W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 005 Electrical Substation & Main Panelboards.pdf
PDF 11 MB Posted
- Solicitation number
- W9127822R0005
About this file
This document provides details on a federal contract solicitation for operation and maintenance services at the US Navy Medical Research Unit Six facility in Peru. The solicitation seeks a firm-fixed price contract for a base year and four option years to furnish all personnel, services, materials, and transportation necessary to support medical research laboratory and support facilities. Requirements include preventative, predictive, demand, and emergency maintenance of architectural, mechanical, electrical, and instrumentation systems. Limited grounds keeping is also required. The contractor must minimize interference with daily laboratory operations and comply with regulatory bodies such as AAALAC. Facilities include BSL-2 and BSL-3 research labs, a vivarium, administrative spaces, parking areas, and supporting utilities. The solicitation will be posted at https://sam.gov with no printed version provided. The size standard is an organization with average annual revenue not exceeding $41.5 million for the past three years under NAICS code 561210.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD OPERATING PROCEDURE (SOP) – ANNUAL PREVENTIVE
MAINTENANCE ACTIVITIES TO ELECTRICAL SUBSTATION AND
ELECTRICAL PANELBOARDS AT LIMA, IQUITOS AND PUERTO
MALDONADO SITES
General Requirements for Lima, Iquitos and Puerto Maldonado
The electrical system of NAMRU-6 Lima is composed of two power transformers: 800KVA and 350KVA, a main electrical panel board for the 220V system, a main electrical panel board for the 110V system, two automatic transfer switch panel boards (one in main building and another one in the conference building), a capacitor bank panel board, small power transformers for specific locations and electrical panel boards in each building (main building or building 1, annex building or building 2, security building or building 10, procurement building or building 11, conference building or building 12, etc.). The electrical substation is located in the rear side of Building 1, in front of the perimeter wall of the compound. The main panel boards are located in the room next to the electrical substation. A copper bar connects the 800KVA transformer to the panel boards and power wires connect the 350KVA transformer to the 110V main panel boards.
The switches and circuit breakers in the substation are SM6 model DM1A, 24KV and relay SEPAM S20 and SM6 GAM2, 24KV. The brand of the transformers is I&TELECTRIC S.A.C.
The electrical room located next to the transformers vault consists of 11 panel board, two automatic transfer switches and one capacitor bank. Contractor shall provide maintenance to substation, main electrical panel boards and all panel boards of each building located inside NAMRU-6 compound in Lima.
The electrical power for the NAMRU-6 Facilities in Iquitos is obtained from the utility company ElectroOriente. The NAMRU-6 Iquitos main electrical system consists of a pole mounted electrical substation 10KVA/0.4KVA-0.23KVA that includes a 250KVA power transformer and another pole with an automatic three-phase medium-voltage electric switch or also known as a three-phase automatic circuit recloser. The registration number of NAMRU-6 main electrical system in Utility Company ElectroOriente is 100605670. The automatic transfer switch panel board and the main electrical panel board are located outside in the rear side of the administrative building next to the perimeter wall. There are also main panel boards located inside a panel room located in an area between the administrative building and the laboratory building. There are also panel boards located in each building (Administrative and laboratory building or Building IQ1, Insectary Building or IQ2, etc.). Contractor shall provide maintenance to substation, main electrical panel boards and all panel boards of each building located inside NAMRU-6 compound in Iquitos.
The electrical power for the NAMRU-6 Facilities in Puerto Maldonado Iquitos is obtained from the utility company ElectroSureste. There is not a power transformer. The utility company provides a low voltage three phase lines of 380V to the automatic transfer switch panel board.
Section J - Exhibit 11.2.2 SOP-FAC 005
The registration number of NAMRU-6 main electrical system in Utility Company ElectroSureste is 200018967. The automatic transfer switch panel board and the main electrical panel board are located in the main electrical room. There are also three distribution panel boards (TD1, TD2 and TD3) inside the facilities. Contractor shall provide maintenance to the main electrical panel boards and all panel boards located inside NAMRU-6 facilities in Puerto Maldonado.
Contractor shall provide the names and certification of the technicians performing preventive maintenance tasks. Only qualified technicians shall perform preventive and corrective maintenance tasks. All preventive maintenance tasks will be executed under technical specifications in Electrical Maintenance, electrical specifications in medium-voltage and low-voltage systems, electrical equipment and materials, with qualified personnel who will have current insurance policy (known also as SCTR) and in compliance with local occupational health and safety laws and protocols.
Contractor shall perform annual preventive maintenance activities to all of the equipment specified in this document. It is the responsibility of the contractor to perform a full inspection of the systems and collect all required information to provide a quality preventive maintenance. In addition, contractor shall review operation manuals for the equipment of the systems under this contract and include any recommended preventive maintenance activities by the manufacturer not mentioned in this document.
Contractor shall elaborate, review and update the drawings in AUTOCAD of the electrical system in Lima, Iquitos and Puerto Maldonado sites on an annual basis.
Contractor shall include all materials, tools and personal protective equipment necessary to perform preventive and corrective maintenance work. Contractor must use the necessary and appropriate equipment to delimit the work area and not allow the pedestrian traffic. The contractor’s staff shall use the appropriate PPE for the activity to perform. NAMRU-6 will not provide any materials, tools nor PPE to the contractor to perform their work.
Contractor shall perform laboratory testing of transformer’s oil. For this activity, a certified laboratory equipment will be used to measure the dielectric strength of the refrigerant oil.
Contractor shall change oil if necessary based on the results of the report. Contractor shall perform testing of the 250KVA power transformer using a certified insulation tester (megohmeter) in the 5KV range to measure the resistivity/insulation level of the core and the high and low winding of the transformer in MΩ. Contractor to perform testing of the transformer using a certified time domain reflectometer to verify any anomalies with the internal parts of the Transformix. Contractor shall perform testing of the resistivity of the ground (soil) and the medium and low voltage pits using a certified earth resistance meter.
The contractor shall provide a weekly progress report to the NAMRU-6 facilities department, as well as a completion report when completing the maintenance work to include: activities performed with pictures, recommendations, conclusion and future needed corrective maintenance tasks. When a corrective maintenance work is required, the contractor shall submit a report detailing the problem encountered, with a quotation of the solution. All reports shall be performed and signed by a local certified electrical engineer of the Peruvian college of engineers (CIP - Colegio de Ingenieros del Peru). Certified electrical engineer shall have a valid license.
The preventive maintenance work will be coordinated between NAMRU-6 facilities staff and the staff assigned by the contractor.
Contractor shall perform operational testing of the systems at the completion of each preventive maintenance work. NAMRU-6 facilities department will assign a staff to participate in the operational testing and contractor shall prepare an operational testing form (checklist) to be signed by the facilities staff once testing is perform and accepted.
