The file's text, extracted by GovTribe without its formatting.
Bid Schedule 1 Base Yr
| PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE |
| NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU |
| BID SCHEDULE 1 BASE YEAR - LIMA | | | | | BID SCHEDULE 1 BASE YEAR - IQUITOS | | | | | BID SCHEDULE 1 BASE YEAR - PUERTO MALDONADO | | | | |
| BID ITEM | | | | | BID ITEM | | | | | BID ITEM | | | | |
| 1111 | | LABOR RATES | | | 1211 | | LABOR RATES | | | 1311 | | LABOR RATES | | |
| | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE |
| 1111 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 | 1211 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 | 1311 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 |
| 1111 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 | 1211 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 | 1311 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 |
| | FIELD SAFETY MANAGER (when separate | | | | | FIELD SAFETY MANAGER (when separate | | | | | FIELD SAFETY MANAGER (when separate | | |
| | person to be furnished) | | | | | person to be furnished) | | | | | person to be furnished) | | |
| 1111 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 | 1211 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 | 1311 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 |
| 1111 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 | 1211 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 | 1311 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 |
| 1111 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 | 1211 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 | 1311 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 |
| 1111 | F | ELECTRICIAN | HR. | $ - 0 | 1211 | F | ELECTRICIAN | HR. | $ - 0 | 1311 | F | ELECTRICIAN | HR. | $ - 0 |
| 1111 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 | 1211 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 | 1311 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 |
| 1111 | H | BOILER OPERATOR | HR. | $ - 0 | 1211 | H | BOILER OPERATOR | HR. | $ - 0 | 1311 | H | BOILER OPERATOR | HR. | $ - 0 |
| 1111 | I | UTILITY OPERATOR | HR. | $ - 0 | 1211 | I | UTILITY OPERATOR | HR. | $ - 0 | 1311 | I | UTILITY OPERATOR | HR. | $ - 0 |
| 1111 | J | HVAC MECHANIC | HR. | $ - 0 | 1211 | J | HVAC MECHANIC | HR. | $ - 0 | 1311 | J | HVAC MECHANIC | HR. | $ - 0 |
| 1111 | K | REFRIGERATION MECHANIC | HR. | $ - 0 | 1211 | K | REFRIGERATION MECHANIC | HR. | $ - 0 | 1311 | K | REFRIGERATION MECHANIC | HR. | $ - 0 |
| 1111 | L | PLUMBER | HR. | $ - 0 | 1211 | L | PLUMBER | HR. | $ - 0 | 1311 | L | PLUMBER | HR. | $ - 0 |
| 1111 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 | 1211 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 | 1311 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 |
| 1111 | N | EQUIPMENT OPERATOR | HR. | $ - 0 | 1211 | N | EQUIPMENT OPERATOR | HR. | $ - 0 | 1311 | N | EQUIPMENT OPERATOR | HR. | $ - 0 |
| 1111 | O | CARPENTER | HR. | $ - 0 | 1211 | O | CARPENTER | HR. | $ - 0 | 1311 | O | CARPENTER | HR. | $ - 0 |
| 1111 | P | PAINTER | HR. | $ - 0 | 1211 | P | PAINTER | HR. | $ - 0 | 1311 | P | PAINTER | HR. | $ - 0 |
| 1111 | Q | LOCKSMITH | HR. | $ - 0 | 1211 | Q | LOCKSMITH | HR. | $ - 0 | 1311 | Q | LOCKSMITH | HR. | $ - 0 |
| 1111 | R | GENERAL LABORER | HR. | $ - 0 | 1211 | R | GENERAL LABORER | HR. | $ - 0 | 1311 | R | GENERAL LABORER | HR. | $ - 0 |
| 1111 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 | 1211 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 | 1311 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 |
| 1111 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 | 1211 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 | 1311 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 |
| *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. | *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. | *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. |
| **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. | **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. | **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. |
| BID SCHEDULE 1 BASE YEAR - LIMA | | | | | BID SCHEDULE 1 BASE YEAR - IQUITOS | | | | | BID SCHEDULE 1 BASE YEAR - PUERTO MALDONADO | | | | |
| BID ITEM | | | | | BID ITEM | | | | | BID ITEM | | | | |
| | | UNIT | PERCENTAGE | | | | UNIT | PERCENTAGE | | | | UNIT | PERCENTAGE |
| 1112 | | PRIME CONTRACTOR MARKUP | | | 1212 | | PRIME CONTRACTOR MARKUP | | | 1312 | | PRIME CONTRACTOR MARKUP | | |
| 1112 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1101A through 1101R (after applying differentials where appropriate) | % | - | 1212 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1201A through 1201R (after applying differentials where appropriate) | % | - | 1312 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1301A through 1301R (after applying differentials where appropriate) | % | - |
| 1112 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - | 1212 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - | 1312 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - |
Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1111A is the CLIN for Bid Schedule 1, Lima, Operation & Maintenance, Base Year, G.C. Site Supervisor. Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1211A is the CLIN for Bid Schedule 1, Iquitos, Operation & Maintenance, Base Year, G.C. Site Supervisor. Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1311A is the CLIN for Bid Schedule 1, Puerto Maldonado, Operation & Maintenance, Base Year, G.C. Site Supervisor.
