarias.
• Hasta el momento se realizaron 02 atenciones de emergencia; la primera se realizó el 23/09/2021 y la segunda el día 04/11/2021 correspondientes a la configuración de una luminaria en el ambiente 114 – C.
• El siguiente mantenimiento semestral se realizará en la primera semana del mes de abril del 2022.
IP-IFS-LE250620-NAM-EA6-SEV-MPIAM2
5. RECOMENDACIONES
• Se recomienda uniformizar las luminarias en el ambiente 113 para mantener los niveles adecuados de iluminación y dejar las existentes como repuestos.
• La acumulación de polvo puede generar recalentamientos y disminución de los lúmenes que sin un mantenimiento adecuado puede llevar a correctivos en los dispositivos, por lo cual se recomienda realizar el mantenimiento preventivo en la fecha indicada.
Atte.
Alan Delgado RP Servicios
File details come from the government source that posted it. Updated .