It is the responsibility of the contractor to dispose properly out of NAMRU-6 facilities all consumable materials and garbage generated by the contractor during the performance of the maintenance activities.
Contractor shall pay any fees to the utility company on relation to power shutdowns and reconnection that must perform for the preventive maintenance of the substations at each site.
Contractor must coordinate with the utility company and NAMRU the date and time these activities are required. The contactor shall verify the presence of AC voltage using a non-contact voltage detector for medium-voltage applications in substations. Also, contractor must use the correct PPE while working with the voltage tester. Contractor must verify that the power lines have neither voltage nor residual current. Residual current must be discharged to the grounding system. For Iquitos, since the power transformers are mounted on a pole, the contractor shall use a crane to safely raise and/or get down power transformer to perform work during preventive maintenance. Contractor shall determine Crane capacity based on weight of equipment.
Contractor shall perform on an annual basis a network analysis of the electrical systems in all NAMRU-6 sites. More information on the requirements of the load bank test can be found at the end of this SOP, section “special requirements”.
Contractor must be aware that a scheduled power outage will last no more than 90 minutes due to the minus 80 freezers can’t be de-energized for more than 90 minutes. In addition, power outages shall be scheduled only on Saturdays. In the event a second or third power outage is required, it has to be scheduled for the following week.
Applicable codes:
The following are applicable codes for the elaboration of the preventive maintenance plan, reports and activities mentioned in this document:
NFPA 77
NFPA 70
NEC
Peruvian National Electrical Code 2006 IEEE Standards
Peruvian Building Code 2006 (RNE) IEC – International Electrotechnical Commission Local codes and regulations
Description of work required in Lima, Iquitos and Puerto Maldonado
The contractor shall perform the following preventive maintenance activities to the electrical systems in NAMRU-6 Lima:
Electrical systems – LIMA Item Sub-system Task Frequency
Switches, circuit breakers and relay - Electrical Substation
Inspect and clean all electrical equipment Annual
Switches, circuit breakers and relay - Electrical Substation
Visual Inspection of the status of the equipment. Annual
Switches, circuit breakers and relay - Electrical Substation
Visual Inspection of the Relay SEPAM and verification of the working parameters. Annual
Switches, circuit breakers and relay - Electrical Substation
Testing the operation of the breaker and switcher in SM6. Annual
Switches, circuit breakers and relay - Electrical Substation
Perform all Preventive Maintenance activities recommended by the manufacturer.
Annual
Switches, circuit breakers and relay - Electrical Substation
Inspect the adjustment of the wires, cables and copper bars. Annual
Switches, circuit breakers and relay - Electrical Substation
Inspect and clean the wires of the control panel board. Annual
Switches, circuit breakers and relay - Electrical Substation
Inspect, clean and test the battery charger of the SM6. Annual
Switches, circuit breakers and relay - Electrical Substation
Clean the floors of the transformers vault and the concrete channel of the electrical wires located below the transformers and SM6 equipment.
Annual
Transformers 800KVA and
350KVA – Electrical Substation
Inspect and clean the interior side of the enclosure of the transformers. Annual
Transformers 800KVA and
350KVA – Electrical Substation
Visual inspection of the transformers (oil leaks, etc.) Annual
Transformers 800KVA and
350KVA – Electrical Substation
Cleaning of the transformers. Annual
Transformers 800KVA and
350KVA – Electrical Substation
Inspect the adjustment of the wires and copper bars in the transformers. Annual
Transformers 800KVA and
350KVA – Electrical Substation
Inspect and measure the grounding system of the transformers. Annual
Transformers 800KVA and
350KVA – Electrical Substation
Test the oil of the transformers: Physic- Chemic analysis. Annual
Transformers 800KVA and
350KVA – Electrical Substation
Testing of the insulation resistant. Annual
Transformers 800KVA and
350KVA – Electrical Substation
Testing the voltage ratio of the transformer. Annual
Transformers 800KVA and
350KVA – Electrical Substation
Thermo-graphic analysis of the transformer using thermo-graphic equipment.
Annual
Transformers 800KVA and
350KVA – Electrical Substation
Clean the floors of the transformers vault and the concrete channel of the electrical wires located below the transformers and SM6 equipment.
Annual
Transformers 800KVA and
350KVA – Electrical Substation
Inspect and clean the dehumidifiers of the transformers. Annual
21 Main panel boards and automatic transfer switches
Identify and label all electrical panel boards as specified in the electrical drawings.
Annual
22 Main panel boards and automatic transfer switches
Inspect all signs in panel boards and replace if necessary. Annual
23 Main panel boards and automatic transfer switches
Verify all reserve spaces have covers in the electrical panel boards. Provide and install new covers.
Annual
24 Main panel boards and automatic transfer switches
Inspect the connection of the grounding system in the panel boards and adjust if necessary.
Annual
25 Main panel boards and automatic transfer switches
Verify the correct dimension of the wires and electrical cables of each circuit in the panel boards and recommend corrections if necessary. Also, verify the loads in each circuit and regulate the relay to operate following selectivity criteria.
Annual
26 Main panel boards and automatic transfer switches
Inspect the breakers of the electrical outlets circuits and recommend the use of GFCI if necessary.
Annual
27 Main panel boards and automatic transfer switches
Inspect the light voltage indicator in the panel boards. Annual
28 Main panel boards and automatic transfer switches
Testing the insulation of the wires and electrical cables. Annual
29 Main panel boards and automatic transfer switches
Check working temperatures of the breakers and electrical wires are the recommended by the manufacturer.
Annual
30 Main panel boards and automatic transfer switches
Mechanical testing of the operation of the breakers of all panel boards. Annual
31 Main panel boards and automatic transfer switches
Review and upgrade the one-line diagram according to the current configuration of the main electrical room. Provide updated CAD drawings.
Annual
32 Main panel boards and automatic transfer switches
Inspect and clean the enclosures of all panel boards. Annual
33 Main panel boards and automatic transfer switches
Inspect the adjustment of all wires and all bars (active lines, neutral and grounding) in the panel boards.
Annual
34 Main panel boards and automatic transfer switches
Testing of the Automatic transfer switch following the procedures of operation of the manufacturer.
Annual
35 Main panel boards and automatic transfer switches
Inspect and clean the capacitor bank.
Verify if the capacitor bank is working according to the recommendations of the manufacturer.