Bid Schedule 1 Opt Yr 1
| PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE |
| NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU |
| BID SCHEDULE 1 OPTION YEAR 1 - LIMA | | | | | BID SCHEDULE 1 OPTION YEAR 1 - IQUITOS | | | | | BID SCHEDULE 1 OPTION YEAR 1 - PUERTO MALDONADO | | | | |
| BID ITEM | | | | | BID ITEM | | | | | BID ITEM | | | | |
| 1121 | | LABOR RATES | | | 1221 | | LABOR RATES | | | 1321 | | LABOR RATES | | |
| | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE |
| 1121 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 | 1221 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 | 1321 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 |
| 1121 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 | 1221 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 | 1321 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 |
| | FIELD SAFETY MANAGER (when separate | | | | | FIELD SAFETY MANAGER (when separate | | | | | FIELD SAFETY MANAGER (when separate | | |
| | person to be furnished) | | | | | person to be furnished) | | | | | person to be furnished) | | |
| 1121 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 | 1221 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 | 1321 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 |
| 1121 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 | 1221 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 | 1321 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 |
| 1121 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 | 1221 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 | 1321 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 |
| 1121 | F | ELECTRICIAN | HR. | $ - 0 | 1221 | F | ELECTRICIAN | HR. | $ - 0 | 1321 | F | ELECTRICIAN | HR. | $ - 0 |
| 1121 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 | 1221 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 | 1321 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 |
| 1121 | H | BOILER OPERATOR | HR. | $ - 0 | 1221 | H | BOILER OPERATOR | HR. | $ - 0 | 1321 | H | BOILER OPERATOR | HR. | $ - 0 |
| 1121 | I | UTILITY OPERATOR | HR. | $ - 0 | 1221 | I | UTILITY OPERATOR | HR. | $ - 0 | 1321 | I | UTILITY OPERATOR | HR. | $ - 0 |
| 1121 | J | HVAC MECHANIC | HR. | $ - 0 | 1221 | J | HVAC MECHANIC | HR. | $ - 0 | 1321 | J | HVAC MECHANIC | HR. | $ - 0 |
| 1121 | K | REFRIGERATION MECHANIC | HR. | $ - 0 | 1221 | K | REFRIGERATION MECHANIC | HR. | $ - 0 | 1321 | K | REFRIGERATION MECHANIC | HR. | $ - 0 |
| 1121 | L | PLUMBER | HR. | $ - 0 | 1221 | L | PLUMBER | HR. | $ - 0 | 1321 | L | PLUMBER | HR. | $ - 0 |
| 1121 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 | 1221 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 | 1321 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 |
| 1121 | N | EQUIPMENT OPERATOR | HR. | $ - 0 | 1221 | N | EQUIPMENT OPERATOR | HR. | $ - 0 | 1321 | N | EQUIPMENT OPERATOR | HR. | $ - 0 |
| 1121 | O | CARPENTER | HR. | $ - 0 | 1221 | O | CARPENTER | HR. | $ - 0 | 1321 | O | CARPENTER | HR. | $ - 0 |
| 1121 | P | PAINTER | HR. | $ - 0 | 1221 | P | PAINTER | HR. | $ - 0 | 1321 | P | PAINTER | HR. | $ - 0 |
| 1121 | Q | LOCKSMITH | HR. | $ - 0 | 1221 | Q | LOCKSMITH | HR. | $ - 0 | 1321 | Q | LOCKSMITH | HR. | $ - 0 |
| 1121 | R | GENERAL LABORER | HR. | $ - 0 | 1221 | R | GENERAL LABORER | HR. | $ - 0 | 1321 | R | GENERAL LABORER | HR. | $ - 0 |
| 1121 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 | 1221 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 | 1321 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 |
| 1121 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 | 1221 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 | 1321 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 |
| *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. | *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. | *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. |
| **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. | **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. | **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. |
| BID SCHEDULE 1 OPTION YEAR 1 - LIMA | | | | | BID SCHEDULE 1 OPTION YEAR 1 - IQUITOS | | | | | BID SCHEDULE 1 OPTION YEAR 1 - PUERTO MALDONADO | | | | |
| BID ITEM | | | | | BID ITEM | | | | | BID ITEM | | | | |
| | | UNIT | PERCENTAGE | | | | UNIT | PERCENTAGE | | | | UNIT | PERCENTAGE |
| 1122 | | PRIME CONTRACTOR MARKUP | | | 1222 | | PRIME CONTRACTOR MARKUP | | | 1322 | | PRIME CONTRACTOR MARKUP | | |
| 1122 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1101A through 1101R (after applying differentials where appropriate) | % | - | 1222 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1201A through 1201R (after applying differentials where appropriate) | % | - | 1322 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1301A through 1301R (after applying differentials where appropriate) | % | - |
| 1122 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - | 1222 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - | 1322 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - |
Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1121A is the CLIN for Bid Schedule 1, Lima, Operation & Maintenance, Option Year 1, G.C. Site Supervisor. Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1221A is the CLIN for Bid Schedule 1, Iquitos, Operation & Maintenance, Option Year 1, G.C. Site Supervisor. Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1321A is the CLIN for Bid Schedule 1, Maldonado, Operation & Maintenance, Option Year 1, G.C. Site Supervisor.
Bid Schedule 1 Opt Yr 2
| PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE |
| NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU |
| BID SCHEDULE 1 OPTION YEAR 2 - LIMA | | | | | BID SCHEDULE 1 OPTION YEAR 2 - IQUITOS | | | | | BID SCHEDULE 1 OPTION YEAR 2 - PUERTO MALDONADO | | | | |
| BID ITEM | | | | | BID ITEM | | | | | BID ITEM | | | | |
| 1131 | | LABOR RATES | | | 1231 | | LABOR RATES | | | 1331 | | LABOR RATES | | |
| | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE |
| 1131 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 | 1231 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 | 1331 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 |
| 1131 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 | 1231 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 | 1331 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 |
| | FIELD SAFETY MANAGER (when separate | | | | | FIELD SAFETY MANAGER (when separate | | | | | FIELD SAFETY MANAGER (when separate | | |
| | person to be furnished) | | | | | person to be furnished) | | | | | person to be furnished) | | |
| 1131 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 | 1231 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 | 1331 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 |
| 1131 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 | 1231 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 | 1331 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 |
| 1131 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 | 1231 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 | 1331 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 |
| 1131 | F | ELECTRICIAN | HR. | $ - 0 | 1231 | F | ELECTRICIAN | HR. | $ - 0 | 1331 | F | ELECTRICIAN | HR. | $ - 0 |
| 1131 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 | 1231 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 | 1331 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 |
| 1131 | H | BOILER OPERATOR | HR. | $ - 0 | 1231 | H | BOILER OPERATOR | HR. | $ - 0 | 1331 | H | BOILER OPERATOR | HR. | $ - 0 |
| 1131 | I | UTILITY OPERATOR | HR. | $ - 0 | 1231 | I | UTILITY OPERATOR | HR. | $ - 0 | 1331 | I | UTILITY OPERATOR | HR. | $ - 0 |
| 1131 | J | HVAC MECHANIC | HR. | $ - 0 | 1231 | J | HVAC MECHANIC | HR. | $ - 0 | 1331 | J | HVAC MECHANIC | HR. | $ - 0 |
| 1131 | K | REFRIGERATION MECHANIC | HR. | $ - 0 | 1231 | K | REFRIGERATION MECHANIC | HR. | $ - 0 | 1331 | K | REFRIGERATION MECHANIC | HR. | $ - 0 |
| 1131 | L | PLUMBER | HR. | $ - 0 | 1231 | L | PLUMBER | HR. | $ - 0 | 1331 | L | PLUMBER | HR. | $ - 0 |
| 1131 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 | 1231 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 | 1331 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 |
| 1131 | N | EQUIPMENT OPERATOR | HR. | $ - 0 | 1231 | N | EQUIPMENT OPERATOR | HR. | $ - 0 | 1331 | N | EQUIPMENT OPERATOR | HR. | $ - 0 |
| 1131 | O | CARPENTER | HR. | $ - 0 | 1231 | O | CARPENTER | HR. | $ - 0 | 1331 | O | CARPENTER | HR. | $ - 0 |
| 1131 | P | PAINTER | HR. | $ - 0 | 1231 | P | PAINTER | HR. | $ - 0 | 1331 | P | PAINTER | HR. | $ - 0 |
| 1131 | Q | LOCKSMITH | HR. | $ - 0 | 1231 | Q | LOCKSMITH | HR. | $ - 0 | 1331 | Q | LOCKSMITH | HR. | $ - 0 |
| 1131 | R | GENERAL LABORER | HR. | $ - 0 | 1231 | R | GENERAL LABORER | HR. | $ - 0 | 1331 | R | GENERAL LABORER | HR. | $ - 0 |
| 1131 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 | 1231 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 | 1331 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 |
| 1131 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 | 1231 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 | 1331 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 |
| *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. | *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. | *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. |
| **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. | **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. | **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. |
| BID SCHEDULE 1 OPTION YEAR 2 - LIMA | | | | | BID SCHEDULE 1 OPTION YEAR 2 - IQUITOS | | | | | BID SCHEDULE 1 OPTION YEAR 2 - PUERTO MALDONADO | | | | |
| BID ITEM | | | | | BID ITEM | | | | | BID ITEM | | | | |
| | | UNIT | PERCENTAGE | | | | UNIT | PERCENTAGE | | | | UNIT | PERCENTAGE |
| 1132 | | PRIME CONTRACTOR MARKUP | | | 1232 | | PRIME CONTRACTOR MARKUP | | | 1332 | | PRIME CONTRACTOR MARKUP | | |