Annual
All other electrical panel boards in any building inside NAMRU-6 compound Inspection and cleaning of exterior panel Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Inspection and cleaning of interior panel and devices Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Inspection and tighten of all electrical connections inside the panel Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Check and install missing labels of wires and breakers Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Provide and replace new signs and labels mounted in the panels Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Check and provide missing electrical drawings and/or circuit’s description card in the panels
Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Verify all reserve spaces have covers in the electrical panel boards. Provide and install new covers.
Annual
43 Grounding system of substation
Perform maintenance to all grounding pits (medium and low voltage) Annual
44 Grounding system of substation
Perform testing to grounding system using a certified tellurometer. A certified engineer by the college of engineers of Peru shall sign grounding testing report.
systems in NAMRU-6 Iquitos:
Electrical systems – IQUITOS Item Sub-system Task Frequency
Switches, cutouts and circuit breakers - Electrical Substation
Visual verification of the shutdown of the Medium Voltage Service. Annual
Switches, circuit breakers and relay - Electrical Substation
Inspect and clean all electrical equipment Annual
Switches, circuit breakers and relay - Electrical Substation
Visual Inspection of the status of the equipment. Annual
Switches, circuit breakers and relay - Electrical Substation
Visual Inspection of the relay and verification of the working parameters. Annual
Switches, circuit breakers and relay - Electrical Substation
Perform all Preventive Maintenance activities recommended by the manufacturer.
Annual
Switches, circuit breakers and relay - Electrical Substation
Connect to ground/earth the medium voltage line and the Power transformer. Annual
Switches, circuit breakers and relay - Electrical Substation
Inspect and clean the wires of the control panel board. Annual
Switches, circuit breakers and relay - Electrical Substation
Inspection, cleaning and adjustments of the Cutouts. Annual
Switches, circuit breakers and relay - Electrical Substation
Inspect and clean the wires of the control panel board. Annual
Switches, circuit breakers and relay - Electrical Substation
Disconnection of the medium voltage lines and complete disassembly of the 250 KVA power transformer.
Annual
11 Transformer 250KVA – Electrical Substation
Preventive maintenance of the 250 KVA Power Transformer with built-in transformix, consists of: Cleaning of cooling dielectric oil from the electrical winding, change of all the gaskets of the transformer tank, change of the medium and Low Voltage bushing packing’s, refilling of the SS25 refrigerant dielectric oil. Mounting and reinstallation/assembly of the 250kva Power transformer.
Annual
12 Transformer 250KVA – Electrical Substation
Visual inspection of the transformers (oil leaks, etc.) Annual
13 Transformer 250KVA – Electrical Substation Cleaning of the transformers. Annual
14 Transformer 250KVA – Electrical Substation
Inspect the adjustment of the wires and copper bars in the transformers. Annual
15 Transformer 250KVA – Electrical Substation
Inspect and measure the grounding system of the transformers. Annual
16 Transformer 250KVA – Electrical Substation
Test the oil of the transformers: Physic- Chemic analysis. Annual
17 Transformer 250KVA – Electrical Substation Testing of the insulation resistant. Annual
18 Transformer 250KVA – Electrical Substation
Testing the voltage ratio of the transformer. Annual
19 Transformer 250KVA – Electrical Substation
Thermo-graphic analysis of the transformer using thermo-graphic equipment.
20 Transformer 250KVA – Electrical Substation
Clean the floors of the transformers vault and the concrete channel of the electrical wires located below the transformers and SM6 equipment.
Annual
21 Transformer 250KVA – Electrical Substation
Inspect and clean the dehumidifiers of the transformers. Annual
22 Transformer 250KVA – Electrical Substation
Inspect and clean the Recloser and accessories. Perform maintenance as recommended by manufacturer.
Annual
23 Main panel boards and automatic transfer switch
Identify and label all electrical panel boards as specified in the electrical drawings.
Annual
24 Main panel boards and automatic transfer switch
Inspect all signs in panel boards and replace if necessary. Annual
25 Main panel boards and automatic transfer switch
Verify all reserve spaces have covers in the electrical panel boards. Provide and install new covers.
Annual
26 Main panel boards and automatic transfer switch
Inspect the connection of the grounding system in the panel boards and adjust if necessary.
Annual
27 Main panel boards and automatic transfer switch
Verify the correct dimension of the wires and electrical cables of each circuit in the panel boards and recommend corrections if necessary. Also, verify the loads in each circuit and regulate the relay to operate following selectivity criteria.
Annual
28 Main panel boards and automatic transfer switch
Inspect the breakers of the electrical outlets circuits and recommend the use of GFCI if necessary.
Annual
29 Main panel boards and automatic transfer switch
Inspect the light voltage indicator in the panel boards. Annual
30 Main panel boards and automatic transfer switch
Testing the insulation of the wires and electrical cables. Annual
31 Main panel boards and automatic transfer switch
Check working temperatures of the breakers and electrical wires are the recommended by the manufacturer.
Annual
32 Main panel boards and automatic transfer switch
Mechanical testing of the operation of the breakers of all panel boards. Annual
33 Main panel boards and automatic transfer switch
Review and upgrade the one-line diagram according to the current configuration of the main electrical room. Provide updated CAD drawings.
Annual
34 Main panel boards and automatic transfer switch
Inspect and clean the enclosures of all panel boards. Annual
35 Main panel boards and automatic transfer switch
Inspect the adjustment of all wires and all bars (active lines, neutral and grounding) in the panel boards.
Annual
36 Main panel boards and automatic transfer switch
Testing of the Automatic transfer switch following the procedures of operation of the manufacturer.
Annual
All other electrical panel boards in any building inside NAMRU-6 compound Inspection and cleaning of exterior panel Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Inspection and cleaning of interior panel and devices Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Inspection and tighten of all electrical connections inside the panel Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Check and install missing labels of wires and breakers Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Provide and replace new signs and labels mounted in the panels Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Check and provide missing electrical drawings and/or circuit’s description card in the panels
Annual
43 Grounding system of substation
Perform maintenance to all grounding pits (medium and low voltage) Annual
44 Grounding system of substation
Perform testing to grounding system using a certified tellurometer. A certified engineer by the college of engineers of systems in NAMRU-6 Puerto Maldonado:
Electrical systems – PUERTO MALDONADO Item Sub-system Task Frequency
1 Main panel boards and automatic transfer switch
Identify and label all electrical panel boards as specified in the electrical drawings.
Annual
2 Main panel boards and automatic transfer switch
Inspect all signs in panel boards and replace if necessary. Annual
3 Main panel boards and automatic transfer switch
Verify all reserve spaces have covers in the electrical panel boards. Provide and install new covers.
Annual
4 Main panel boards and automatic transfer switch
Inspect the connection of the grounding system in the panel boards and adjust if necessary.
Annual
5 Main panel boards and automatic transfer switch
Verify the correct dimension of the wires and electrical cables of each circuit in the panel boards and recommend corrections if necessary. Also, verify the loads in each circuit and regulate the relay to operate following selectivity criteria.
Annual
6 Main panel boards and automatic transfer switch
Inspect the breakers of the electrical outlets circuits and recommend the use of GFCI if necessary.
Annual
7 Main panel boards and automatic transfer switch
Inspect the light voltage indicator in the panel boards. Annual
8 Main panel boards and automatic transfer switch
Testing the insulation of the wires and electrical cables. Annual
9 Main panel boards and automatic transfer switches
Check working temperatures of the breakers and electrical wires are the recommended by the manufacturer.
Annual
10 Main panel boards and automatic transfer switches
Mechanical testing of the operation of the breakers of all panel boards. Annual
11 Main panel boards and automatic transfer switch
Review and upgrade the one-line diagram according to the current configuration of the main electrical room. Provide updated CAD drawings.
Annual
12 Main panel boards and automatic transfer switch
Inspect and clean the enclosures of all panel boards. Annual
13 Main panel boards and automatic transfer switch
Inspect the adjustment of all wires and all bars (active lines, neutral and grounding) in the panel boards.
Annual
14 Main panel boards and automatic transfer switch
Testing of the Automatic transfer switch following the procedures of operation of the manufacturer.
Annual
All other electrical panel boards in any building inside NAMRU-6 compound Inspection and cleaning of exterior panel Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Inspection and cleaning of interior panel and devices Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Inspection and tighten of all electrical connections inside the panel Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Check and install missing labels of wires and breakers Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Provide and replace new signs and labels mounted in the panels Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Check and provide missing electrical drawings and/or circuit’s description card in the panels
Annual
All other electrical panel boards in any building inside NAMRU-6 compound
Verify all reserve spaces have covers in the electrical panel boards. Provide and install new covers.
Annual
22 Grounding system of substation
Perform maintenance to all grounding pits (medium and low voltage) Annual
23 Grounding system of substation
Perform testing to grounding system using a certified tellurometer. A certified engineer by the college of engineers of
Contractor will also include requirements per O&M manuals and any additional requirements not mentioned in this document but required or recommended by manufacturer as preventive maintenance activities to perform quarterly or annually at all sites.
SPECIAL REQUIREMENTS
Network Analysis of Main Panels
Contractor must perform a network analysis of the NAMRU6 electric systems in order to verify the following:
- Power Quality Analysis
- Load Analysis
- Harmonic Analysis
- Voltage fluctuations
The analysis must be performed following the criteria or recommendations per IEC 61000-4-30 with a network analyzer class A. Recommendations provided in IEEE 1150-1995 must also be followed. The network analyzer must have a valid certification previous to the execution of work.
The analysis in Lima shall be performed by connecting the network analyzer in the NAMRU6 electric system for a week in the 110V and a week in the 220V system. In Iquitos and Puerto
Maldonado, the network analyzer will be connected to the main electrical panel for a week. The contractor must provide a final report with the minimum following information:
- Active and Reactive power graph
- Power factor graph
- Phase balancing graph
- Power Quality graph
- Voltage and Current graph
- Harmonic distortion graph
- Troubleshooting during measurements of electric parameters
- Recommendations for energy efficiency based on measurements performed. Each recommendation must include a cost estimate in order to execute it.
Contractor must perform an assessment of the electric billing rate category in each site using the values obtained from the network analysis in order to verify if the billing rate category registered in the utility company is the most adequate for NAMRU6 or requires a change based on the power load and analysis performed. This assessment, recommendations and report shall be performed and signed by a local certified electrical engineer of the Peruvian college of engineers (CIP - Colegio de Ingenieros del Peru). Certified electrical engineer shall have a valid license.
ADDITIONAL INFORMATION
ANNEX 1: 2020 PREVENTIVE MAINTENANCE TO SUBSTATION AND ELECTRICAL PANEL
BOARDS IN LIMA
ANNEX 2: 2020 PREVENTIVE MAINTENANCE TO SUBSTATION AND ELECTRICAL PANEL
BOARDS IN IQUITOS
ANNEX 3: 2018 PREVENTIVE MAINTENANCE TO ELECTRICAL PANEL BOARDS IN
PUERTO MALDONADO
ANNEX 4: ONE-LINE DIAGRAM OF ELECTRICAL SYSTEM IN LIMA
ANNEX 5: ONE-LINE DIAGRAM OF ELECTRICAL SYSTEM IN IQUITOS
ANNEX 6: ONE-LINE DIAGRAM OF ELECTRICAL SYSTEM IN PUERTO MALDONADO
ANNEX 7: 2020 NETWORK ANALYSIS OF MAIN PANELS IN LIMA
ANNEX 1
AAI & NETWORK S.A.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
MANTENIMIENTO
DE LAS REDES ELECTRICAS
EN BAJA TENSION
NAMRU – 6
FEBRERO 2021
mailto:jg@aainetwork.net
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
INFORME Nº01021
CLIENTE : NAMRU6.
UBICACIÓN : HOSPITAL NAVAL.
ATENCIÓN : ING. RONY FERNANDEZ.
ASUNTO : MANTENIMIENTO ANUAL DE LA SE Y T.B.T.
FECHA : 15 DE FEBRERO DEL 2021.
EJEC./ RESP. : ING. V. ALEXANDER GUTIERREZ C. - CIP N° 141743.
APROBADO : ING. J. JESUS GUTIERREZ P. -CIP 65842
REF. : INFNAM15 / PRENAM90.
1.- ANTECEDENTES:
1.1.- El 28 de enero del 2021 se inició el mantenimiento ANUAL de la Subestación
Eléctrica y Tableros Generales en Baja Tensión, previa coordinación con el
Departamento de Mantenimiento.
2.- MANTENIMIENTO DE LA SUBESTACION ELECTRICA EN 10 kV:
2.1.- Revisión visual de la Celda de Protección en Media Tensión SM6 modelo DM1A, 24KV con relé de SEPAM S20 y Celda de Remonte SM6 GAM2, 24KV:
2.2.- Revisión visual del transformador en aceite marca I&TELECTRIC S.A.C. de
800KVA:
2.3.- Revisión visual del transformador en aceite marca I&TELECTRIC S.A.C. de
350KVA:
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
3.- MANTENIMIENTO DE TABLEROS GENERALES DE BAJA TENSION EN 220
VOLTIOS DE LA TORRE 1:
3.1.- PANEL CAPACITOR BANK.
OBSERVACIONES:
3.1.1.- Falta esquema de las etapas y funcionamiento.
3.2.2.- El equipo de control de la energía reactiva registra valor inadecuado.
3.1.3.- La tapa del equipo de control se encuentra roto.