| 1132 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1101A through 1101R (after applying differentials where appropriate) | % | - | 1232 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1201A through 1201R (after applying differentials where appropriate) | % | - | 1332 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1301A through 1301R (after applying differentials where appropriate) | % | - |
| 1132 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - | 1232 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - | 1332 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - |
Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1131A is the CLIN for Bid Schedule 1, Lima, Operation & Maintenance, Option Year 2, G.C. Site Supervisor. Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1231A is the CLIN for Bid Schedule 1, Iquitos, Operation & Maintenance, Option Year 2, G.C. Site Supervisor. Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1331A is the CLIN for Bid Schedule 1, Maldonado, Operation & Maintenance, Option Year 2, G.C. Site Supervisor.
Bid Schedule 1 Opt Yr 3
| PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE |
| NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU |
| BID SCHEDULE 1 OPTION YEAR 3 - LIMA | | | | | BID SCHEDULE 1 OPTION YEAR 3 - IQUITOS | | | | | BID SCHEDULE 1 OPTION YEAR 3 - PUERTO MALDONADO | | | | |
| BID ITEM | | | | | BID ITEM | | | | | BID ITEM | | | | |
| 1141 | | LABOR RATES | | | 1241 | | LABOR RATES | | | 1341 | | LABOR RATES | | |
| | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE |
| 1141 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 | 1241 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 | 1341 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 |
| 1141 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 | 1241 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 | 1341 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 |
| | FIELD SAFETY MANAGER (when separate | | | | | FIELD SAFETY MANAGER (when separate | | | | | FIELD SAFETY MANAGER (when separate | | |
| | person to be furnished) | | | | | person to be furnished) | | | | | person to be furnished) | | |
| 1141 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 | 1241 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 | 1341 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 |
| 1141 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 | 1241 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 | 1341 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 |
| 1141 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 | 1241 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 | 1341 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 |
| 1141 | F | ELECTRICIAN | HR. | $ - 0 | 1241 | F | ELECTRICIAN | HR. | $ - 0 | 1341 | F | ELECTRICIAN | HR. | $ - 0 |
| 1141 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 | 1241 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 | 1341 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 |
| 1141 | H | BOILER OPERATOR | HR. | $ - 0 | 1241 | H | BOILER OPERATOR | HR. | $ - 0 | 1341 | H | BOILER OPERATOR | HR. | $ - 0 |
| 1141 | I | UTILITY OPERATOR | HR. | $ - 0 | 1241 | I | UTILITY OPERATOR | HR. | $ - 0 | 1341 | I | UTILITY OPERATOR | HR. | $ - 0 |
| 1141 | J | HVAC MECHANIC | HR. | $ - 0 | 1241 | J | HVAC MECHANIC | HR. | $ - 0 | 1341 | J | HVAC MECHANIC | HR. | $ - 0 |
| 1141 | K | REFRIGERATION MECHANIC | HR. | $ - 0 | 1241 | K | REFRIGERATION MECHANIC | HR. | $ - 0 | 1341 | K | REFRIGERATION MECHANIC | HR. | $ - 0 |
| 1141 | L | PLUMBER | HR. | $ - 0 | 1241 | L | PLUMBER | HR. | $ - 0 | 1341 | L | PLUMBER | HR. | $ - 0 |
| 1141 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 | 1241 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 | 1341 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 |
| 1141 | N | EQUIPMENT OPERATOR | HR. | $ - 0 | 1241 | N | EQUIPMENT OPERATOR | HR. | $ - 0 | 1341 | N | EQUIPMENT OPERATOR | HR. | $ - 0 |
| 1141 | O | CARPENTER | HR. | $ - 0 | 1241 | O | CARPENTER | HR. | $ - 0 | 1341 | O | CARPENTER | HR. | $ - 0 |
| 1141 | P | PAINTER | HR. | $ - 0 | 1241 | P | PAINTER | HR. | $ - 0 | 1341 | P | PAINTER | HR. | $ - 0 |
| 1141 | Q | LOCKSMITH | HR. | $ - 0 | 1241 | Q | LOCKSMITH | HR. | $ - 0 | 1341 | Q | LOCKSMITH | HR. | $ - 0 |
| 1141 | R | GENERAL LABORER | HR. | $ - 0 | 1241 | R | GENERAL LABORER | HR. | $ - 0 | 1341 | R | GENERAL LABORER | HR. | $ - 0 |
| 1141 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 | 1241 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 | 1341 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 |
| 1141 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 | 1241 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 | 1341 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 |
| *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. | *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. | *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. |
| **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. | **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. | **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. |
| BID SCHEDULE 1 OPTION YEAR 3 - LIMA | | | | | BID SCHEDULE 1 OPTION YEAR 3 - IQUITOS | | | | | BID SCHEDULE 1 OPTION YEAR 3 - PUERTO MALDONADO | | | | |
| BID ITEM | | | | | BID ITEM | | | | | BID ITEM | | | | |
| | | UNIT | PERCENTAGE | | | | UNIT | PERCENTAGE | | | | UNIT | PERCENTAGE |
| 1142 | | PRIME CONTRACTOR MARKUP | | | 1242 | | PRIME CONTRACTOR MARKUP | | | 1342 | | PRIME CONTRACTOR MARKUP | | |
| 1142 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1101A through 1101R (after applying differentials where appropriate) | % | - | 1242 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1201A through 1201R (after applying differentials where appropriate) | % | - | 1342 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1301A through 1301R (after applying differentials where appropriate) | % | - |
| 1142 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - | 1242 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - | 1342 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - |
Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1141A is the CLIN for Bid Schedule 1, Lima, Operation & Maintenance, Option Year 3, G.C. Site Supervisor. Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1241A is the CLIN for Bid Schedule 1, Iquitos, Operation & Maintenance, Option Year 3, G.C. Site Supervisor. Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1341A is the CLIN for Bid Schedule 1, Puerto Maldonado, Operation & Maintenance, Option Year 3, G.C. Site Supervisor.
Bid Schedule 1 Opt Yr 4
| PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE |
| NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU |
| BID SCHEDULE 1 OPTION YEAR 4 - LIMA | | | | | BID SCHEDULE 1 OPTION YEAR 4 - IQUITOS | | | | | BID SCHEDULE 1 BOPTION YEAR 4 - PUERTO MALDONADO | | | | |
| BID ITEM | | | | | BID ITEM | | | | | BID ITEM | | | | |
| 1151 | | LABOR RATES | | | 1251 | | LABOR RATES | | | 1351 | | LABOR RATES | | |
| | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE |
| 1151 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 | 1251 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 | 1351 | A | G.C. SITE SUPERVISOR | HR. | $ - 0 |
| 1151 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 | 1251 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 | 1351 | B | G.C. FIELD QUALITY CONTROL MANAGER / | HR. | $ - 0 |
| | FIELD SAFETY MANAGER (when separate | | | | | FIELD SAFETY MANAGER (when separate | | | | | FIELD SAFETY MANAGER (when separate | | |
| | person to be furnished) | | | | | person to be furnished) | | | | | person to be furnished) | | |
| 1151 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 | 1251 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 | 1351 | C | G.C. FIELD OFFICE CLERK | HR. | $ - 0 |
| 1151 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 | 1251 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 | 1351 | D | WAREHOUSE SPECIALIST | HR. | $ - 0 |
| 1151 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 | 1251 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 | 1351 | E | ENGINEERING TECHNICIAN | HR. | $ - 0 |
| 1151 | F | ELECTRICIAN | HR. | $ - 0 | 1251 | F | ELECTRICIAN | HR. | $ - 0 | 1351 | F | ELECTRICIAN | HR. | $ - 0 |
| 1151 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 | 1251 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 | 1351 | G | ELECTRONICS TECHNICIAN | HR. | $ - 0 |
| 1151 | H | BOILER OPERATOR | HR. | $ - 0 | 1251 | H | BOILER OPERATOR | HR. | $ - 0 | 1351 | H | BOILER OPERATOR | HR. | $ - 0 |
| 1151 | I | UTILITY OPERATOR | HR. | $ - 0 | 1251 | I | UTILITY OPERATOR | HR. | $ - 0 | 1351 | I | UTILITY OPERATOR | HR. | $ - 0 |