3.1.4.- El alimentador a la barra a tierra es de color BLANCO y viene de la barra a tierra del PANEL ATS-220 V (CUERPO 1), conectado en un borne de soporte. La barra tiene cables de diferentes colores, blanco, verde y verde-amarillo.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
3.1.5.- El tablero tiene un cable vulcanizado NO AUTORIZADO para instalaciones eléctricas por no ser libre de Alógeno.
3.2.- PANEL ATS-220 V (CUERPO 1).
3.2.1.- No tiene rotulo los interruptores, ni directorio y ni esquema de funcionamiento.
3.2.2.- El cable de color BLANCO mostrado es el cable de salida que alimenta a la barra de tierra del PANEL CAPACITOR BANK y está conectado a un borne de soporte NO RECOMENDADO. Este PANEL no tiene alimentador a la barra a tierra.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
3.2.3.- El aterrado de la puerta es FALSA no llega a la barra a tierra y a este le falta un perno en el borne de soporte. Los mandiles no están aterrados.
3.3.- PANEL ATS-220 V (CUERPO 2).
3.3.1.- No tiene rotulo el interruptor.
3.3.2.- No está aterrado los mandiles.
3.3.3.- Verificar el cable alimentador de la barra a tierra.
3.3.4.- El aterrado de la puerta es FALSA no llega a la barra a tierra.
3.4.- PANEL ATS-220 V (CUERPO 3).
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
OBSERVACIONES:
3.4.1.- No tienen rotulo los interruptores.
3.4.2.- La barra a tierra está enlazando los 3 paneles, esto NO ES RECOMENDADO por el CNE y faltándole un perno de contacto.
3.4.3.- Este PANEL no tiene alimentador a la barra a tierra.
3.4.4.- No está aterrado los mandiles, el aterrado de la puerta es FALSA no llega a la barra a tierra
3.5.- PANEL MN-220 V (CUERPO 1).
3.5.1.- La rotulación no es la adecuada y No tiene directorio.
3.5.2.- La barra a tierra tiene alimentadores señalizados de diferentes colores NO
RECOMENDADO por el CNE.
3.5.3.- Encontramos una línea a tierra conectada a masa del tablero NO
3.5.4.- No está aterrado el mandil ni la puerta.
3.6.- PANEL MN-220 V (CUERPO 2).
3.6.1.- No tiene directorio.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
3.6.2.- El PANEL tiene cables vulcanizados NO AUTORIZADO para instalaciones eléctricas por no ser libre de Alógeno.
3.6.3.- No está aterrado el mandil y el cable del aterramiento de la puerta son de diferente color, NO RECOMENDADO por el CNE.
3.6.4.- La barra a tierra está enlazando los 2 paneles esto NO ES RECOMENDADO por el CNE, verificar sus cables ya que está señalizado con diferentes colores.
3.6.5.- A la barra a tierra le falta un perno de contacto.
3.6.6.- Encontramos perno flojo y una tuerca en la base.
3.6.7.- El interruptor de manija ROJA con candado, debe ser un circuito importante, faltaría una señalización de NO TOCAR POR NINGUN MOTIVO.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
3.7.- PANEL MN-1 (CUERPO 1).
3.7.1.- No tiene directorio.
3.7.2.- El mandil no está aterrado.
3.7.3.- El cable alimentador de la barra a tierra viene de la barra a tierra del PANEL
220-V (CUERPO 2).
3.7.4.- La barra a tierra tiene cables de diferentes colores NO RECOMENDADOS por el CNE y un punto de conexión tiene 3 cables.
3.7.5.- El soporte de la barra a tierra no es el adecuado por encontrarse flojo. El cable de línea a tierra que está conectado en el borne de sujeción de la barra, alimenta al PANEL MN-1(CUERPO 2).
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
3.8.- PANEL MN-1 (CUERPO 2).
3.8.1.- No tiene directorio.
3.8.2.- El calado del mandil con respecto a la base de la manija del interruptor está descentrado.
3.8.3.- Circuito que no tiene terminales, sus hilos se encuentran sueltos en
PELIGRO.
3.8.4.- El mandil no está aterrado y la línea a tierra son de diferentes colores.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
3.8.5.- La línea a tierra sin terminal, 3 cables en un mismo punto de la barra a tierra y los soportes de la barra a tierra no es el adecuado.
3.8.6.- La línea a tierra que alimenta a la barra a tierra de este panel viene de la barra a tierra del PANEL MN-1(CUERPO 1).
3.9.- PANEL SP 220 V.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
OBSERVACIONES:
3.9.1.- No tiene directorio.
3.9.2.- El aterramiento de la puerta es de color verde-amarillo y del mandil se encontró DESCONECTADO.
3.9.3.- Existe línea a tierra FALSO y en la tubería Conduit le falta su BUSHING.
3.9.4.- En la barra de tierra existen cables de diferentes colores, NO
3.10.- PANEL LIGHTING SWITCHBOARD.
3.10.1.- No tiene directorio.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
3.10.2.- No tiene aterramiento el mandil ni la puerta.
3.10.3.- Existe señal de un corto circuito.
3.10.4.- Existen cables de línea principal sin terminales.
3.10.5.- Existen cables de línea a tierra sin terminales.
3.11.- PANEL ATS 120 : 208 VOLTIOS
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
OBSERVACIONES:
3.11.1.- No tiene rotulo los interruptores, ni directorio y ni esquema de funcionamiento.
3.11.2.- No está aterrado el mandil ni la puerta
3.11.3.- El panel no tiene barra a tierra, en la barra a NEUTRO en un mismo punto existe 2 cables conectados y es de color amarillo.
3.11.4.- Existen circuitos sin terminales.
3.11.5.- La manija del mandil no es el adecuado.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
3.12.- PANEL MS-208 V.
3.12.1.- No tiene directorio.
3.12.2.- El calado del mandil con respecto a la base de la manija de los interruptores está descentrado.
3.12.3.- El aterramiento de la puerta es FALSA.
3.12.4.- No tiene aterramiento el mandil.
3.12.5.- La barra a tierra quedó pequeña y no tiene aislador, infringe lo siguiente:
- Tiene cables de varios colores.
- Existen 2 cables en un mismo punto.
- Verificar si el cable señalizado de blanco es del NEUTRO.
3.12.6.- Existen cables sin terminales en algunas conexiones.
3.12.7.- En la barra NEUTRA existe cable cortado sin protección y sin terminales.
Los cables de la línea NEUTRA no están identificados.
3.13.- PANEL LAB PORTABLE.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
OBSERVACIONES:
3.13.1.- No tiene directorio.
3.13.2.- No tiene aterramiento el mandil ni la puerta.