| 1151 | J | HVAC MECHANIC | HR. | $ - 0 | 1251 | J | HVAC MECHANIC | HR. | $ - 0 | 1351 | J | HVAC MECHANIC | HR. | $ - 0 |
| 1151 | K | REFRIGERATION MECHANIC | HR. | $ - 0 | 1251 | K | REFRIGERATION MECHANIC | HR. | $ - 0 | 1351 | K | REFRIGERATION MECHANIC | HR. | $ - 0 |
| 1151 | L | PLUMBER | HR. | $ - 0 | 1251 | L | PLUMBER | HR. | $ - 0 | 1351 | L | PLUMBER | HR. | $ - 0 |
| 1151 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 | 1251 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 | 1351 | M | GENERAL MAINTENANCE MECHANIC | HR. | $ - 0 |
| 1151 | N | EQUIPMENT OPERATOR | HR. | $ - 0 | 1251 | N | EQUIPMENT OPERATOR | HR. | $ - 0 | 1351 | N | EQUIPMENT OPERATOR | HR. | $ - 0 |
| 1151 | O | CARPENTER | HR. | $ - 0 | 1251 | O | CARPENTER | HR. | $ - 0 | 1351 | O | CARPENTER | HR. | $ - 0 |
| 1151 | P | PAINTER | HR. | $ - 0 | 1251 | P | PAINTER | HR. | $ - 0 | 1351 | P | PAINTER | HR. | $ - 0 |
| 1151 | Q | LOCKSMITH | HR. | $ - 0 | 1251 | Q | LOCKSMITH | HR. | $ - 0 | 1351 | Q | LOCKSMITH | HR. | $ - 0 |
| 1151 | R | GENERAL LABORER | HR. | $ - 0 | 1251 | R | GENERAL LABORER | HR. | $ - 0 | 1351 | R | GENERAL LABORER | HR. | $ - 0 |
| 1151 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 | 1251 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 | 1351 | S | OVERTIME DIFFERENTIAL (*see explanation below) | HR. | $ - 0 |
| 1151 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 | 1251 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 | 1351 | T | AFTER-HOURS DIFFERENTIAL (**see explanation below) | HR. | $ - 0 |
| *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. | *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. | *OVERTIME DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING IN EXCESS OF 40 HOURS PER WEEK. THE DIFFERENTIAL WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THE OVERTIME WORKED. |
| **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. | **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. | **AFTER-HOURS DIFFERENTIAL - THIS REPRESENTS THE ADDITIONAL WAGES PAID TO EMPLOYEES WORKING TIMES OTHER THAN DURING NORMAL OPERATING HOURS DEFINED BY SECTION C. IT WOULD BE APPLIED TO THE HOURLY RATE FOR AFFECTED WORKERS, ONLY FOR THOSE HOURS WORKED OUTSIDE NORMAL OPERATING HOURS. |
| BID SCHEDULE 1 OPTION YEAR 4 - LIMA | | | | | BID SCHEDULE 1 OPTION YEAR 4 - IQUITOS | | | | | BID SCHEDULE 1 BOPTION YEAR 4 - PUERTO MALDONADO | | | | |
| BID ITEM | | | | | BID ITEM | | | | | BID ITEM | | | | |
| | | UNIT | PERCENTAGE | | | | UNIT | PERCENTAGE | | | | UNIT | PERCENTAGE |
| 1152 | | PRIME CONTRACTOR MARKUP | | | 1252 | | PRIME CONTRACTOR MARKUP | | | 1352 | | PRIME CONTRACTOR MARKUP | | |
| 1152 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1101A through 1101R (after applying differentials where appropriate) | % | - | 1252 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1201A through 1201R (after applying differentials where appropriate) | % | - | 1352 | A | OPERATION & MAINTENANCE - GENERAL & ADMINISTRATIVE OVERHEADS (HOME AND BRANCH OFFICE), AND PROFIT. The percentage entered here will be applied to the sum of CLINs 1301A through 1301R (after applying differentials where appropriate) | % | - |
| 1152 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - | 1252 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - | 1352 | B | SUBCONTRACTS - HANDLING FEE TO INCLUDE ALL PRIME CONTRACTOR EXPENSES RELATED TO PROCUREMENT AND MANAGEMENT OF SUBCONTRACTS (INCLUDING APPLICABLE OVERHEAD & PROFIT). | % | - |
Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1151A is the CLIN for Bid Schedule 1, Lima, Operation & Maintenance, Option Year 4, G.C. Site Supervisor. Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1251A is the CLIN for Bid Schedule 1, Iquitos, Operation & Maintenance, Option Year 4, G.C. Site Supervisor. Cost Line Item Numbers (CLINs) in Bid Schedule 1 are numbered using the following numbering convention. The first digit represents the bid schedule number. The second digit represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado). The third digit (1 through 5) represents the 12-month period. The fourth digit (1-2) represents the type of CLIN (1 for Labor Rates and 2 for Prime Contractor Markups). The final character represents the sub line item (A through T, depending on the number of sub-items). For example, CLIN 1351A is the CLIN for Bid Schedule 1, Puerto Maldonado, Operation & Maintenance, Option Year 4, G.C. Site Supervisor.