3.13.3.- No tiene protección termo retráctil las barras con energía.
3.13.4.- La barra a tierra está inaccesible y sin aislador.
3.13.5.- La barra NEUTRO es pequeña, los terminales no tienen buen contacto.
4.- MANTENIMIENTO DE TABLEROS GENERALES DE BAJA TENSION EN 220
VOLTIOS DE LA TORRE 2:
4.1.- PANEL TG3.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
4.1.1.- En las tuberías Conduit falta sus BUSHING.
4.1.2.- Algunos circuitos no tienen terminales.
4.1.3.- No tiene aterramiento los mandiles.
4.1.4.- Existen 2 circuitos en un borne de un interruptor y sin terminales.
4.1.5.- No hay orden en los tendidos de cables
4.1.6.- Circuitos sin terminales y cuando anulan un circuito, deben de retirar el cable.
4.1.7.- Barra principal quiñada y sin protección termo retráctil.
4.1.8.- Existen cables sin terminales con falsos contactos, pueden ocasionar un
CALENTAMIENTO en el borne luego CORTO CIRCUITO.
4.1.9.- Existen cables con terminales mal elegidos y mal instalados con falsos contactos, pueden ocasionar un CALENTAMIENTO en el borne luego
CORTO CIRCUITO.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
4.2.- PANEL TG4.
4.2.1.- En las tuberías Conduit falta sus BUSHING.
4.2.2.- Algunos circuitos no tienen terminales.
4.2.3.- No tiene aterramiento los mandiles.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
E-mail: jg@aainetwork.net
4.2.4.- La barra NEUTRA, infringe lo siguiente:
- Tiene cables de varios colores.
- Existen 2 cables en un mismo punto.
- Verificar si el cable señalizado de blanco es del NEUTRO.
- Tienen cables sin terminales.
- No está señalizado a que circuito pertenece.
La barra a tierra, infringe lo siguiente:
- Tiene cables de varios colores, hay hasta de color azul.
- Existen 2 cables en un mismo punto.
- Tienen cables sin terminales.
4.2.5.- Barra principal sin protección termo retráctil.
Urb. Santa Rosa D-4 Los Olivos, Teléfonos 531-1004 - 994 165 054
4.3.- LIGHT CONTROL PANEL.
4.3.1.- El aterramiento de la puerta es FALSO.
4.3.2.- No tiene directorio o esquema de control.
4.3.3.- Los cables no tienen terminales.
4.3.4.- La barra a tierra tiene cables de salida sin terminales y no tiene alimentador.
Atentamente.
Ing. J. Jesús Gutierrez P.
Gerente General
A.A.I. & NETWORK S.A.
ANNEX 2
Ω GRUPO A.B.
Servicio Generales Soluciones en Electricidad Proyectos y Construcciones
RUC 10053530694
Urb. Juan Pablo II
Md. 14 Dpto. 202
Cel. 965990103 aldobt46@hotmail.com
“AÑO DE LA UNIVERSALIZACIÓN DE LA SALUD”
INF. 00163 A.B. – Namru6 - 2020
Iquitos. 23 de octubre del 2020
Sres.:
Embajada American NAMRU- 6 Departamento de Mantenimiento.
Referencia: Orden de Compra # N4485220P0088.
Calle Trujillo/ Av. La Marina 951
ASUNTO: Informe de mantenimiento preventivo anual a la sub estación aérea biposte de 20kVA con tranformix incorporado y pozos a tierra.
De mi especial consideración:
Es grato dirigirnos a usted para saludarles y así mismo hacerles llegar el Informe, por el siguiente Servicio de Mantenimiento de la Sub Estación Aérea Biposte. Con Transformador de
Potencia de 250KVA. Trafomix incorporado, Sistema de Protección Pararrayos y Pozos a
Tierra.
OBJETIVO
Garantizar y mantener en correctas condiciones funcionales la sub estación Aérea Biposte con
Transformador de Potencia de 250KVA. De nuestro cliente, Para ello, se deberá efectuar el mantenimiento correctivo, preventivo y dejar en buen estado los dispositivos y componentes, con el fin de satisfacer las necesidades del cliente, dentro de la calidad y Plazo establecido y
Ejecutar en cada visita las tareas de limpieza, ajustes y mediciones para garantizar la continuidad y confiabilidad.
METAS
Garantizar la continuidad del servicio de mantenimiento de la Sub Estación Aérea Biposte de
250kva, sin problemas de caídas o paradas de trabajo, de los dispositivos y componentes, para un continuo servicio de corriente en las Oficinas Administrativas y áreas en general del local.
1. Actividades antes de la ejecución.
Se realizó una inspección visual de reconocimiento en el lugar donde está instalada la Sub Estación Biposte, para coordinar la hora y el momento de realizar los trabajos de mantenimiento. (Se coordinó la hora y el día de trabajo con el personal técnico -operador de la oficina encargado de operaciones).
Se Realizó el corte visible del servicio de alta tensión, previa coordinación con la
Concesionaria Electro oriente S.A. y al finalizar los Trabajos de Reconexión.
Aterramiento de la Línea en media Tensión y del Transformador de Potencia.
Camión grúa para el desmontaje del equipo transformador, y se realizara el mantenimiento correctivo en mismo lugar, se acondicionara y se cercara con cinta de aviso el área de trabajo.
Los trabajos se realizaron bajo especificaciones técnicas en Mantenimiento Eléctrico en alta y baja tensión de Equipos de Transformadores y materiales eléctricos, con personal calificado.
Trabajos ejecutados con fotos:
Corte del servicio en seccionamiento por la empresa concesionaria (E.O.S.A.) en Corte del servicio en Alta Tensión (10 – 0.4 – 0,23 KV.) y aterramiento de las Líneas de Media Tensión (7.00am.)
Seccionamiento y Desconexión de las líneas de Media Tensión del Transformador de Potencia de 250Kva. Y tripeado de llave general de tablero.
Desconexión de las líneas de distribución del transformador de Potencia de 250Kva.
Desmontaje del transformador de Potencia de 250Kva con Transformix Incorporado
Cambio de Aceite Dieléctrico de Transformador de Potencia de 250 KVA con Transformix incorporado, que consta de:
- Depurado del todo el aceite dieléctrico refrigerante del bobinado eléctrico.
- Cambio de todas las empaquetaduras de la cuba del transformador.
- Cambio de las empaquetaduras del Bushing de Alta y Baja Tensión.
- Relleno de total de aceite dieléctrico Refrigerante SS25.
- Isaje y/o Montaje del transformador de Potencia de 250kva.
Depurado de todo el aceite dieléctrico refrigerante usado del bobinado eléctrico.
Izaje y mantenimiento al bobinado del Transformix con Solvente dieléctrico
Cambio de todas las empaquetaduras de los aisladores de alta y baja tensión
Mantenimiento de todos de los aisladores de alta y baja tensión del transformador
Relleno total de aceite Dieléctrico Refrigerante SS25 al transformador
Izaje y/o montaje de Transformador de Potencia de 250Kva
Conexión de líneas de media tensión en transformador y líneas de distribución – líneas a Tierra en Pararrayos y transformador
Seccionamiento por la empresa concesionaria (E.O.S.A.) en media tensión 3.21Pm.
PRUEBAS ELECTRICAS DE RESISTENCIA DE LOS POZOS A TIERRA DE ALTA Y
BAJA TENSIÓN DE LA SUB ESTACION AEREA BIPOSTE.
RESISTENCIA DE POZOS A TIERRA (antes del mantenimiento):
POZO A TIERRA DE MEDIA TENSION
Prueba 1 = 7,23 Ohm.
Prueba 2 = 7,24 Ohm.
POZO A TIERRA DE BAJA TENSION:
Prueba 1 = 6,96 Ohm.
Prueba 2 = 6,97 Ohm.
RESISTENCIA DE POZOS A TIERRA (después del Mantenimiento)
POZO A TIERRA DE MEDIA TENSION
Prueba 1 = 4,97 Ohm.
Prueba 2 = 4,97 Ohm.
POZO A TIERRA DE BAJA TENSION:
Prueba 1 = 4,71 Ohm.
Prueba 2 = 4,71 Ohm.
Mantenimiento de 02 pozos a Tierra
PRUEBAS ELECTRICAS DE TRANSFORMADOR DE DISTRIBUCION, DE 250 KVA
Y TRAFOMIX INCORPORADO
MEDICIONES Y PRUEBAS DEL TRANSFORMADOR
Nombre: NAMRU 06 Suministro: 100649098
Dirección: Av. La Marina 951/ Trujillo
MASA + AT VALORES TAPS- 10,000
U + MASA 7,11 G.Ω.
EN 5 KV
V + MASA 7,87 G.Ω. 1.- 10500
W + MASA 7,89 G.Ω 2.- 10250
MASA + BT VALORES 3.- 10000
U + MASA 12,9 G.Ω
EN 2,5 KV
4.- 9750
V + MASA 13,0 G.Ω 5.- 9500
W + MASA 13,0 G.Ω
AT + BT VALORES BAJA TENSION
U + MASA 10,18 G.Ω
EN 5 KV 3 X 220 v. V + MASA 10,1 G.Ω
W + MASA 10,3 G.Ω
DATOS DE PLACA DEL TRANSFORMADOR
MARCA: RESELEC SERIE 4011
AÑO 2005
MODELO TCI T.C.C. 4,21
POTENCIA 250 KVA N° TAPS 5
GRUPO DE
CONEXIÓN DD6 POS. TAP
I-CORRIENTE 14,4 AMP. FASES 3
REL. TENSION 10-0,23 KV PESO TOTAL 1345 kg.
OBSERVACION:
El mantenimiento de los dos pozos, se dejó en forma vertical con una profundidad de 1.80mt. Dejando con la medición en ohm más de lo recomendado y se realizó el mantenimiento en el interior del local.
Se recomienda en el próximo mantenimiento Cambio de tablero general aéreo, por tener poco espacio para los cables de fuerza y no se puede manipular internamente.
Cambio de cables de bajada del trasformador al tablero, por cable NYY 3X1X240mm2.
El mantenimiento del transformador y los pozos a tierra se debe realizarlo cada 12.
Meses.
Sin más en particular y agradeciéndoles por su pronta atención, se suscribe de ustedes.
Atte.:
Gerente técnico
SERVICIOS GENERALES
Grupo A.B
RUC: 10053530694
CEL. 965990301
aldobt46@hotmail.com
ANNEX 3
Servicio :
Nombre:
Segun:
Fecha:
Provincia: Dpto.: MADRE DE DIOS
ELABORACIÓN DE PLANOS DE
INSTALACIONES ELÉCTRICAS, INSPECCIÓN
TÉCNICA, DIAGNOSTICO Y ELABORACION
DE CUADRO DE CARGA
ELABORACIÓN DE PLANOS DE I.
E., INSPECCIÓN TÉCNICA,
DIAGNOSTICO Y ELABORACION DE
CUADRO DE CARGA
EMBAJAD DE LOS
ESTADOS UNIDOS DE
AMERICA NAMRU-6
SERVICIOS Y SUMINISTROS Nº
19PE5018P1100
30-04-2018
Ubicación Jr. Cusco C-14, Centro de la Villa Naval Casa 15 y 16, de Puerto Maldonado, Distrito y Provincia de
Tambopata del Departamento de Madre de Dios.
IMAGEN DEL TABLERO DE TRANSFERENCIA, EN PERFECTAS CONDICIONES IMAGEN FINAL DEL TABLERO DEL UPS, EN BUEN ESTADO
Distrito: TAMBOPATA TAMBOPATA
REPORTE FOTOGRAFICO
ALBERGUE REFUGIO AMAZONAS
PARTIDA Nº 01: Evaluación técnica de Tableros de Distribución y Balanceo de Cargas: en la visita realizada
IMAGEN DEL TABLERO GENERAL DE DISTRIBUCION, TABLERO DE TRANSFERENCIA Y
TABLERO DEL UPS EN BUENAS CONDICIONES
IMAGEN DEL CONEXIONADO DEL TABLERO GENERAL DE DISTRIBUCION, EN BUEN
ESTADO, TERNIMALES BIEN PRENSADOS Y BIEN AJUSTADOS
Segun:
Fecha:
Provincia: Dpto.: MADRE DE DIOS
ELABORACIÓN DE PLANOS DE
INSTALACIONES ELÉCTRICAS, INSPECCIÓN
TÉCNICA, DIAGNOSTICO Y ELABORACION
DE CUADRO DE CARGA
ELABORACIÓN DE PLANOS DE I.
E., INSPECCIÓN TÉCNICA,
DIAGNOSTICO Y ELABORACION DE
CUADRO DE CARGA
EMBAJAD DE LOS
ESTADOS UNIDOS DE
AMERICA NAMRU-6
SERVICIOS Y SUMINISTROS Nº
19PE5018P1100
30-04-2018
Ubicación Jr. Cusco C-14, Centro de la Villa Naval Casa 15 y 16, de Puerto Maldonado, Distrito y Provincia de
Tambopata del Departamento de Madre de Dios.