Bid Schedule 2
| PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE | PERFORM FACILITIES OPERATIONS AND MAINTENANCE |
| NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU | NAMRU-6, VARIOUS LOCATIONS THROUGHOUT PERU |
| BID SCHEDULE 2 | | | | BID SCHEDULE 2 | | | | BID SCHEDULE 2 | | | |
| BID ITEM | | | | BID ITEM | | | | BID ITEM | | | |
| OPERATION & MAINTENANCE - LIMA | | | | OPERATION & MAINTENANCE - IQUITOS | | | | OPERATION & MAINTENANCE - PUERTO MALDONADO | | |
| COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE |
| 2101 | BASE YEAR OPERATION & MAINTENANCE | EA. | $ - 0 | 2201 | BASE YEAR OPERATION & MAINTENANCE | EA. | $ - 0 | 2301 | BASE YEAR OPERATION & MAINTENANCE | EA. | $ - 0 |
| 2101A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 | 2201A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 | 2301A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 |
| 2101B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 | 2201B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 | 2301B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 |
| 2102 | OPTION YEAR 1 OPERATION & MAINTENANCE | EA. | $ - 0 | 2202 | OPTION YEAR 1 OPERATION & MAINTENANCE | EA. | $ - 0 | 2302 | OPTION YEAR 1 OPERATION & MAINTENANCE | EA. | $ - 0 |
| 2102A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 | 2202A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 | 2302A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 |
| 2102B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 | 2202B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 | 2302B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 |
| 2103 | OPTION YEAR 2 OPERATION & MAINTENANCE | EA. | $ - 0 | 2203 | OPTION YEAR 2 OPERATION & MAINTENANCE | EA. | $ - 0 | 2303 | OPTION YEAR 2 OPERATION & MAINTENANCE | EA. | $ - 0 |
| 2103A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 | 2203A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 | 2303A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 |
| 2103B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 | 2203B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 | 2303B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 |
| 2104 | OPTION YEAR 3 OPERATION & MAINTENANCE | EA. | $ - 0 | 2204 | OPTION YEAR 3 OPERATION & MAINTENANCE | EA. | $ - 0 | 2304 | OPTION YEAR 3 OPERATION & MAINTENANCE | EA. | $ - 0 |
| 2104A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 | 2204A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 | 2304A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 |
| 2104B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 | 2204B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 | 2304B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 |
| 2105 | OPTION YEAR 4 OPERATION & MAINTENANCE | EA. | $ - 0 | 2205 | OPTION YEAR 4 OPERATION & MAINTENANCE | EA. | $ - 0 | 2305 | OPTION YEAR 4 OPERATION & MAINTENANCE | EA. | $ - 0 |
| 2105A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 | 2205A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 | 2305A | PREVENTIVE MAINTENANCE PER SOPs | EA. | $ - 0 |
| 2105B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 | 2205B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 | 2305B | UNSCHEDULED MAINTENANCE | NOT TO EXCEED | $ 150,000.00 |
| STERILIZER O&M - LIMA (COST NOT INCLUDED IN BID ITEMS ABOVE) | | | | STERILIZER O&M - IQUITOS (COST NOT INCLUDED IN BID ITEMS ABOVE) | | | | STERILIZER O&M - PUERTO MALDONADO (COST NOT INCLUDED IN BID ITEMS ABOVE) | | |
| COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE | | COST TO PRIME CONTRACTOR | UNIT | UNIT PRICE |
| 2101E | OPTIONAL ITEM - BASE YEAR STERILIZER O&M | EA. | $ - 0 | 2201E | OPTIONAL ITEM - BASE YEAR STERILIZER O&M | EA. | $ - 0 | 2301E | OPTIONAL ITEM - BASE YEAR STERILIZER O&M | EA. | $ - 0 |
| 2102E | OPTIONAL ITEM - OPTION YEAR 1 STERILIZER O&M | EA. | $ - 0 | 2202E | OPTIONAL ITEM - OPTION YEAR 1 STERILIZER O&M | EA. | $ - 0 | 2302E | OPTIONAL ITEM - OPTION YEAR 1 STERILIZER O&M | EA. | $ - 0 |