Distrito: TAMBOPATA TAMBOPATA
IMAGEN DEL MODULO DONDE SE PUEDE APRECIAR QUE LA FASE R SE ENCUENTRA
SOBRECARGADA
MEDICION DE CORRIENTE EN LA FASE "R"
MEDICION DE CORRIENTE HOMOPOLAR, LA MISMA QUE SE ENCUENTRA EN
CONDICIONES NORMALES
MEDICION DE CORRIENTE EN LA FASE "S"
MEDICION DE CORRIENTE EN HORA PUNTA MEDICION DE CORRIENTE EN LA FASE "T"
Mediciones de Corriente en el tablero general de distribucion
Segun:
Fecha:
Provincia: Dpto.: MADRE DE DIOS
ELABORACIÓN DE PLANOS DE
INSTALACIONES ELÉCTRICAS, INSPECCIÓN
TÉCNICA, DIAGNOSTICO Y ELABORACION
DE CUADRO DE CARGA
ELABORACIÓN DE PLANOS DE I.
E., INSPECCIÓN TÉCNICA,
DIAGNOSTICO Y ELABORACION DE
CUADRO DE CARGA
EMBAJAD DE LOS
ESTADOS UNIDOS DE
AMERICA NAMRU-6
SERVICIOS Y SUMINISTROS Nº
19PE5018P1100
30-04-2018
Ubicación Jr. Cusco C-14, Centro de la Villa Naval Casa 15 y 16, de Puerto Maldonado, Distrito y Provincia de
Tambopata del Departamento de Madre de Dios.
Distrito: TAMBOPATA TAMBOPATA
MEDICION DE TENSION ENTRE FASE "S Y N" 216V
MEDICION DE TENSION ENTRE FASE "S Y N" 220V, TENSION YA CORREGIDA POR EL
TRANSFORMADOR
MEDICION DE TENSION ENTRE FASE "T Y N" 204V, EXISTE MALA CALIDAD DE
PRODUCTO POR PARTE DE LA CONCESIONARIA
MEDICION DE TENSION ENTRE FASE "T Y N" 220V, TENSION YA CORREGIDA POR EL
TRANSFORMADOR
Mediciones de tension en el tablero general de distribucion
MEDICION DE TENSION ENTRE FASE "R Y N" 212V
MEDICION DE TENSION ENTRE FASE "R Y N" 221V, TENSION YA CORREGIDA POR EL
TRANSFORMADOR
Segun:
Fecha:
Provincia: Dpto.: MADRE DE DIOS
ELABORACIÓN DE PLANOS DE
INSTALACIONES ELÉCTRICAS, INSPECCIÓN
TÉCNICA, DIAGNOSTICO Y ELABORACION
DE CUADRO DE CARGA
ELABORACIÓN DE PLANOS DE I.
E., INSPECCIÓN TÉCNICA,
DIAGNOSTICO Y ELABORACION DE
CUADRO DE CARGA
EMBAJAD DE LOS
ESTADOS UNIDOS DE
AMERICA NAMRU-6
SERVICIOS Y SUMINISTROS Nº
19PE5018P1100
30-04-2018
Ubicación Jr. Cusco C-14, Centro de la Villa Naval Casa 15 y 16, de Puerto Maldonado, Distrito y Provincia de
Tambopata del Departamento de Madre de Dios.
Distrito: TAMBOPATA TAMBOPATA
PARTIDA Nº 02: VERIFICACIONES DE INTERRUPTORES TERMOMAGNETICOS Y CABLES
IMAGEN DE LOS CONDUCTORES EN EL SUBTABLERO DE DISTRIBUCION Nº 01 IMAGEN DE LOS CONDUCTORES DEL TABLERO DEL UPS
IMAGEN DE LOS CONDUCTORES EN EL SUBTABLERO DE DISTRIBUCION Nº 02 IMAGEN DE LOS CONDUCTORES DEL TABLERO DE TRANSFERENCIA
IMAGEN DE LOS CONDUCTORES DEL TABLERO GENERAL DE DISTRIBUCION IMAGEN DEL TABLERO INSTLADO EN LA CACETA DEL GENERADOR
Segun:
Fecha:
Provincia: Dpto.: MADRE DE DIOS
ELABORACIÓN DE PLANOS DE
INSTALACIONES ELÉCTRICAS, INSPECCIÓN
TÉCNICA, DIAGNOSTICO Y ELABORACION
DE CUADRO DE CARGA
ELABORACIÓN DE PLANOS DE I.
E., INSPECCIÓN TÉCNICA,
DIAGNOSTICO Y ELABORACION DE
CUADRO DE CARGA
EMBAJAD DE LOS
ESTADOS UNIDOS DE
AMERICA NAMRU-6
SERVICIOS Y SUMINISTROS Nº
19PE5018P1100
30-04-2018
Ubicación Jr. Cusco C-14, Centro de la Villa Naval Casa 15 y 16, de Puerto Maldonado, Distrito y Provincia de
Tambopata del Departamento de Madre de Dios.
Distrito: TAMBOPATA TAMBOPATA
PERSONAL TECNICO TOMADO LOS DATOS DE PLACA DE LOS EQUIPOS Y ARTEFACTOS
ELECTRICOS
DATOS TECNICOS REALES OBTINOS EN EL CAMPO
PERSONAL REALIZANDO LAS MEDICIONES TECINAS PERSONAL CONTABILIZANDO LA CANTIDAD DE TOMACORRIENTES Y PUNTOS DE LUZ
TOMADO NOTA DE LOS PUNTOS DE LUZ IMAGEN DE EQUIPOS INSTALADOS EN NAMRU-6 MADRE DE DIOS
PARTIDA Nº 04: ELABORACION DE CUADRO DE CARGAS
Segun:
Fecha:
Provincia: Dpto.: MADRE DE DIOS
ELABORACIÓN DE PLANOS DE
INSTALACIONES ELÉCTRICAS, INSPECCIÓN
TÉCNICA, DIAGNOSTICO Y ELABORACION
DE CUADRO DE CARGA
ELABORACIÓN DE PLANOS DE I.
E., INSPECCIÓN TÉCNICA,
DIAGNOSTICO Y ELABORACION DE
CUADRO DE CARGA
EMBAJAD DE LOS
ESTADOS UNIDOS DE
AMERICA NAMRU-6
SERVICIOS Y SUMINISTROS Nº
19PE5018P1100
30-04-2018
Ubicación Jr. Cusco C-14, Centro de la Villa Naval Casa 15 y 16, de Puerto Maldonado, Distrito y Provincia de
Tambopata del Departamento de Madre de Dios.
Distrito: TAMBOPATA TAMBOPATA
INSTALANDO LA CAJA RECTANGULAR DE PVC TIPO PESADO UNA VEZ REALIZADO EL CAMBIO DEL…