| 2103E | OPTIONAL ITEM - OPTION YEAR 2 STERILIZER O&M | EA. | $ - 0 | 2203E | OPTIONAL ITEM - OPTION YEAR 2 STERILIZER O&M | EA. | $ - 0 | 2303E | OPTIONAL ITEM - OPTION YEAR 2 STERILIZER O&M | EA. | $ - 0 |
| 2104E | OPTIONAL ITEM - OPTION YEAR 3 STERILIZER O&M | EA. | $ - 0 | 2204E | OPTIONAL ITEM - OPTION YEAR 3 STERILIZER O&M | EA. | $ - 0 | 2304E | OPTIONAL ITEM - OPTION YEAR 3 STERILIZER O&M | EA. | $ - 0 |
| 2105E | OPTIONAL ITEM - OPTION YEAR 4 STERILIZER O&M | EA. | $ - 0 | 2205E | OPTIONAL ITEM - OPTION YEAR 4 STERILIZER O&M | EA. | $ - 0 | 2305E | OPTIONAL ITEM - OPTION YEAR 4 STERILIZER O&M | EA. | $ - 0 |
CLINS in Bid Schedule 2 are numbered sequentially by site and reflect the proposed cost to operate and maintain the identified site during the identified 12-month period. The first digit represents the bid schedule number. The second digit of each CLIN represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado) and the third and fourth digits (01-05) represent the 12-month period. The final character represents the sub line item (A through D, depending on the number of sub-items). For example, in Bid Schedule 2, CLIN 2101 is the CLIN for the cost of preventive maintenance of the Lima site during the base year of this contract. CLINS in Bid Schedule 2 are numbered sequentially by site and reflect the proposed cost to operate and maintain the identified site during the identified 12-month period. The first digit represents the bid schedule number. The second digit of each CLIN represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado) and the third and fourth digits (01-05) represent the 12-month period. The final character represents the sub line item (A through D, depending on the number of sub-items). For example, in Bid Schedule 2, CLIN 2201 is the CLIN for the cost of preventive maintenance of the Iquitos site during the base year of this contract. CLINS in Bid Schedule 2 are numbered sequentially by site and reflect the proposed cost to operate and maintain the identified site during the identified 12-month period. The first digit represents the bid schedule number. The second digit of each CLIN represents the site number (1 for Lima; 2 for Iquitos; 3 for Puerto Maldonado) and the third and fourth digits (01-05) represent the 12-month period. The final character represents the sub line item (A through D, depending on the number of sub-items). For example, in Bid Schedule 2, CLIN 2301 is the CLIN for the cost of preventive maintenance of the Puerto Maldonado site during the base year of this contract.
CLIN 2101 shall be populated with the sum of sub lilne items 2101A and 2101B, and represents the total cost of Operation and Maintenance for Lima for the identified 12-month period (not to include the cost of sterilizer maintenance which is reflected in sub line items ending in "E." The values for CLINS 2102, 2103, 2104, and 2105 shall be calculated in the same way for each identified 12-month period (the sum of the preventive maintenance and unscheduled maintenance sub line items). CLIN 2201 shall be populated with the sum of sub lilne items 2201A and 2201B, and represents the total cost of Operation and Maintenance for Lima for the identified 12-month period (not to include the cost of sterilizer maintenance which is reflected in sub line items ending in "E." The values for CLINS 2202, 2203, 2204, and 2205 shall be calculated in the same way for each identified 12-month period (the sum of the preventive maintenance and unscheduled maintenance sub line items). CLIN 2301 shall be populated with the sum of sub lilne items 2301A and 2301B, and represents the total cost of Operation and Maintenance for Lima for the identified 12-month period (not to include the cost of sterilizer maintenance which is reflected in sub line items ending in "E." The values for CLINS 2302, 2303, 2304, and 2305 shall be calculated in the same way for each identified 12-month period (the sum of the preventive maintenance and unscheduled maintenance sub line items).